2019-02-14 Agenda: Difference between revisions
Jump to navigation
Jump to search
imported>Dpiercy No edit summary |
imported>Peter Scholefield No edit summary |
||
(37 intermediate revisions by 4 users not shown) | |||
Line 4: | Line 4: | ||
*Introductions |
*Introductions |
||
===2019 Objectives - Don=== |
|||
===2019 Objectives === |
|||
*3 Top Priority Bikeways + Active Transportation Manager |
|||
** Presentation to be shared with all North Shore Councils |
** [[media:HUB-NS_2019_Goals_v4.pdf|Draft 4 of Presentation]] to be shared with all North Shore Councils - Don |
||
** Analysis & prioritization of gaps in the 3 priority bikeways. |
|||
** Liaisons to review our Priorities with municipal staff and get agreement |
|||
*Meeting with all Mayors & Councillors |
|||
**Agenda for meetings |
** Liaisons to prepare Agenda for meetings with Mayors & Councillors |
||
* How do we measure progress on these goals? |
|||
===General=== |
===General=== |
||
*RAC meeting - Jay |
*RAC meeting - Jay |
||
**Committee Action Plan provided to HUB |
|||
**Committee handbook being updated |
|||
**Potential white paper on business benefits of bike infrastructure |
|||
**Regional working groups on Central Valley Greenway/Alex Fraser/Pattullo replacement |
|||
**Construction guidelines for bike lanes (Vancouver template) |
|||
*Infrastructure Funding Tracker - Liaisons to provide updates to HUB HQ |
*Infrastructure Funding Tracker - Liaisons to provide updates to HUB HQ |
||
*2018 Infrastructure Successes Map - Jay provided input to HUB HQ |
*[https://bikehub.ca/about-us/infrastructure-successes 2018 Infrastructure Successes Map] - Jay provided input to HUB HQ |
||
*[https://bikehub.ca/about-us/news/the-state-of-cycling-in-metro-vancouver The State of Cycling in Metro Vancouver] - HUB HQ to publish in |
*[https://bikehub.ca/about-us/news/the-state-of-cycling-in-metro-vancouver The State of Cycling in Metro Vancouver] - HUB HQ to publish in early summer |
||
*Translink/HUB - Standardized definitions of Cycling Infrastructure |
**Translink/HUB - Standardized definitions of Cycling Infrastructure |
||
*** Should be publish in late spring |
|||
*** looking for volunteers to do assessments of NS routes. |
|||
* [[Letters to governments|Letters of support for B-Line]] - Don |
|||
** Positive acknowledgments received from: Jordan Black, Steve Ono, Linda Buchanan & Tony Valente |
|||
* Guidelines for future "Letter of Support" - Don |
|||
* HUB Training on NATCO Guidelines - Heather, Paul & Don to attend |
|||
* Budget - Any needs for our committee? |
|||
===Events - Lora === |
===Events - Lora === |
||
Line 25: | Line 37: | ||
===City of North Vancouver - Erika/Heather |
===City of North Vancouver - Erika/Heather=== |
||
*Highlights from January meeting |
*Highlights from January meeting |
||
*[https://www.cnv.org/Get-Involved/Committees/Integrated-Transportation-Committee ITC] - Fiona |
|||
⚫ | |||
**Casano – Loutet Overpass - detailed design 60% done, built in late 2019. requesting bike BC funding |
|||
**Marine Dr Mosquito Creek Bridge - includes protected bike lanes at the sidewalks in two directions, start in March, finish in Fall |
|||
⚫ | |||
**B-Line changes to include 2 sections of off street bikepath: 1) On Third Street along Moodyville Park moving east on the south side 2) from Gladstone to Brooksbank on the southside only. Sent a Letter to Mayor, Council and Staff regarding support for B-Line in general, but also asking for safe bike routes. The route includes Esplanade which really needs fixing. |
|||
**Don and Heather responded to a request for comment from CBC regarding the death of the person cycling along Esplanade. When we get the details, we will think about a HUB response. |
|||
**We have requested monthly meetings with staff (but have not heard back) |
|||
**Attended the INSTPP meeting with TransLink and MLA Bowinn Ma. Many pro-cycling people in the room. |
|||
*CNV response re collision on Green Necklace - http://wiki.bikehub.ca/northshore/images/9/93/CNV_response_re_collision_on_Green_Necklace.pdf |
|||
===District of North Vancouver - Antje/Jay/Giacomo === |
===District of North Vancouver - Antje/Jay/Giacomo === |
||
*Highlights from January meeting |
*Highlights from January meeting |
||
** 3 priority bikeways provided to staff . |
|||
** agreement on top 3 priorities, |
|||
** new wayfinding |
** new wayfinding signage - would like to focus on preferred bikeway routing between Lower Lynn TC / 2nd Narrows and Lynn Valley TC. HUB provided compiled input on what routes we prefer and where improvements are needed for staff assessment. |
||
⚫ | |||
*** requested input on what route we prefer: |
|||
⚫ | |||
****Mountain Highway north of Highway 1 - potential for road diet and uphill bike lane |
|||
*Provided comments on 1st / Mackay buffered bike lanes. |
|||
⚫ | |||
*Bike BC funding support request re: 29th Avenue. Letter of support in progress, will provide conditions for future requests to staff (i.e. must be AAA, preferred on our priority routes). |
|||
⚫ | |||
*B-Line impacts / opportunities. |
|||
*Next meeting - |
*Next meeting - TBD |
||
*Lynn Valley Road northeast of Mountain Highway and Upper Mountain Highway - potential for adding uphill bike lanes to link recreational areas |
|||
*Orwell Pathway construction impacts |
|||
===District of West Vancouver - Paul/Peter=== |
===District of West Vancouver - Paul/Peter=== |
||
*[http://wiki.bikehub.ca/northshore/images/b/b6/2018-11-16_Lions_Gate_Bridge_bike_signage_-_draft.jpg Wayfinding signage proposals at Lions Gate Bridge Interchange on Marine Drive] |
|||
*Speed hump standards |
|||
*[http://wiki.bikehub.ca/northshore/images/2/2f/UGTM_Index_Map_181230a.jpg DWV/DNV links for Gap List] |
|||
*B-Line controversy |
*B-Line controversy |
||
*13 Feb update from John Calimente, DWV Transportation Planning Analyst |
|||
**North Shore e-bike share RFP underway - 1st pilot will be a docking system along Marine Drive corridor, Dundarave to and up Lonsdale, possibly also a dock at Grouse Mountain. |
|||
**Hugo Ray connector - Capilano Bridge to 3rd Street on Hwy 1 - waiting for a permit from MoTI. |
|||
**3rd and Mathers ave to Taylor Way - draft design has been sent to MoTI. |
|||
**Capilano Pacific Trail improvement up to Keith Road - draft design is with MoTI and Purchasing - TransLink funding - construction will take 3-4 weeks. |
|||
**Wayfinding at the north end of Lions Gate Bridge - we will get to comment on the latest iteration. |
|||
**Welch Street Bridge sidewalk widening - the plan is with Squamish Nation - Park Royal wants it finished before the busy summer season - widening will be completed before finalizing approach at the east end. |
|||
**Royal Avenue Horseshoe Bay - on hold because only enough money for the 1st of 3 phases of the streetscape plan. |
|||
**Bike racks for Ambleside and Dundarave - funds are available - design of the racks is being considered whether to adopt a standard or some kind of custom design. |
|||
===Translink - Fred/Antje=== |
===Translink - Fred/Antje=== |
||
*e-Bikes on Buses |
*e-Bikes on Buses - Ask HUB HQ to raise with Translink? |
||
*from HUB HQ meeting with TransLink: SeaBus by bike, Lonsdale Quay parking, Phibbs parking & bike share space |
*from HUB HQ meeting with TransLink: SeaBus by bike, Lonsdale Quay parking, Phibbs parking & bike share space |
||
Latest revision as of 22:19, 15 February 2019
HUB North Shore Committee holds regular meetings at 6:30pm - 8:30pm on the second Thursday of every month. Everybody is welcome. The meetings are at the North Vancouver City Library (14th/Lonsdale) in the Don Preston Boardroom (2nd floor).
- Agenda additions
- Introductions
2019 Objectives
- 3 Top Priority Bikeways + Active Transportation Manager
- Draft 4 of Presentation to be shared with all North Shore Councils - Don
- Liaisons to review our Priorities with municipal staff and get agreement
- Liaisons to prepare Agenda for meetings with Mayors & Councillors
- How do we measure progress on these goals?
General
- RAC meeting - Jay
- Committee Action Plan provided to HUB
- Committee handbook being updated
- Potential white paper on business benefits of bike infrastructure
- Regional working groups on Central Valley Greenway/Alex Fraser/Pattullo replacement
- Construction guidelines for bike lanes (Vancouver template)
- Infrastructure Funding Tracker - Liaisons to provide updates to HUB HQ
- 2018 Infrastructure Successes Map - Jay provided input to HUB HQ
- The State of Cycling in Metro Vancouver - HUB HQ to publish in early summer
- Translink/HUB - Standardized definitions of Cycling Infrastructure
- Should be publish in late spring
- looking for volunteers to do assessments of NS routes.
- Translink/HUB - Standardized definitions of Cycling Infrastructure
- Letters of support for B-Line - Don
- Positive acknowledgments received from: Jordan Black, Steve Ono, Linda Buchanan & Tony Valente
- Guidelines for future "Letter of Support" - Don
- HUB Training on NATCO Guidelines - Heather, Paul & Don to attend
- Budget - Any needs for our committee?
Events - Lora
- Bike to Work Week - May 27-Jun2 2019
- 2019 plan
City of North Vancouver - Erika/Heather
- Highlights from January meeting
- ITC - Fiona
- Casano – Loutet Overpass - detailed design 60% done, built in late 2019. requesting bike BC funding
- Marine Dr Mosquito Creek Bridge - includes protected bike lanes at the sidewalks in two directions, start in March, finish in Fall
- Next meeting -
- B-Line changes to include 2 sections of off street bikepath: 1) On Third Street along Moodyville Park moving east on the south side 2) from Gladstone to Brooksbank on the southside only. Sent a Letter to Mayor, Council and Staff regarding support for B-Line in general, but also asking for safe bike routes. The route includes Esplanade which really needs fixing.
- Don and Heather responded to a request for comment from CBC regarding the death of the person cycling along Esplanade. When we get the details, we will think about a HUB response.
- We have requested monthly meetings with staff (but have not heard back)
- Attended the INSTPP meeting with TransLink and MLA Bowinn Ma. Many pro-cycling people in the room.
- CNV response re collision on Green Necklace - http://wiki.bikehub.ca/northshore/images/9/93/CNV_response_re_collision_on_Green_Necklace.pdf
District of North Vancouver - Antje/Jay/Giacomo
- Highlights from January meeting
- 3 priority bikeways provided to staff .
- new wayfinding signage - would like to focus on preferred bikeway routing between Lower Lynn TC / 2nd Narrows and Lynn Valley TC. HUB provided compiled input on what routes we prefer and where improvements are needed for staff assessment.
- Cycling & Work Zones - have a draft guideline - review comments provided to staff.
- NV Bike masterplan update - RFP for consultants released.
- Provided comments on 1st / Mackay buffered bike lanes.
- Bike BC funding support request re: 29th Avenue. Letter of support in progress, will provide conditions for future requests to staff (i.e. must be AAA, preferred on our priority routes).
- B-Line impacts / opportunities.
- Next meeting - TBD
District of West Vancouver - Paul/Peter
- B-Line controversy
- 13 Feb update from John Calimente, DWV Transportation Planning Analyst
- North Shore e-bike share RFP underway - 1st pilot will be a docking system along Marine Drive corridor, Dundarave to and up Lonsdale, possibly also a dock at Grouse Mountain.
- Hugo Ray connector - Capilano Bridge to 3rd Street on Hwy 1 - waiting for a permit from MoTI.
- 3rd and Mathers ave to Taylor Way - draft design has been sent to MoTI.
- Capilano Pacific Trail improvement up to Keith Road - draft design is with MoTI and Purchasing - TransLink funding - construction will take 3-4 weeks.
- Wayfinding at the north end of Lions Gate Bridge - we will get to comment on the latest iteration.
- Welch Street Bridge sidewalk widening - the plan is with Squamish Nation - Park Royal wants it finished before the busy summer season - widening will be completed before finalizing approach at the east end.
- Royal Avenue Horseshoe Bay - on hold because only enough money for the 1st of 3 phases of the streetscape plan.
- Bike racks for Ambleside and Dundarave - funds are available - design of the racks is being considered whether to adopt a standard or some kind of custom design.
Translink - Fred/Antje
- e-Bikes on Buses - Ask HUB HQ to raise with Translink?
- from HUB HQ meeting with TransLink: SeaBus by bike, Lonsdale Quay parking, Phibbs parking & bike share space