Meeting Agenda: Sept 6, 2018: Difference between revisions
Jump to navigation
Jump to search
imported>Peter Scholefield No edit summary |
imported>Peter Scholefield No edit summary |
||
(9 intermediate revisions by the same user not shown) | |||
Line 3: | Line 3: | ||
Reference Items: |
Reference Items: |
||
*Link for HUB Cycling NS mailing list: https://groups.yahoo.com/neo/groups/hub-nshore/info |
*Link for HUB Cycling NS mailing list: https://groups.yahoo.com/neo/groups/hub-nshore/info |
||
*Letters sent |
*Letters sent since the last meeting on 12 July: [[Media:2018-08-05_CNV_BikeValets.pdf]]<Br> and [[Media:2018-07-28_MOTI_LowerLynnInterchange_Phase3.pdf]]<Br> |
||
[[Media:2018-07-28_MOTI_LowerLynnInterchange_Phase3.pdf]]<Br> |
|||
Agenda: |
Agenda: |
||
*Introductions |
*Introductions |
||
*Agenda additions |
*Agenda additions |
||
*Guest staff member from HUB's new office at 312 Main Street (2nd Floor), Vancouver |
|||
*Events: (http://wiki.bikehub.ca/northshore/images/5/50/2018_Events_overview.pdf) |
*Events: (http://wiki.bikehub.ca/northshore/images/5/50/2018_Events_overview.pdf) |
||
**Coho Festival on 9 Sept |
**Coho Festival on 9 Sept |
||
Line 14: | Line 13: | ||
*General Items |
*General Items |
||
** |
**Transition to the replacement of our chair and vice-chair |
||
**Greg Robins, candidate for council in the District of North Vancouver’s 2018 elections, want to be called (604-561-4971) about improving biking in the District |
|||
**Input to HUB AGM on Saturday, September 8, 2018, at Surrey City Centre Library (Meeting Room 418)- http://wiki.bikehub.ca/northshore/index.php?title=File:HUB_North_Shore_2018_AGM_Update_2_180904.pdf |
|||
**Annual Action Plan for Committee - http://wiki.bikehub.ca/northshore/images/3/36/2018_future_DWV_cycling_infrastructure_projects.pdf |
**Annual Action Plan for Committee - http://wiki.bikehub.ca/northshore/images/3/36/2018_future_DWV_cycling_infrastructure_projects.pdf |
||
**20 in 20 Infrastructure Challenge - http://wiki.bikehub.ca/northshore/index.php?title=File:2018-_20_in_20_Infrastructure_Challenge_Backgrounder_(DRAFT-05-03).pdf |
**20 in 20 Infrastructure Challenge - http://wiki.bikehub.ca/northshore/index.php?title=File:2018-_20_in_20_Infrastructure_Challenge_Backgrounder_(DRAFT-05-03).pdf |
||
Line 23: | Line 24: | ||
'''District of North Vancouver''' |
'''District of North Vancouver''' |
||
*Results of 5 Sept meeting with Doug Hyde on Phibbs Exchange Designs |
*Results of 5 Sept meeting with Doug Hyde on Phibbs Exchange Designs |
||
*Possible improvements to the east approach to the Hwy1 bridge over the Capilano River (http://wiki.bikehub.ca/northshore/images/7/72/EB_Bikes_on_North_Side_of_Cap_River_Hwy_Bridge.pdf) |
*Possible improvements to the east approach to the Hwy1 bridge over the Capilano River (http://wiki.bikehub.ca/northshore/images/7/72/EB_Bikes_on_North_Side_of_Cap_River_Hwy_Bridge.pdf) and http://wiki.bikehub.ca/northshore/index.php?title=File:To_Ryan_Ross_from_Paul_Stott_re_Hwy1_bridge_over_Capilano_River.jpg |
||
*Highway 1/Lower Lynn Improvements Project |
*Highway 1/Lower Lynn Improvements Project - NSMBA letter to MoTI: http://wiki.bikehub.ca/northshore/images/6/63/NSMBA_letter_to_MoTI_on_Lower_Lynn_Interchanges_Aug_2018.pdf |
||
*DNV Developments Updates (Fred Rathje) |
*DNV Developments Updates (Fred Rathje) |
||
*Lynn Valley Road improvements |
*Lynn Valley Road improvements |
||
'''District of West Vancouver''' |
'''District of West Vancouver''' |
||
* |
*Status of proposed safety improvements to the Spirit Trail alongside Welch Street (http://wiki.bikehub.ca/northshore/images/1/1a/Spirit_Trail_Improvements_3-08-18.pdf) |
||
* |
*DWV UnGapThemap updates: |
||
**Wardance Bridge (Gap 515) |
**Wardance Bridge (Gap 515) |
||
**Capilano Pacific Trail from Hwy 1 to Spirit Trail (Gap 513) |
**Capilano Pacific Trail from Hwy 1 to Spirit Trail (Gap 513) |
||
**Taylor Way from Marine Drive to Upper Levels Hwy (Gap 503) |
**Taylor Way from Marine Drive to Upper Levels Hwy (Gap 503) |
||
**Keith Road to 3rd Street |
**East end of Keith Road to 3rd Street |
||
**Added a new gap (Marine Drive from 13th to Taylor Way to include an alternate route called the Ambleside-Park Royal Cycleway (running along the south section of Park Royal). This routing is currently marked as "informal bicycle route on the city's 2018 map", FYI. |
**Added a new gap (Marine Drive from 13th to Taylor Way to include an alternate route called the Ambleside-Park Royal Cycleway (running along the south section of Park Royal). This routing is currently marked as "informal bicycle route on the city's 2018 map", FYI. |
||
'''City of North Vancouver''' |
'''City of North Vancouver''' |
||
*Results of meeting between HUB-NS and City of North Vancouver Engineering, Parks and Environment staff. |
*Results of meeting between HUB-NS and City of North Vancouver Engineering, Parks and Environment staff. |
||
*City of North Vancouver |
*City of North Vancouver Engineering Department Bike Route Construction Brochure - http://wiki.bikehub.ca/northshore/index.php?title=File:Bike_Construction_Brochure_final-1.pdf |
||
*Marine Drive East between Fell and Bewicke |
*Marine Drive East between Fell and Bewicke |
||
*Grand Boulevard Intersection connections |
*Grand Boulevard Intersection connections |
Latest revision as of 00:25, 6 September 2018
HUB North Shore Committee holds regular meetings at 6:30pm - 8:30pm on the second Thursday of every month. Everybody is welcome. The meetings are at the North Vancouver City Library (14th/Lonsdale) in the Don Preston Boardroom (2nd floor).
Reference Items:
- Link for HUB Cycling NS mailing list: https://groups.yahoo.com/neo/groups/hub-nshore/info
- Letters sent since the last meeting on 12 July: Media:2018-08-05_CNV_BikeValets.pdf
and Media:2018-07-28_MOTI_LowerLynnInterchange_Phase3.pdf
Agenda:
- Introductions
- Agenda additions
- Guest staff member from HUB's new office at 312 Main Street (2nd Floor), Vancouver
- Events: (http://wiki.bikehub.ca/northshore/images/5/50/2018_Events_overview.pdf)
- Coho Festival on 9 Sept
- There is a HUB NS calendar which can be incorporated into a calendar program: https://calendar.google.com/calendar/ical/hub.ns.events%40gmail.com/public/basic.ics
- General Items
- Transition to the replacement of our chair and vice-chair
- Greg Robins, candidate for council in the District of North Vancouver’s 2018 elections, want to be called (604-561-4971) about improving biking in the District
- Input to HUB AGM on Saturday, September 8, 2018, at Surrey City Centre Library (Meeting Room 418)- http://wiki.bikehub.ca/northshore/index.php?title=File:HUB_North_Shore_2018_AGM_Update_2_180904.pdf
- Annual Action Plan for Committee - http://wiki.bikehub.ca/northshore/images/3/36/2018_future_DWV_cycling_infrastructure_projects.pdf
- 20 in 20 Infrastructure Challenge - http://wiki.bikehub.ca/northshore/index.php?title=File:2018-_20_in_20_Infrastructure_Challenge_Backgrounder_(DRAFT-05-03).pdf
- Update to North Shore Bike Map - a link to the digital version is on our wiki in the Resources section and is here: http://wiki.bikehub.ca/northshore/images/a/a2/North_Shore_Bike_Map_July_2018.pdf. The printed printed version should be available sometime in September.
- Status of Letter to send on NS Road Safety Act (Don P)
District of North Vancouver
- Results of 5 Sept meeting with Doug Hyde on Phibbs Exchange Designs
- Possible improvements to the east approach to the Hwy1 bridge over the Capilano River (http://wiki.bikehub.ca/northshore/images/7/72/EB_Bikes_on_North_Side_of_Cap_River_Hwy_Bridge.pdf) and http://wiki.bikehub.ca/northshore/index.php?title=File:To_Ryan_Ross_from_Paul_Stott_re_Hwy1_bridge_over_Capilano_River.jpg
- Highway 1/Lower Lynn Improvements Project - NSMBA letter to MoTI: http://wiki.bikehub.ca/northshore/images/6/63/NSMBA_letter_to_MoTI_on_Lower_Lynn_Interchanges_Aug_2018.pdf
- DNV Developments Updates (Fred Rathje)
- Lynn Valley Road improvements
District of West Vancouver
- Status of proposed safety improvements to the Spirit Trail alongside Welch Street (http://wiki.bikehub.ca/northshore/images/1/1a/Spirit_Trail_Improvements_3-08-18.pdf)
- DWV UnGapThemap updates:
- Wardance Bridge (Gap 515)
- Capilano Pacific Trail from Hwy 1 to Spirit Trail (Gap 513)
- Taylor Way from Marine Drive to Upper Levels Hwy (Gap 503)
- East end of Keith Road to 3rd Street
- Added a new gap (Marine Drive from 13th to Taylor Way to include an alternate route called the Ambleside-Park Royal Cycleway (running along the south section of Park Royal). This routing is currently marked as "informal bicycle route on the city's 2018 map", FYI.
City of North Vancouver
- Results of meeting between HUB-NS and City of North Vancouver Engineering, Parks and Environment staff.
- City of North Vancouver Engineering Department Bike Route Construction Brochure - http://wiki.bikehub.ca/northshore/index.php?title=File:Bike_Construction_Brochure_final-1.pdf
- Marine Drive East between Fell and Bewicke
- Grand Boulevard Intersection connections
- Brian Patterson - Municipal Leaders Ride