Meeting Agenda: Sept 6, 2018: Difference between revisions

From committees
Jump to navigation Jump to search
imported>Peter Scholefield
No edit summary
imported>Peter Scholefield
No edit summary
 
(16 intermediate revisions by 2 users not shown)
Line 3: Line 3:
Reference Items:
Reference Items:
*Link for HUB Cycling NS mailing list: https://groups.yahoo.com/neo/groups/hub-nshore/info
*Link for HUB Cycling NS mailing list: https://groups.yahoo.com/neo/groups/hub-nshore/info
*Letters sent sicne the last meeting on 12 July: [[Media:2018-08-05_CNV_BikeValets.pdf]]<Br>
*Letters sent since the last meeting on 12 July: [[Media:2018-08-05_CNV_BikeValets.pdf]]<Br> and [[Media:2018-07-28_MOTI_LowerLynnInterchange_Phase3.pdf]]<Br>
[[Media:2018-07-28_MOTI_LowerLynnInterchange_Phase3.pdf]]<Br>
Agenda:
Agenda:
*Introductions
*Introductions
*Agenda additions
*Agenda additions
*Guest staff member from HUB's new office at 312 Main Street (2nd Floor), Vancouver

*Events: (http://wiki.bikehub.ca/northshore/images/5/50/2018_Events_overview.pdf)
*Events: (http://wiki.bikehub.ca/northshore/images/5/50/2018_Events_overview.pdf)
**Coho Festival on 9 Sept
**Coho Festival on 9 Sept
Line 14: Line 13:


*General Items
*General Items
** transition to the replacement of our chair and vice-chair.
**Transition to the replacement of our chair and vice-chair
**Greg Robins, candidate for council in the District of North Vancouver’s 2018 elections, want to be called (604-561-4971) about improving biking in the District
**Input to HUB AGM on Saturday, September 8, 2018, at Surrey City Centre Library (Meeting Room 418)- http://wiki.bikehub.ca/northshore/index.php?title=File:HUB_North_Shore_2018_AGM_Update_2_180904.pdf
**Annual Action Plan for Committee - http://wiki.bikehub.ca/northshore/images/3/36/2018_future_DWV_cycling_infrastructure_projects.pdf
**Annual Action Plan for Committee - http://wiki.bikehub.ca/northshore/images/3/36/2018_future_DWV_cycling_infrastructure_projects.pdf
**20 in 20 Infrastructure Challenge - http://wiki.bikehub.ca/northshore/index.php?title=File:2018-_20_in_20_Infrastructure_Challenge_Backgrounder_(DRAFT-05-03).pdf
**20 in 20 Infrastructure Challenge - http://wiki.bikehub.ca/northshore/index.php?title=File:2018-_20_in_20_Infrastructure_Challenge_Backgrounder_(DRAFT-05-03).pdf
***http://wiki.bikehub.ca/northshore/images/9/9b/2018-_20_in_20_Infrastructure_Challenge_Backgrounder_%2805-09%29.pdf http://wiki.bikehub.ca/northshore/images/8/89/DWV_list_of_20_quick_fixes_2018-07-10.jpg
***http://wiki.bikehub.ca/northshore/images/9/9b/2018-_20_in_20_Infrastructure_Challenge_Backgrounder_%2805-09%29.pdf http://wiki.bikehub.ca/northshore/images/8/89/DWV_list_of_20_quick_fixes_2018-07-10.jpg
**Update to North Shore Bike Map - a link to the digital version is on our wiki in the Resources section and is here: http://wiki.bikehub.ca/northshore/images/a/a2/North_Shore_Bike_Map_July_2018.pdf. The printed printed version should be available sometime in September.
**Update to North Shore Bike Map - a link to the digital version is on our wiki in the Resources section and is here: http://wiki.bikehub.ca/northshore/images/a/a2/North_Shore_Bike_Map_July_2018.pdf. The printed printed version should be available sometime in September.
** status of Letter to send on NS Road Safety Act (Don P)
**Status of Letter to send on NS Road Safety Act (Don P)


'''District of North Vancouver'''
'''District of North Vancouver'''
* Results of 5 Sept meeting with Doug Hyde on Phibbs Exchange Designs
*Results of 5 Sept meeting with Doug Hyde on Phibbs Exchange Designs
*Possible improvements to the east approach to the Hwy1 bridge over the Capilano River (http://wiki.bikehub.ca/northshore/images/7/72/EB_Bikes_on_North_Side_of_Cap_River_Hwy_Bridge.pdf)
*Possible improvements to the east approach to the Hwy1 bridge over the Capilano River (http://wiki.bikehub.ca/northshore/images/7/72/EB_Bikes_on_North_Side_of_Cap_River_Hwy_Bridge.pdf) and http://wiki.bikehub.ca/northshore/index.php?title=File:To_Ryan_Ross_from_Paul_Stott_re_Hwy1_bridge_over_Capilano_River.jpg
*Highway 1/Lower Lynn Improvements Project
*Highway 1/Lower Lynn Improvements Project - NSMBA letter to MoTI: http://wiki.bikehub.ca/northshore/images/6/63/NSMBA_letter_to_MoTI_on_Lower_Lynn_Interchanges_Aug_2018.pdf

*DNV Developments Updates (Fred Rathje)
*DNV Developments Updates (Fred Rathje)
*Lynn Valley Road slip lane bullets and letter for improvement
*Lynn Valley Road improvements


'''District of West Vancouver'''
'''District of West Vancouver'''
* status of proposed safety improvement to the Spirit Trail alongside Welch Street (http://wiki.bikehub.ca/northshore/images/1/1a/Spirit_Trail_Improvements_3-08-18.pdf)
*Status of proposed safety improvements to the Spirit Trail alongside Welch Street (http://wiki.bikehub.ca/northshore/images/1/1a/Spirit_Trail_Improvements_3-08-18.pdf)
* DWV UnGapThemap updates
*DWV UnGapThemap updates:
**Wardance Bridge (Gap 515)
**Capilano Pacific Trail from Hwy 1 to Spirit Trail (Gap 513)
**Taylor Way from Marine Drive to Upper Levels Hwy (Gap 503)
**East end of Keith Road to 3rd Street
**Added a new gap (Marine Drive from 13th to Taylor Way to include an alternate route called the Ambleside-Park Royal Cycleway (running along the south section of Park Royal). This routing is currently marked as "informal bicycle route on the city's 2018 map", FYI.
'''City of North Vancouver'''
'''City of North Vancouver'''
*Results of meeting between HUB-NS and City of North Vancouver Traffic Engineering
*Results of meeting between HUB-NS and City of North Vancouver Engineering, Parks and Environment staff.
*City of North Vancouver Engineering Department Bike Route Construction Brochure - http://wiki.bikehub.ca/northshore/index.php?title=File:Bike_Construction_Brochure_final-1.pdf
*Results of July 15th meeting on plans for the new Harry Jerome Recreation (https://bikehub.ca/civicrm/event/info?id=611&reset=1)
*Marine Drive East between Fell and Bewicke
*Marine Drive East between Fell and Bewicke
*Grand Boulevard Intersection connections
*Grand Boulevard Intersection connections
*Brian Patterson - Municipal Leaders Ride
*North Shore Bike Map back on the table - input on routes

Latest revision as of 00:25, 6 September 2018

HUB North Shore Committee holds regular meetings at 6:30pm - 8:30pm on the second Thursday of every month. Everybody is welcome. The meetings are at the North Vancouver City Library (14th/Lonsdale) in the Don Preston Boardroom (2nd floor).

Reference Items:

Agenda:

District of North Vancouver

District of West Vancouver

  • Status of proposed safety improvements to the Spirit Trail alongside Welch Street (http://wiki.bikehub.ca/northshore/images/1/1a/Spirit_Trail_Improvements_3-08-18.pdf)
  • DWV UnGapThemap updates:
    • Wardance Bridge (Gap 515)
    • Capilano Pacific Trail from Hwy 1 to Spirit Trail (Gap 513)
    • Taylor Way from Marine Drive to Upper Levels Hwy (Gap 503)
    • East end of Keith Road to 3rd Street
    • Added a new gap (Marine Drive from 13th to Taylor Way to include an alternate route called the Ambleside-Park Royal Cycleway (running along the south section of Park Royal). This routing is currently marked as "informal bicycle route on the city's 2018 map", FYI.

City of North Vancouver