Meeting Summary: February 9, 2017: Difference between revisions
Jump to navigation
Jump to search
imported>Antje Wahl No edit summary |
imported>Peter Scholefield No edit summary |
||
(One intermediate revision by one other user not shown) | |||
Line 1: | Line 1: | ||
*Introductions: Peter S (Chair), Don P, Fred, Erika, Antje, Dianne, Martyn, Giacomo |
*Introductions: Peter S (Chair), Don P, Fred, Erika, Antje, Dianne, Martyn, Giacomo, Peter |
||
*Review of prior meeting minutes |
*Review of prior meeting minutes |
||
*Sunrise Bike Ride next steps |
*Sunrise Bike Ride next steps |
||
Line 36: | Line 36: | ||
*Province |
*Province |
||
**Hwy 1 - Lower Lynn Improvements - Public Information Sessions on 21 and 25 February http://wiki.bikehub.ca/northshore/index.php?title=File:Hwy-1_lower-lynn-improvement_round2_map_event_20170117.pdf |
**Hwy 1 - Lower Lynn Improvements - Public Information Sessions on 21 and 25 February http://wiki.bikehub.ca/northshore/index.php?title=File:Hwy-1_lower-lynn-improvement_round2_map_event_20170117.pdf |
||
***Giacomo, Antje and Tony to meet with project manager for update on cycling infrastructure and present bike highway visuals |
Latest revision as of 14:52, 10 February 2017
- Introductions: Peter S (Chair), Don P, Fred, Erika, Antje, Dianne, Martyn, Giacomo, Peter
- Review of prior meeting minutes
- Sunrise Bike Ride next steps
- Did not discuss, put on agenda for March when Tony is back
- UnGapTheMap
- Workshop 2: Peter and Fiona want to attend
- Next steps: Peter to find out when workshop takes place, Antje to add gaps in DNV, Peter to review West Van, Antje to ask Andrew to filter by municipality and MOTI
- Recap: SLOW DOWN North Shore public forum Jan 26, 6:30pm: Several committee members attended. Discussed
- HUB Bike Theft Prevention Committee: Dianne reported on progress with Project 529 and relation with HUB, Bike to Work Week stations.
- City of North Vancouver
- Green Necklace Jones to Grand Blvd: Check with Tony, Heather about following up on a meeting. 2nd open house coming up, check dates and send to email list.
- Safety education campaign by City for dooring, safe passing distance
- District of North Vancouver
- Lynn Valley Road underpass update: Tony sent input letter and additional email regarding connection to pathways
- Hunter Street update https://www.dnv.org/1401-1479-hunter-street/481-497-mountain-highway
- Giacomo and Antje met with DNV community planner who explained development and surrounding plans including potential new bridges across Lynn Creek.
- Antje to draft feedback on Seylynn Park design and provide bike parking design guidelines to planner and circulate.
- Snow removal: Tony and Disability Advisory Committee Chair met with Streets Manager about snow removal policy for sidewalks, paths and bike lanes. Tony to draft follow-up letter.
- West Vancouver
- Results of 31 Jan meeting with DWV Engineering staff - What stood out for me at the meeting were the following:
- Heather J., Peter and Neil met with DWV Vanessa Garrett, Norm Wong and John Calimente
- John Calimente's presentation to us based on his proposed new West Vancouver Cycling Network map;
- John Calimente said that, except for the proposed minor changes to the Cycling Network, all of the routes have been signed and now, in phase 4 of the Implementation Plan (2012), they will be focusing on cycling infrastructure and traffic calming on the Network;
- Plans, as a trial, for separated bike lanes on Marine Drive between 26th and 30th Streets;
- Plans to improve the connection between Cranley Drive and the Sea View Walk;
- Plans to consult soon with MoTI to fix that section on the north side of Hwy 1 between the bridge over the Capilano River and 3rd Street;
- John Calimente's Lions Gate Bridge area bike signage plan and his request for feedback on it (I'll ask for a pdf version to circulate);
- Status of the plans to extend the Spirit Trail down into Horseshoe Bay Village (consider new development in Horseshoe Bay)
- Did not discuss due to lack of update
- HUB delegation topics: We will provide update on HUB activities, successes in West Van. Peter to put in delegation request.
- Results of 31 Jan meeting with DWV Engineering staff - What stood out for me at the meeting were the following:
- Province
- Hwy 1 - Lower Lynn Improvements - Public Information Sessions on 21 and 25 February http://wiki.bikehub.ca/northshore/index.php?title=File:Hwy-1_lower-lynn-improvement_round2_map_event_20170117.pdf
- Giacomo, Antje and Tony to meet with project manager for update on cycling infrastructure and present bike highway visuals
- Hwy 1 - Lower Lynn Improvements - Public Information Sessions on 21 and 25 February http://wiki.bikehub.ca/northshore/index.php?title=File:Hwy-1_lower-lynn-improvement_round2_map_event_20170117.pdf