Meeting Summary: October 13, 2016: Difference between revisions
Jump to navigation
Jump to search
imported>Peter Scholefield No edit summary |
imported>Peter Scholefield No edit summary |
||
(3 intermediate revisions by the same user not shown) | |||
Line 6: | Line 6: | ||
*** Obsession Bikes will provide a mechanic - Dianne |
*** Obsession Bikes will provide a mechanic - Dianne |
||
*** Refreshments - Cobb's Bread? – Antje to arrange, Energy drink – same as spring? – Dianne to arrange as well as coffee |
*** Refreshments - Cobb's Bread? – Antje to arrange, Energy drink – same as spring? – Dianne to arrange as well as coffee |
||
*** 529 Registration – Dianne will check and if they can |
*** 529 Registration – Dianne will check and if they can attend, Don will check with RCMP. |
||
*** Booth staff – Erika, Giacomo, Dianne, Don, (others to contact Dianne) |
*** Booth staff – Erika, Giacomo, Dianne, Don, (others to contact Dianne) |
||
*** Draw – bike |
*** Draw – bike tuneup from Obsessions - Dianne |
||
*** Permit – MOTI – HUB HQ/Dianne |
*** Permit – MOTI – HUB HQ/Dianne |
||
*** Other BTWW stations: |
*** Other BTWW stations: |
||
Line 20: | Line 20: | ||
*** CNV has adopted Vision Zero |
*** CNV has adopted Vision Zero |
||
*** NV RCMP will be enforcing laws at cross-walks on mid-Lonsdale. |
*** NV RCMP will be enforcing laws at cross-walks on mid-Lonsdale. |
||
** MP Gord Johns Canadian Cycling Strategy - |
** MP Gord Johns Canadian Cycling Strategy - bill has been introduced but won't be debated for some time - we individually should ask our MPs to support it. |
||
** HUB-NS HUB membership update - Peter has latest list and will distribute total number of members. |
** HUB-NS HUB membership update - Peter has the latest list and will distribute total number of members. |
||
** Volunteers for public art cycling footage along the Spirit Trail - Heather will coordinate. |
** Volunteers for public art cycling footage along the Spirit Trail - Heather will coordinate. |
||
Municipalities |
Municipalities |
||
*DNV Update |
*DNV Update |
||
** Maplewood TC workshop, Tue 18th - Nelson, Antje, Giacomo have been invited. |
** Maplewood TC workshop, Tue 18th - Nelson, Antje, Giacomo have been invited. |
||
** Council passed resolution for a Protected Bike Network (thanks to Mathew Bond. |
** Council passed resolution for a Protected Bike Network (thanks to Mathew Bond). |
||
** We will provide our “ungap the map” evaluation as input for criterion but phrase it more to towards the Bike Network Master Plan - Antje |
** We will provide our “ungap the map” evaluation as input for criterion but phrase it more to towards the Bike Network Master Plan - Antje |
||
** Fred, Nelson, Heather will provide input. |
** Fred, Nelson, Heather will provide input. |
||
Line 33: | Line 33: | ||
*CNV |
*CNV |
||
** Northern section of Green necklace planned along 21st St. then 19th to Grand Boulevard – Heather to draft letter proposing separated bike route avoiding the MUP through the hills in park. |
** Northern section of Green necklace planned along 21st St. then 19th to Grand Boulevard – Heather to draft letter proposing separated bike route avoiding the MUP through the hills in park. |
||
**West Keith design – several attended workshop earlier in the evening - protected bike-lanes and MUP uphill, sharrows downhill - problem with cyclists riding down MUP. |
** West Keith design – several attended workshop earlier in the evening - protected bike-lanes and MUP uphill, sharrows downhill - problem with cyclists riding down MUP. |
||
** We can provide more input after hearing from Adolfo from CNV who will be at our November meeting to discuss. |
** We can provide more input after hearing from Adolfo from CNV who will be at our November meeting to discuss. |
||
** Poster boards and input comments at:http://www.cnv.org/city-services/streets-and-transportation/cycling/cycling-projects/west-keith-road |
** Poster boards and input comments at:http://www.cnv.org/city-services/streets-and-transportation/cycling/cycling-projects/west-keith-road. |
||
** HUB-NS 2016 update to council in December - ten minutes – Heather and Tony will present |
** HUB-NS 2016 update to council in December - ten minutes – Heather and Tony will present. |
||
*DWV Update |
*DWV Update |
||
**Park Royal Cycling Issues |
**Park Royal Cycling Issues |
||
*** Peter designated as HUB-NS contact person for Park Royal cycling Issues. |
*** Peter designated as HUB-NS contact person for Park Royal cycling Issues. |
||
*** in response to an offer from Rick Amantea, Peter will provide guidance on wayfinding signage at west exit from the War Dance Bridge. |
*** in response to an offer from Rick Amantea, Peter will provide guidance on wayfinding signage at west exit from the War Dance Bridge. |
||
*** |
*** Park Roya have repainted sharrows in green boxes on the bridge on the side of lanes instead of the middle - suggest painting a few more in the middle of the eastbound lane. |
||
*** We should also suggest a separate crossing for cyclists at the east exit from the bridge |
*** We should also suggest a separate crossing for cyclists at the east exit from the bridge beside the existing crosswalk. |
||
*** Peter to prepare a HUB letter suggesting two options for separating cyclists from traffic crossing the Capilano |
*** Peter to prepare a HUB letter suggesting two options for separating cyclists from traffic crossing the Capilano River to connect the Spirit Trail on either side. |
||
** Marine Drive Context Study open house - Peter attended and talked with DWV Roads Manager, Vanessa Garrett on Wednesday October 12 - needs more cycling infrastructure including separated bike lanes. |
** Marine Drive Context Study open house - Peter attended and talked with DWV Roads Manager, Vanessa Garrett on Wednesday October 12 - needs more cycling infrastructure including separated bike lanes. |
||
*** Antje will draft an official HUB letter. |
*** Antje will draft an official HUB letter. |
||
Line 51: | Line 51: | ||
** 15th Street Mathers to Queens - District is working on adding a separated bike-lane uphill after public consultation. |
** 15th Street Mathers to Queens - District is working on adding a separated bike-lane uphill after public consultation. |
||
** DWV is looking to placing pavement dividing markers on Marine Drive west of the West van Yacht club but we should instead suggest green boxes with bicycle/sharrow stencils. |
** DWV is looking to placing pavement dividing markers on Marine Drive west of the West van Yacht club but we should instead suggest green boxes with bicycle/sharrow stencils. |
||
529 Registration – Dianne will check and if they can't attend, Don will check with RCMP. (should be can) |
|||
Booth staff – Erika, Giacomo, Dianne, Don, (others to contact Dianne) |
|||
Draw – bike bag - Dianne (should be bike tuneup from Obsessions) |
Latest revision as of 00:52, 9 December 2016
- Introductions: Peter S (chair), Peter, Fred, Fiona, Dianne, Giacomo, Nelson, Erika, Antje, Don, Heather D
- Events Planning - Review of past and planning for upcoming events
- Coho Festival - good weather, lots of traffic to our tent including WV by-election candidate Andy Krwazyck, 529 was in a nearby booth with West Van Police taking registrations.
- BTWW Fall Thursday, Oct 27th ,4-6pm at North end of IWMB where we were in the spring.
- 3 or 4 Tents (Don & Dianne to see if we can fit 4, back further from sidewalk.
- Obsession Bikes will provide a mechanic - Dianne
- Refreshments - Cobb's Bread? – Antje to arrange, Energy drink – same as spring? – Dianne to arrange as well as coffee
- 529 Registration – Dianne will check and if they can attend, Don will check with RCMP.
- Booth staff – Erika, Giacomo, Dianne, Don, (others to contact Dianne)
- Draw – bike tuneup from Obsessions - Dianne
- Permit – MOTI – HUB HQ/Dianne
- Other BTWW stations:
- DWV sponsor HUB HQ running it at the NE end of the Lions Gate Bridge, Wednesday, October 26, 4:00 - 6:00 pm.
- CNV - 1st and Mackay, Thursday, October 27, 6:30am - 9:00am
- DNV - 2nd narrow in morning?
- Others? Coastal health?
- HUB
- Vision0 30km/hr - protecting cyclists & pedestrians on residential streets.
- BC Ministry of Public Safety – has issued guidelines: http://www2.gov.bc.ca/assets/gov/driving-and-transportation/driving/publications/road-safety-strategy-update-vision-zero.pdf
- CNV has adopted Vision Zero
- NV RCMP will be enforcing laws at cross-walks on mid-Lonsdale.
- MP Gord Johns Canadian Cycling Strategy - bill has been introduced but won't be debated for some time - we individually should ask our MPs to support it.
- HUB-NS HUB membership update - Peter has the latest list and will distribute total number of members.
- Volunteers for public art cycling footage along the Spirit Trail - Heather will coordinate.
- Vision0 30km/hr - protecting cyclists & pedestrians on residential streets.
Municipalities
- DNV Update
- Maplewood TC workshop, Tue 18th - Nelson, Antje, Giacomo have been invited.
- Council passed resolution for a Protected Bike Network (thanks to Mathew Bond).
- We will provide our “ungap the map” evaluation as input for criterion but phrase it more to towards the Bike Network Master Plan - Antje
- Fred, Nelson, Heather will provide input.
- Tony will present a HUB 2016 Update to council - Nov 21, 7pm – 5 minutes only!
- Capilano Road: Uphill bike lane is between parked cars and traffic. Would have preferred bike lane on the outside. No parking on downhill side. Both directions are unprotected.
- CNV
- Northern section of Green necklace planned along 21st St. then 19th to Grand Boulevard – Heather to draft letter proposing separated bike route avoiding the MUP through the hills in park.
- West Keith design – several attended workshop earlier in the evening - protected bike-lanes and MUP uphill, sharrows downhill - problem with cyclists riding down MUP.
- We can provide more input after hearing from Adolfo from CNV who will be at our November meeting to discuss.
- Poster boards and input comments at:http://www.cnv.org/city-services/streets-and-transportation/cycling/cycling-projects/west-keith-road.
- HUB-NS 2016 update to council in December - ten minutes – Heather and Tony will present.
- DWV Update
- Park Royal Cycling Issues
- Peter designated as HUB-NS contact person for Park Royal cycling Issues.
- in response to an offer from Rick Amantea, Peter will provide guidance on wayfinding signage at west exit from the War Dance Bridge.
- Park Roya have repainted sharrows in green boxes on the bridge on the side of lanes instead of the middle - suggest painting a few more in the middle of the eastbound lane.
- We should also suggest a separate crossing for cyclists at the east exit from the bridge beside the existing crosswalk.
- Peter to prepare a HUB letter suggesting two options for separating cyclists from traffic crossing the Capilano River to connect the Spirit Trail on either side.
- Marine Drive Context Study open house - Peter attended and talked with DWV Roads Manager, Vanessa Garrett on Wednesday October 12 - needs more cycling infrastructure including separated bike lanes.
- Antje will draft an official HUB letter.
- At the 25 July council meeting, the Horseshoe Bay Streetscape Plan was approved but the proposed two-way separated bike lane down the steep part of Royal Avenue was south of the planned area.
- Peter to consult with Heather J with regard to cycle access to Horseshoe Bay.
- 1100 block Keith Road westbound bike lane is still incomplete so Peter will write to Vanessa Garrett.
- 15th Street Mathers to Queens - District is working on adding a separated bike-lane uphill after public consultation.
- DWV is looking to placing pavement dividing markers on Marine Drive west of the West van Yacht club but we should instead suggest green boxes with bicycle/sharrow stencils.
- Park Royal Cycling Issues
529 Registration – Dianne will check and if they can't attend, Don will check with RCMP. (should be can)
Booth staff – Erika, Giacomo, Dianne, Don, (others to contact Dianne)
Draw – bike bag - Dianne (should be bike tuneup from Obsessions)