Meeting Summary: October 13, 2016: Difference between revisions

From committees
Jump to navigation Jump to search
imported>Peter Scholefield
No edit summary
imported>Peter Scholefield
No edit summary
 
(4 intermediate revisions by the same user not shown)
Line 2: Line 2:
*Events Planning - Review of past and planning for upcoming events
*Events Planning - Review of past and planning for upcoming events
**Coho Festival - good weather, lots of traffic to our tent including WV by-election candidate Andy Krwazyck, 529 was in a nearby booth with West Van Police taking registrations.
**Coho Festival - good weather, lots of traffic to our tent including WV by-election candidate Andy Krwazyck, 529 was in a nearby booth with West Van Police taking registrations.
**BTWW Fall Thursday, Oct 27th ,4-6pm qat North end of IWMB where we were in the spring
**BTWW Fall Thursday, Oct 27th ,4-6pm at North end of IWMB where we were in the spring.
*** 3 or 4 Tents (Don & Dianne to see if we can fit 4, back further from sidewalk)
*** 3 or 4 Tents (Don & Dianne to see if we can fit 4, back further from sidewalk.
*** Obsession Bikes will provide a mechanic - Dianne
*** Obsession Bikes will provide a mechanic - Dianne
*** Refreshments - Cobb's Bread? – Antje to arrange, Energy drink – same as spring? – Dianne to arrange as well as coffee
*** Refreshments - Cobb's Bread? – Antje to arrange, Energy drink – same as spring? – Dianne to arrange as well as coffee
*** 529 Registration – Dianne will check and if they can't attend, Don will check with RCMP
*** 529 Registration – Dianne will check and if they can attend, Don will check with RCMP.
*** Booth staff – Erika, Giacomo, Dianne, Don, (others to contact Dianne)
*** Booth staff – Erika, Giacomo, Dianne, Don, (others to contact Dianne)
*** Draw – bike bag - Dianne
*** Draw – bike tuneup from Obsessions - Dianne
*** Permit – MOTI – HUB HQ/Dianne
*** Permit – MOTI – HUB HQ/Dianne
*** Other BTWW stations:
*** Other BTWW stations:
**** DWV sponsor HUB HQ running it at the NE end of the Lions Gate Bridge, Wednesday, October 26, 4:00 - 6:00 pm
**** DWV sponsor HUB HQ running it at the NE end of the Lions Gate Bridge, Wednesday, October 26, 4:00 - 6:00 pm.
**** CNV - 1st and Mackay, Thursday, October 27, 6:30am - 9:00am
**** CNV - 1st and Mackay, Thursday, October 27, 6:30am - 9:00am
**** DNV - 2nd narrow in morning?
**** DNV - 2nd narrow in morning?
**** Others? Coastal health?
**** Others? Coastal health?
*HUB
*HUB
** Vision0 30km/hr - protecting cyclists & pedestrians on residential streets
** Vision0 30km/hr - protecting cyclists & pedestrians on residential streets.
*** BC Ministry of Public Safety – has issued guidelines: http://www2.gov.bc.ca/assets/gov/driving-and-transportation/driving/publications/road-safety-strategy-update-vision-zero.pdf
*** BC Ministry of Public Safety – has issued guidelines: http://www2.gov.bc.ca/assets/gov/driving-and-transportation/driving/publications/road-safety-strategy-update-vision-zero.pdf
*** CNV has adopted Vision Zero
*** CNV has adopted Vision Zero
*** NV RCMP will be enforcing laws at cross-walks on mid-Lonsdale.
*** NV RCMP will be enforcing laws at cross-walks on mid-Lonsdale.
** MP Gord Johns Canadian Cycling Strategy - bil has been intriduced but won't be debated for some time - we inidivually should ask our MPs to support it.
** MP Gord Johns Canadian Cycling Strategy - bill has been introduced but won't be debated for some time - we individually should ask our MPs to support it.
** HUB-NS HUB membership update - Peter has latest list and will disribute tola number of members
** HUB-NS HUB membership update - Peter has the latest list and will distribute total number of members.
** Volunteers for public art cycling footage along the Spirit Trail - Heather will coordinate.
** Volunteers for public art cycling footage along the Spirit Trail - Heather will coordinate.
Municipalities
Municipalities
*DNV Update
*DNV Update
** Maplewood TC workshop, Tue 18th - Nelson, Antje, Giacomo have been invited.
** Maplewood TC workshop, Tue 18th - Nelson, Antje, Giacomo have been invited.
** Council passed resolution for a Protected Bike Network (thanks to Mathew Bond)
** Council passed resolution for a Protected Bike Network (thanks to Mathew Bond).
** We will provide our “ungap the map” evaluation as input for criterion but phrase it more to towards the Bike Network Master Paln Antje
** We will provide our “ungap the map” evaluation as input for criterion but phrase it more to towards the Bike Network Master Plan - Antje
** Fred, Nelson, Heather will provide input.
** Fred, Nelson, Heather will provide input.
** Tony will present a HUB 2016 Update to council - Nov 21, 7pm – 5 minutes only!
** Tony will present a HUB 2016 Update to council - Nov 21, 7pm – 5 minutes only!
Line 33: Line 33:
*CNV
*CNV
** Northern section of Green necklace planned along 21st St. then 19th to Grand Boulevard – Heather to draft letter proposing separated bike route avoiding the MUP through the hills in park.
** Northern section of Green necklace planned along 21st St. then 19th to Grand Boulevard – Heather to draft letter proposing separated bike route avoiding the MUP through the hills in park.
**West Keith design – several attend workshop earlier in the evening - protected bike-lanes and MUP uphill, sharrows downhill - problem with cyclists riding down MUP.
** West Keith design – several attended workshop earlier in the evening - protected bike-lanes and MUP uphill, sharrows downhill - problem with cyclists riding down MUP.
** We can provide more input after hearing from Adolfo from CNV who will be at our November meeting to discuss.
** We can provide more input after hearing from Adolfo from CNV who will be at our November meeting to discuss.
** poster boards and input comments at:http://www.cnv.org/city-services/streets-and-transportation/cycling/cycling-projects/west-keith-road
** Poster boards and input comments at:http://www.cnv.org/city-services/streets-and-transportation/cycling/cycling-projects/west-keith-road.
** HUB-NS 2016 update to council in December - ten minutes – Heather and Tony will present
** HUB-NS 2016 update to council in December - ten minutes – Heather and Tony will present.
*DWV Update
*DWV Update
**Park Royal Cycling Issues
**Park Royal Cycling Issues
*** Peter designated as HUB-NS contact person for Park Royal cycling Issues
*** Peter designated as HUB-NS contact person for Park Royal cycling Issues.
*** in response to an offer from Rick Amantea, Peter will provide guidance on wayfinding signage at west exit from the War Dance Bridge
*** in response to an offer from Rick Amantea, Peter will provide guidance on wayfinding signage at west exit from the War Dance Bridge.
*** PR have repainted sharrows in green boxes on the bridge on the side of lanes instead of the middle - suggest painting a few more in the middle of the eastbound lane.
*** Park Roya have repainted sharrows in green boxes on the bridge on the side of lanes instead of the middle - suggest painting a few more in the middle of the eastbound lane.
*** We should also suggest a sepate crossing for cyclist at the east exit from the bridge
*** We should also suggest a separate crossing for cyclists at the east exit from the bridge beside the existing crosswalk.
*** Peter to prepare a HUB letter suggesting two options for separating cyclists from traffic crossing the Capilano river to connect the Spirit Trail on either side.
*** Peter to prepare a HUB letter suggesting two options for separating cyclists from traffic crossing the Capilano River to connect the Spirit Trail on either side.
** Marine Drive Context Study open house - Peter attended and talked with DWV Roads Manager, Vanessa Garrett on Wednesday October 12 - needs more cycling infrastructure including separated bike lanes.
** Marine Drive Context Study open house - Peter attended and talked with DWV Roads Manager, Vanessa Garrett on Wednesday October 12 - needs more cycling infrastructure including separated bike lanes.
*** Antje will draft an official HUB letter.
*** Antje will draft an official HUB letter.
** At the 25 July council meeting, the Horseshoe Bay Streetscape Plan was approved but the proposed two-way separated bike lane down the steep part of Royal Avenue was south of the planned area.
** At the 25 July council meeting, the Horseshoe Bay Streetscape Plan was approved but the proposed two-way separated bike lane down the steep part of Royal Avenue was south of the planned area.
*** Peter to aconsult with Heather J with regard to cycle access to Horseshoe Bay.
*** Peter to consult with Heather J with regard to cycle access to Horseshoe Bay.
** 1100 block Keith Road westbound bike lane is still incomplete so Peter will write to Vanessa Garrett.
** 1100 block Keith Road westbound bike lane is still incomplete so Peter will write to Vanessa Garrett.
** 15th Street Mathers to Queens - District is working on adding a separated bike-lane uphill after public consultation.
** 15th Street Mathers to Queens - District is working on adding a separated bike-lane uphill after public consultation.
** DWV is looking to placing pavement dividing markers on Marine Drive west of the West van Yacht club but we should instead suggest green boxes with bicycle/sharrow stencils.
** DWV is looking to placing pavement dividing markers on Marine Drive west of the West van Yacht club but we should instead suggest green boxes with bicycle/sharrow stencils.


529 Registration – Dianne will check and if they can't attend, Don will check with RCMP. (should be can)
Booth staff – Erika, Giacomo, Dianne, Don, (others to contact Dianne)
Draw – bike bag - Dianne (should be bike tuneup from Obsessions)

Latest revision as of 00:52, 9 December 2016

  • Introductions: Peter S (chair), Peter, Fred, Fiona, Dianne, Giacomo, Nelson, Erika, Antje, Don, Heather D
  • Events Planning - Review of past and planning for upcoming events
    • Coho Festival - good weather, lots of traffic to our tent including WV by-election candidate Andy Krwazyck, 529 was in a nearby booth with West Van Police taking registrations.
    • BTWW Fall Thursday, Oct 27th ,4-6pm at North end of IWMB where we were in the spring.
      • 3 or 4 Tents (Don & Dianne to see if we can fit 4, back further from sidewalk.
      • Obsession Bikes will provide a mechanic - Dianne
      • Refreshments - Cobb's Bread? – Antje to arrange, Energy drink – same as spring? – Dianne to arrange as well as coffee
      • 529 Registration – Dianne will check and if they can attend, Don will check with RCMP.
      • Booth staff – Erika, Giacomo, Dianne, Don, (others to contact Dianne)
      • Draw – bike tuneup from Obsessions - Dianne
      • Permit – MOTI – HUB HQ/Dianne
      • Other BTWW stations:
        • DWV sponsor HUB HQ running it at the NE end of the Lions Gate Bridge, Wednesday, October 26, 4:00 - 6:00 pm.
        • CNV - 1st and Mackay, Thursday, October 27, 6:30am - 9:00am
        • DNV - 2nd narrow in morning?
        • Others? Coastal health?
  • HUB
    • Vision0 30km/hr - protecting cyclists & pedestrians on residential streets.
    • MP Gord Johns Canadian Cycling Strategy - bill has been introduced but won't be debated for some time - we individually should ask our MPs to support it.
    • HUB-NS HUB membership update - Peter has the latest list and will distribute total number of members.
    • Volunteers for public art cycling footage along the Spirit Trail - Heather will coordinate.

Municipalities

  • DNV Update
    • Maplewood TC workshop, Tue 18th - Nelson, Antje, Giacomo have been invited.
    • Council passed resolution for a Protected Bike Network (thanks to Mathew Bond).
    • We will provide our “ungap the map” evaluation as input for criterion but phrase it more to towards the Bike Network Master Plan - Antje
    • Fred, Nelson, Heather will provide input.
    • Tony will present a HUB 2016 Update to council - Nov 21, 7pm – 5 minutes only!
    • Capilano Road: Uphill bike lane is between parked cars and traffic. Would have preferred bike lane on the outside. No parking on downhill side. Both directions are unprotected.
  • CNV
    • Northern section of Green necklace planned along 21st St. then 19th to Grand Boulevard – Heather to draft letter proposing separated bike route avoiding the MUP through the hills in park.
    • West Keith design – several attended workshop earlier in the evening - protected bike-lanes and MUP uphill, sharrows downhill - problem with cyclists riding down MUP.
    • We can provide more input after hearing from Adolfo from CNV who will be at our November meeting to discuss.
    • Poster boards and input comments at:http://www.cnv.org/city-services/streets-and-transportation/cycling/cycling-projects/west-keith-road.
    • HUB-NS 2016 update to council in December - ten minutes – Heather and Tony will present.
  • DWV Update
    • Park Royal Cycling Issues
      • Peter designated as HUB-NS contact person for Park Royal cycling Issues.
      • in response to an offer from Rick Amantea, Peter will provide guidance on wayfinding signage at west exit from the War Dance Bridge.
      • Park Roya have repainted sharrows in green boxes on the bridge on the side of lanes instead of the middle - suggest painting a few more in the middle of the eastbound lane.
      • We should also suggest a separate crossing for cyclists at the east exit from the bridge beside the existing crosswalk.
      • Peter to prepare a HUB letter suggesting two options for separating cyclists from traffic crossing the Capilano River to connect the Spirit Trail on either side.
    • Marine Drive Context Study open house - Peter attended and talked with DWV Roads Manager, Vanessa Garrett on Wednesday October 12 - needs more cycling infrastructure including separated bike lanes.
      • Antje will draft an official HUB letter.
    • At the 25 July council meeting, the Horseshoe Bay Streetscape Plan was approved but the proposed two-way separated bike lane down the steep part of Royal Avenue was south of the planned area.
      • Peter to consult with Heather J with regard to cycle access to Horseshoe Bay.
    • 1100 block Keith Road westbound bike lane is still incomplete so Peter will write to Vanessa Garrett.
    • 15th Street Mathers to Queens - District is working on adding a separated bike-lane uphill after public consultation.
    • DWV is looking to placing pavement dividing markers on Marine Drive west of the West van Yacht club but we should instead suggest green boxes with bicycle/sharrow stencils.


529 Registration – Dianne will check and if they can't attend, Don will check with RCMP. (should be can) Booth staff – Erika, Giacomo, Dianne, Don, (others to contact Dianne) Draw – bike bag - Dianne (should be bike tuneup from Obsessions)