Meeting Summary: October 13, 2016: Difference between revisions
Jump to navigation
Jump to search
imported>Peter Scholefield (Created page with "*Introductions: Peter S (chair), Peter, Fred, Fiona, Dianne, Giacomo, Nelson, Erika, Antje, Don, *Minutes Review (5 min) *Events Planning - Review of past and planning for upc...") |
imported>Peter Scholefield No edit summary |
||
(11 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
*Introductions: Peter S (chair), Peter, Fred, Fiona, Dianne, Giacomo, Nelson, Erika, Antje, Don, |
*Introductions: Peter S (chair), Peter, Fred, Fiona, Dianne, Giacomo, Nelson, Erika, Antje, Don, Heather D |
||
*Minutes Review (5 min) |
|||
*Events Planning - Review of past and planning for upcoming events |
*Events Planning - Review of past and planning for upcoming events |
||
**Coho Festival - good weather, lots of traffic to our tent including WV by-election candidate Andy Krwazyck, 529 was in a nearby booth with West Van Police taking registrations. |
|||
**Coho Festival (Dianne, 5 min) |
|||
**BTWW Fall Thursday, Oct 27th ,4-6pm at North end of IWMB where we were in the spring. |
|||
**BTWW October 2016 - where, when, who (Dianne, 10 min) |
|||
*** 3 or 4 Tents (Don & Dianne to see if we can fit 4, back further from sidewalk. |
|||
***Mechanic: Obsession Bikes |
|||
*** Obsession Bikes will provide a mechanic - Dianne |
|||
*** Refreshments - Cobb's Bread? – Antje to arrange, Energy drink – same as spring? – Dianne to arrange as well as coffee |
|||
*** 529 Registration – Dianne will check and if they can attend, Don will check with RCMP. |
|||
*** Booth staff – Erika, Giacomo, Dianne, Don, (others to contact Dianne) |
|||
*** Draw – bike tuneup from Obsessions - Dianne |
|||
*** Permit – MOTI – HUB HQ/Dianne |
|||
*** Other BTWW stations: |
|||
**** DWV sponsor HUB HQ running it at the NE end of the Lions Gate Bridge, Wednesday, October 26, 4:00 - 6:00 pm. |
|||
**** CNV - 1st and Mackay, Thursday, October 27, 6:30am - 9:00am |
|||
**** DNV - 2nd narrow in morning? |
|||
**** Others? Coastal health? |
|||
*HUB |
*HUB |
||
** Vision0 30km/hr |
** Vision0 30km/hr - protecting cyclists & pedestrians on residential streets. |
||
*** BC Ministry of Public Safety – has issued guidelines: http://www2.gov.bc.ca/assets/gov/driving-and-transportation/driving/publications/road-safety-strategy-update-vision-zero.pdf |
|||
** MP Gord Johns Canadian Cycling Strategy (Peter, 5 min) |
|||
*** CNV has adopted Vision Zero |
|||
** HUB-NS HUB membership update (Peter, 5 min) |
|||
*** NV RCMP will be enforcing laws at cross-walks on mid-Lonsdale. |
|||
** Volunteers for public art cycling footage along the Spirit Trail (Peter, 5 min) |
|||
** MP Gord Johns Canadian Cycling Strategy - bill has been introduced but won't be debated for some time - we individually should ask our MPs to support it. |
|||
** HUB-NS HUB membership update - Peter has the latest list and will distribute total number of members. |
|||
** Volunteers for public art cycling footage along the Spirit Trail - Heather will coordinate. |
|||
Municipalities |
Municipalities |
||
*DNV Update |
*DNV Update |
||
** Maplewood TC workshop, Tue 18th - Nelson, Antje, Giacomo have been invited. |
|||
**Connected protected bike network motion passed - prioritizing routes with ungapthemap tool (Antje, 20 min) |
|||
** Council passed resolution for a Protected Bike Network (thanks to Mathew Bond). |
|||
**Maplewood design charette Oct 18 & 19 (Nelson, 5 min) |
|||
** We will provide our “ungap the map” evaluation as input for criterion but phrase it more to towards the Bike Network Master Plan - Antje |
|||
**Nov 21 7pm HUB Delegation to Council (Antje, 5 min) |
|||
** Fred, Nelson, Heather will provide input. |
|||
**Capilano Road repaving and bike lanes completed (5 min) |
|||
** Tony will present a HUB 2016 Update to council - Nov 21, 7pm – 5 minutes only! |
|||
** Capilano Road: Uphill bike lane is between parked cars and traffic. Would have preferred bike lane on the outside. No parking on downhill side. Both directions are unprotected. |
|||
*CNV |
|||
** Northern section of Green necklace planned along 21st St. then 19th to Grand Boulevard – Heather to draft letter proposing separated bike route avoiding the MUP through the hills in park. |
|||
** West Keith design – several attended workshop earlier in the evening - protected bike-lanes and MUP uphill, sharrows downhill - problem with cyclists riding down MUP. |
|||
** We can provide more input after hearing from Adolfo from CNV who will be at our November meeting to discuss. |
|||
** Poster boards and input comments at:http://www.cnv.org/city-services/streets-and-transportation/cycling/cycling-projects/west-keith-road. |
|||
** HUB-NS 2016 update to council in December - ten minutes – Heather and Tony will present. |
|||
*DWV Update |
*DWV Update |
||
**Park Royal Cycling Issues |
**Park Royal Cycling Issues |
||
*** |
*** Peter designated as HUB-NS contact person for Park Royal cycling Issues. |
||
*** in response to an offer from Rick Amantea, Peter will provide guidance on wayfinding signage at west exit from the War Dance Bridge. |
|||
*** War Dance Bridge next steps |
|||
*** Park Roya have repainted sharrows in green boxes on the bridge on the side of lanes instead of the middle - suggest painting a few more in the middle of the eastbound lane. |
|||
** Marine Drive Context Study - Open House - When: Thursday October 6 and Wednesday October 12 (Antje, 10 min) |
|||
*** We should also suggest a separate crossing for cyclists at the east exit from the bridge beside the existing crosswalk. |
|||
** Update on 25 July council meeting re: the Horseshoe Bay Streetscape Plan which could impact the proposed route on Royal Avenue (Heather J, 5 min) |
|||
*** Peter to prepare a HUB letter suggesting two options for separating cyclists from traffic crossing the Capilano River to connect the Spirit Trail on either side. |
|||
** 1000 block Keith Road incomplete (Peter, 5 min) |
|||
** Marine Drive Context Study open house - Peter attended and talked with DWV Roads Manager, Vanessa Garrett on Wednesday October 12 - needs more cycling infrastructure including separated bike lanes. |
|||
*** Antje will draft an official HUB letter. |
|||
** At the 25 July council meeting, the Horseshoe Bay Streetscape Plan was approved but the proposed two-way separated bike lane down the steep part of Royal Avenue was south of the planned area. |
|||
*** Peter to consult with Heather J with regard to cycle access to Horseshoe Bay. |
|||
** 1100 block Keith Road westbound bike lane is still incomplete so Peter will write to Vanessa Garrett. |
|||
** 15th Street Mathers to Queens - District is working on adding a separated bike-lane uphill after public consultation. |
|||
** DWV is looking to placing pavement dividing markers on Marine Drive west of the West van Yacht club but we should instead suggest green boxes with bicycle/sharrow stencils. |
|||
1. 13-Oct-2016: |
|||
A. Attendees: Peter, Fred, Fiona, Diane, Giacomo, Nelson, Erika, Antje, Don, 2 more? |
|||
B. Events: |
|||
B.I. Coho Festival – good weather, lots of attendees, 529 was in next booth. |
|||
B.II. Fall B2WW – Thursday, Oct 27th ,4-6pm |
|||
B.II.a) 3 or 4 Tents (Don & Dianne to see if we can fit 4, back further from sidewalk) |
|||
B.II.a.i) Obsession will provide a mechanic - Dianne |
|||
B.II.a.ii) Food - Cobb's Bread? – Antje |
|||
B.II.a.iii) Energy drink – same as spring? – Dianne |
|||
B.II.a.iv) Coffee - Dianne |
|||
B.II.a.v) 529 Registration – Dianne; If they can't attend, Don will check with RCMP |
|||
B.II.b) Booth staff – Erika, Giacomo, Dianne, Don, (others contact Dianne) |
|||
B.II.c) Draw – bike bag - Dianne |
|||
B.II.d) Permit – MOTI – HUB HQ/Dianne |
|||
B.III. Other B2WW stations: |
|||
B.III.a) DWV – Lions Gate, Wednesday, October 26, 4:00 - 6:00 pm |
|||
B.III.b) CNV - 1st and Mackay, Thursday, October 27, 6:30am - 9:00am |
|||
B.III.c) DNV - 2nd narrow in morning? |
|||
B.III.d) Others? Coastal health? |
|||
C. Vision Zero – protecting Cyclist & Pedestrians - Fred |
|||
C.I. BC Ministry of Public Safety – has issued a document/guidelines |
|||
C.I.a) http://www2.gov.bc.ca/assets/gov/driving-and-transportation/driving/publications/road-safety-strategy-update-vision-zero.pdf |
|||
C.II. CNV has adopted Vision Zero |
|||
C.III. NV RCMP will be enforcing laws at cross-walks on mid-Lonsdale. |
|||
D. Peter to provide number of North Shore HUB members |
|||
E. DNV |
|||
E.I. Maplewood TC workshop, Tue 18th - Nelson, Antje, Giacomo have been invited. |
|||
E.II. Council passed resolution for a Protected Bike Network (thanks to Mathew Bond) |
|||
E.II.a) We will provide our “ungap the map” evaluation as input for criterion – Antje |
|||
E.II.b) Fred, Nelson, Heather will provide input. |
|||
E.III. Tony will present a HUB 2016 Update to council - Nov 21, 7pm – 5 minutes only! |
|||
E.IV. Capilano Road: Uphill bike lane is between parked cars and traffic. Would have preferred bike lane on outside. No parking on downhill side. Both directions are unprotected. |
|||
F. CNV |
|||
F.I. Northern section of Green necklace – Heather to draft letter proposing separated bike route avoiding the MUP through the hills in park. |
|||
F.II. West Keith design – protected bike-lanes uphill, sharrows downhill |
|||
F.II.a) Adolfo from CNV will be at our November meeting to discuss. |
|||
F.II.b) http://www.cnv.org/city-services/streets-and-transportation/cycling/cycling-projects/west-keith-road |
|||
F.III. HUB 2016 update to council in December - ten minutes – Heather |
|||
G. DWV |
|||
G.I. Wardance bridge |
|||
G.I.a) Peter will be the HUB representative to Park Royal |
|||
G.I.b) PR have repainted sharrows in green boxes on the bridge |
|||
G.I.b.i) but they are on the edge instead of centre of the lane |
|||
G.I.c) Peter to work on proposal for a separate cycle/ped bridge bridge. |
|||
G.II. Marine Drive Context study – |
|||
G.II.a) Antje will draft an official HUB letter. |
|||
G.III. 15th Street: District will add a separated bike-lane uphill - when? |
|||
G.IV. WV is looking to improve Marine Drive from Yacht club to Horseshoe bay. |
|||
G.IV.a) Peter to ask Heather to draft up an official HUB letter on cycle access to HB. |
|||
G.V. 11th Ave: green paint & sharrows are only partially done – Peter to draft official letter. |
|||
529 Registration – Dianne will check and if they can't attend, Don will check with RCMP. (should be can) |
|||
2. |
|||
Booth staff – Erika, Giacomo, Dianne, Don, (others to contact Dianne) |
|||
Draw – bike bag - Dianne (should be bike tuneup from Obsessions) |
Latest revision as of 00:52, 9 December 2016
- Introductions: Peter S (chair), Peter, Fred, Fiona, Dianne, Giacomo, Nelson, Erika, Antje, Don, Heather D
- Events Planning - Review of past and planning for upcoming events
- Coho Festival - good weather, lots of traffic to our tent including WV by-election candidate Andy Krwazyck, 529 was in a nearby booth with West Van Police taking registrations.
- BTWW Fall Thursday, Oct 27th ,4-6pm at North end of IWMB where we were in the spring.
- 3 or 4 Tents (Don & Dianne to see if we can fit 4, back further from sidewalk.
- Obsession Bikes will provide a mechanic - Dianne
- Refreshments - Cobb's Bread? – Antje to arrange, Energy drink – same as spring? – Dianne to arrange as well as coffee
- 529 Registration – Dianne will check and if they can attend, Don will check with RCMP.
- Booth staff – Erika, Giacomo, Dianne, Don, (others to contact Dianne)
- Draw – bike tuneup from Obsessions - Dianne
- Permit – MOTI – HUB HQ/Dianne
- Other BTWW stations:
- DWV sponsor HUB HQ running it at the NE end of the Lions Gate Bridge, Wednesday, October 26, 4:00 - 6:00 pm.
- CNV - 1st and Mackay, Thursday, October 27, 6:30am - 9:00am
- DNV - 2nd narrow in morning?
- Others? Coastal health?
- HUB
- Vision0 30km/hr - protecting cyclists & pedestrians on residential streets.
- BC Ministry of Public Safety – has issued guidelines: http://www2.gov.bc.ca/assets/gov/driving-and-transportation/driving/publications/road-safety-strategy-update-vision-zero.pdf
- CNV has adopted Vision Zero
- NV RCMP will be enforcing laws at cross-walks on mid-Lonsdale.
- MP Gord Johns Canadian Cycling Strategy - bill has been introduced but won't be debated for some time - we individually should ask our MPs to support it.
- HUB-NS HUB membership update - Peter has the latest list and will distribute total number of members.
- Volunteers for public art cycling footage along the Spirit Trail - Heather will coordinate.
- Vision0 30km/hr - protecting cyclists & pedestrians on residential streets.
Municipalities
- DNV Update
- Maplewood TC workshop, Tue 18th - Nelson, Antje, Giacomo have been invited.
- Council passed resolution for a Protected Bike Network (thanks to Mathew Bond).
- We will provide our “ungap the map” evaluation as input for criterion but phrase it more to towards the Bike Network Master Plan - Antje
- Fred, Nelson, Heather will provide input.
- Tony will present a HUB 2016 Update to council - Nov 21, 7pm – 5 minutes only!
- Capilano Road: Uphill bike lane is between parked cars and traffic. Would have preferred bike lane on the outside. No parking on downhill side. Both directions are unprotected.
- CNV
- Northern section of Green necklace planned along 21st St. then 19th to Grand Boulevard – Heather to draft letter proposing separated bike route avoiding the MUP through the hills in park.
- West Keith design – several attended workshop earlier in the evening - protected bike-lanes and MUP uphill, sharrows downhill - problem with cyclists riding down MUP.
- We can provide more input after hearing from Adolfo from CNV who will be at our November meeting to discuss.
- Poster boards and input comments at:http://www.cnv.org/city-services/streets-and-transportation/cycling/cycling-projects/west-keith-road.
- HUB-NS 2016 update to council in December - ten minutes – Heather and Tony will present.
- DWV Update
- Park Royal Cycling Issues
- Peter designated as HUB-NS contact person for Park Royal cycling Issues.
- in response to an offer from Rick Amantea, Peter will provide guidance on wayfinding signage at west exit from the War Dance Bridge.
- Park Roya have repainted sharrows in green boxes on the bridge on the side of lanes instead of the middle - suggest painting a few more in the middle of the eastbound lane.
- We should also suggest a separate crossing for cyclists at the east exit from the bridge beside the existing crosswalk.
- Peter to prepare a HUB letter suggesting two options for separating cyclists from traffic crossing the Capilano River to connect the Spirit Trail on either side.
- Marine Drive Context Study open house - Peter attended and talked with DWV Roads Manager, Vanessa Garrett on Wednesday October 12 - needs more cycling infrastructure including separated bike lanes.
- Antje will draft an official HUB letter.
- At the 25 July council meeting, the Horseshoe Bay Streetscape Plan was approved but the proposed two-way separated bike lane down the steep part of Royal Avenue was south of the planned area.
- Peter to consult with Heather J with regard to cycle access to Horseshoe Bay.
- 1100 block Keith Road westbound bike lane is still incomplete so Peter will write to Vanessa Garrett.
- 15th Street Mathers to Queens - District is working on adding a separated bike-lane uphill after public consultation.
- DWV is looking to placing pavement dividing markers on Marine Drive west of the West van Yacht club but we should instead suggest green boxes with bicycle/sharrow stencils.
- Park Royal Cycling Issues
529 Registration – Dianne will check and if they can't attend, Don will check with RCMP. (should be can)
Booth staff – Erika, Giacomo, Dianne, Don, (others to contact Dianne)
Draw – bike bag - Dianne (should be bike tuneup from Obsessions)