Meeting Summary: July 9, 2015: Difference between revisions
Jump to navigation
Jump to search
imported>Peter Scholefield No edit summary |
imported>Peter Scholefield No edit summary |
||
Line 5: | Line 5: | ||
#* will consider a contribution after finding our more info - Peter will check with Amanada |
#* will consider a contribution after finding our more info - Peter will check with Amanada |
||
# Mountain Highway exchange update (Devan 15 min) |
# Mountain Highway exchange update (Devan 15 min) |
||
#* Devan and Antje who worked on a HUB letter were not preset to discuss this item m- Heather will circulate the draft HUB response letter to MoT for comment |
|||
letter to MoT for comment |
|||
# Car Free day August 22 (Heather 5 min) |
# Car Free day August 22 (Heather 5 min) |
||
#* on Lonsdale |
#* on Lonsdale |
||
Line 19: | Line 18: | ||
# HUB-NS outreach package (Dennis 10 min) |
# HUB-NS outreach package (Dennis 10 min) |
||
#* deferred to next meeting |
#* deferred to next meeting |
||
# West Keith Road, North Van Open House |
# West Keith Road/13th Street, North Van Open House |
||
#* Rob and Heather attended the open house held on 24 June |
|||
#* A lengthy discussion ensued looking at the various options for pedestrians and cyclists on the web site(http://www.cnv.org/~/media/C63F9745879945FFB6204465B7EF4B9D.PDF)as well as paper copies |
|||
#* There was overall agreement that there should be AAA facilities for cyclists in both the east and west directions. |
|||
#* The option that came closest to this for the section from Marine Drive to Jones was Concept B1 - it was suggested however the configuation going west on the north side should be the same as on the south side. |
|||
#* The option that came closest to this for the section from Mahon Ave. to chesterfield Ave. was Concept |
|||
# West Van cycling infrastructure update |
# West Van cycling infrastructure update |
||
#* Spirit Trail |
#* Spirit Trail |
Revision as of 21:44, 15 July 2015
- Attendance: Peter, Dianne, Devan, Nelson, Don M., Rob, Erika, Fiona, Amanda, Don P.
- Agenda approval/changes additions
- Minutes Review (Peter 2 min)
- North Shore Safe Routes Advocates (NSSRA) request for HUB funding (10 min)
- will consider a contribution after finding our more info - Peter will check with Amanada
- Mountain Highway exchange update (Devan 15 min)
- Devan and Antje who worked on a HUB letter were not preset to discuss this item m- Heather will circulate the draft HUB response letter to MoT for comment
- Car Free day August 22 (Heather 5 min)
- on Lonsdale
- lead a ride over back and forth over IWMB from points in Vancouver
- we will set up a booth
- we need to check with Colin about insurance
- Dianne has the box of materials - get more supplies from HUB HQ
- could survey people at booth about favourite routes or problems
- laminate a enlarged version of the NS bike map - get pdf version of the map from the city of NV (from their website and get them to print it.
- Don will coordinate with the city
- HUB-NS outreach package (Dennis 10 min)
- deferred to next meeting
- West Keith Road/13th Street, North Van Open House
- Rob and Heather attended the open house held on 24 June
- A lengthy discussion ensued looking at the various options for pedestrians and cyclists on the web site(http://www.cnv.org/~/media/C63F9745879945FFB6204465B7EF4B9D.PDF)as well as paper copies
- There was overall agreement that there should be AAA facilities for cyclists in both the east and west directions.
- The option that came closest to this for the section from Marine Drive to Jones was Concept B1 - it was suggested however the configuation going west on the north side should be the same as on the south side.
- The option that came closest to this for the section from Mahon Ave. to chesterfield Ave. was Concept
- West Van cycling infrastructure update
- Spirit Trail
- Eagleridge Community Centre, west side of Marine Drive past Eagleridge school to Exit 0 by the end of August.
- improvement to Orchill Road section as well.
- Consultant to propose a route from Exit 0, to top of Royal Avenue then to Horseshoe Bay followed by public consultation in September.
- Plan being developed to extend Spirit Trail in Ambleside from 13th to 19th along Argyle - part of a waterfront plan to go to Council.
- meeting later this month with Park Royal to see what their plans are for the Wardance Bridge.
- Looking for possibilities to install sections of the Spirit Trail near or on Marine Drive between 25th St and Cranley Drive.
- North end of the Lions Gate Bridge
- Wayfinding signage still in planning and negotiating stage - could be installed in 3-4 weeks.
- Trees have been cleared in a section of walkway on the south side of Marine Drive between Taylor Way and the Capilano Pacific Trail - could be improved for cyclists.
- North side of highway 1 from Capilano River Bridge to 3rd Street may be done at the end of this fiscal year if funds are available if not, then in 2016.
- Grosvenor Ambleside 1300 block redevelopment - no cycling facilities shown on Grosvenor website (http://grosvenorambleside.com/homes/architecture)despite surrounded by designated bike routes.
- 1100 block Keith Road - sidewalk to be installed on south side this summer - may paint a bike lane on the north side if there is enough room.
- John Calimente would like names and contact info of cyclists in West Van who may wish to comment on cycling infrastructure plans.
- Spirit Trail
- Ironworkers Memorial Bridge - suggested improvements to exit onto Dollarton (10 min)
- Possible response to Transportation Plebiscite results (Peter 10 min)
- Plans for a group assessment ride along the Spirit Trail (Peter 10 min)
- Upcoming events including HUB picnic on 12 July (10 min)