Meeting Summary: December 2, 2010: Difference between revisions

From committees
Jump to navigation Jump to search
imported>Antje Wahl
No edit summary
imported>Antje Wahl
No edit summary
Line 7: Line 7:
'''Education & Outreach'''
'''Education & Outreach'''
* Recap of VACC tabling at VIMFF Speaker Series at Centennial Theatre (Heather/Bill/Antje)
* Recap of VACC tabling at VIMFF Speaker Series at Centennial Theatre (Heather/Bill/Antje)
** Many cyclists on Tues, less so on Wed and Thu, but good shows on all nights
** Many cyclists on Tues, less so on Wed and Thu, but good shows all nights
** Most popular items from the table: cyclists are sexy sticker, Metro Vancouver bike map, Momentum magazine
** Most popular items from the table: cyclists are sexy sticker, Metro Vancouver bike map, Momentum magazine
* North Vancouver Bicycle Master Plan review (John/Antje/Bill)
* North Vancouver Bicycle Master Plan review (John/Antje/Bill)
** Antje summarized Dec 1 JBAC special meeting on master plan review. Lots of good input for master plan update.
** Antje summarized Dec 1 JBAC special meeting on master plan review. Lots of good input for master plan update.
** John summarized shortcomings of current master plan.
** John summarized shortcomings of current master plan and how VACC can provide input for the review
** Municipalities will prepare to start master plan review next year (February or March).
** Municipalities will start master plan review next year (February or March)
* FAQ NS cyclist resource (John)
* FAQ NS cyclist resource (John)
** John added lots of contacts on Google spreadsheet (see his email to Yahoo group for login).
** John added lots of contacts on Google spreadsheet (see his email to Yahoo group for login)
** Enough information now to post on the wiki.
** Enough information now to post on the wiki
* Additional useful links for wiki site (Peter & Heather):
* Additional useful links for wiki site (Peter & Heather):
** Motor Vehicle Act rules for cycles (http://www.bclaws.ca/EPLibraries/bclaws_new/document/ID/freeside/96318_05#section183)
** Motor Vehicle Act rules for cycles (http://www.bclaws.ca/EPLibraries/bclaws_new/document/ID/freeside/96318_05#section183)
Line 25: Line 25:
* Lions Gate Bridge (Peter)
* Lions Gate Bridge (Peter)
** New contact is Matt Choquette
** New contact is Matt Choquette
** Online map with cycling facilities still not updated, but everything discussed at Sep meeting will be built
** Online map with cycling facilities still not updated, but everything discussed at September on-site meeting is being built
** On Marine Drive we will lose westbound bike lane and eastbound wide paved shoulder
** Project to be finished by end of March
** Project to be finished by end of March
* Iron Workers Memorial Second Narrows Bridge (John)
* Iron Workers Memorial Second Narrows Bridge (John)
** John summarized meeting with Burnaby and Vancouver VACC committees. Lorraine moderated meeting.
** John summarized 2nd meeting, this time with Richard and Lorraine
** John spoke with MoT about 2nd Narrows. Will focus on short-term improvements, such as rub rail on both sides of bridge sidewalk (such as on rusty bridge across Lynn Creek)
** Richard continues to advocate for funding for major improvements such as new or wider bridge while John will pursue short-term improvements to existing bridge infrastructure
** John spoke with MoT about 2nd Narrows. Suggestions included cyclist-friendly rub rail on bridge sidewalks.
* SeaBus bike facilities (Tamiko)
* SeaBus bike facilities (Tamiko)
** Tamiko spoke with Gavin and Translink contact about improving bike access and parking on SeaBus.
** Tamiko spoke with Gavin and new Translink contact about improving bike access and parking on SeaBus
** Positive conversation: discussed removing seats to increase cyclist and pedestrian capacity, loading through centre doors
* Hierarchy of cycle route constructs and markings (Peter)
* Hierarchy of cycle route constructs and markings (Peter)
** Peter shared prioritized list (on wiki)
** Peter shared prioritized list (on wiki)
* Welsh Street (Bart)
* Welsh Street (Bart, by email)
** WVD Engineering met with Squamish Nation ("SN") Council in November. Based on SN's direction a meeting with the public is to be scheduled for January next year followed by a presentation of the final design to SN Council in February. Note, no open house was schedule for late November.
** Bart sent email that open house with Squamish Nation will happen in the new year
* West Vancouver budget for cycling network and greenway plan (Bart, by email)
** The budget to update the Cycling Network and Greenway Plan for WVD is before Council.
** WVD Engineering is looking at a possible new project of the creation of bicycle lanes on Marine Drive between 25th Street and Oxley Street as a project for 2011. If this could be accomplished it would be a very symbolic advancement of biking in WVD.


'''Social'''
'''Social'''

Revision as of 16:21, 3 December 2010

Attendance & Agenda

  • Welcome new members and guests
  • Attendance: Peter, Bill, Antje, Jen, Dianne, Tamiko, John
  • Additional business: none
  • Review November minutes

Education & Outreach

Hot Spots & Issues

  • Lions Gate Bridge (Peter)
    • New contact is Matt Choquette
    • Online map with cycling facilities still not updated, but everything discussed at September on-site meeting is being built
    • On Marine Drive we will lose westbound bike lane and eastbound wide paved shoulder
    • Project to be finished by end of March
  • Iron Workers Memorial Second Narrows Bridge (John)
    • John summarized 2nd meeting, this time with Richard and Lorraine
    • Richard continues to advocate for funding for major improvements such as new or wider bridge while John will pursue short-term improvements to existing bridge infrastructure
    • John spoke with MoT about 2nd Narrows. Suggestions included cyclist-friendly rub rail on bridge sidewalks.
  • SeaBus bike facilities (Tamiko)
    • Tamiko spoke with Gavin and new Translink contact about improving bike access and parking on SeaBus
    • Positive conversation: discussed removing seats to increase cyclist and pedestrian capacity, loading through centre doors
  • Hierarchy of cycle route constructs and markings (Peter)
    • Peter shared prioritized list (on wiki)
  • Welsh Street (Bart, by email)
    • WVD Engineering met with Squamish Nation ("SN") Council in November. Based on SN's direction a meeting with the public is to be scheduled for January next year followed by a presentation of the final design to SN Council in February. Note, no open house was schedule for late November.
  • West Vancouver budget for cycling network and greenway plan (Bart, by email)
    • The budget to update the Cycling Network and Greenway Plan for WVD is before Council.
    • WVD Engineering is looking at a possible new project of the creation of bicycle lanes on Marine Drive between 25th Street and Oxley Street as a project for 2011. If this could be accomplished it would be a very symbolic advancement of biking in WVD.

Social

  • Festive season gathering at Cedar Grove Restaurant, Lynn Valley (John)
    • Brunch on 12 Dec

Action Items

  • Peter to follow up on Taylor Wood issues
  • Tamiko to follow up with Translink
  • Jay to email Cllr Bassam to initiate dialogue on future advocacy efforts in District
  • Jay to follow up with City and District regarding signs and driver education about green sharrow lanes
  • Group to follow progress at JBAC and District TPAC