Meeting Summary: September 2, 2010: Difference between revisions

From committees
Jump to navigation Jump to search
imported>Antje Wahl
No edit summary
imported>John Dove
 
(15 intermediate revisions by 2 users not shown)
Line 1: Line 1:
* Attendance: Peter (chairing), John, Antje, Richard, Dianne, Fiona
Attendance: Peter (chairing), John, Antje, Richard, Dianne, Fiona
=== Highlights ===
* Lions Gate Bridge bike route plans (Peter)
# '''Lions Gate Bridge (LGB) bike route plans''' (Peter)
** Peter sent list of concerns to MoT project manager and received reply, forwarded to email list
#* Peter sent a list of concerns to MoT project manager and received replies, forwarded them to Yahoo email list
** Issue 1: westbound shared bike/car/transit lanes on Marine Dr, eliminating existing bike lane; we want to retain bike lane
** Issue 2: multi-use path going west from Capilano Bridge narrows too much; need ramp down to 6th St
#* Issue 1: shared bike/transit lanes on Marine Dr westbound from Capilano Road, eliminating existing bike lane; '''we want to retain bike lane'''
#* Issue 2: multi-use path going west from Capilano Bridge to Taylor Way narrows too much; '''we want a wheelchair accessible ramp down to 6th St'''
** Issue 3: eastbound shared bike/car/transit lane on Marine Dr., worse than current wide paved shoulder; want bike lane
#* Issue 3: shared bike/car/transit lane eastbound on Marine Dr.to Capilan Road, worse than current wide paved shoulder; '''we want bike lane'''
** Issue 4: southbound access to Lions Gate bridge, gap between Capilano Bridge and Lions Gate Bridge; need designated
** Issue 5: ramp connection to Lions Gate (west access) is one way; need two-way designation
#* Issue 4: southbound access to Lions Gate bridge, looks like there is a gap between Capilano Bridge and Lions Gate Bridge; '''we need a designated multi-use path'''
** Issue 6: remove sign at east bound exit path that indicates two-way cycle traffic is possible; ask for sign saying one-way cycling
#* Issue 5: ramp connection to Lions Gate (west access) is one way; '''we need two-way designation'''
#* Issue 6: remove sign at east bound exit path that indicates two-way cycle traffic is possible; '''we want sign allowing only one-way cycling'''
** Issue 7: cycling on cloverleaf and cross West Van lanes to get to south bound path; we drop this
#* Issue 7: cycling on cloverleaf and cross West Van car lanes to get to south bound path; '''we decided to drop this issue'''
** Issue 8: water pooling on multi-use path under Lions Gate Bridge (east, on Squamish land)
#* Issue 8: water pooling on multi-use path under Lions Gate Bridge (east, on Squamish land); '''we want this fixed'''
** Issue 9: more signage for way-finding
#* Issue 9: '''we want more signage for way-finding'''
** Action: Peter to set up meeting with MoT on site, invite DWV and DNV transportation planners (Brent Dozzi, Jeremy Rennie)
#* The meeting was pleased with plans to improve lighting on the multi-use pathway for southbound access to the LGB, improvement to the northbound exit and investigating drainage issues at the southern end.
* North Vancouver JBAC meeting recap (Antje)
#* Action: Peter to set up meeting with MoT on site, invite DWV and DNV transportation planners (Brent Dozzi, Jeremy Rennie)
** Antje and Fiona attended Sep 1 JBAC meeting
#* Action: Peter to to find out more about the proposed shared bike/transit lanes on Marine Dr: will they be only transit, no cars at any time? The lanes are labelled shared bike/car lane on MoT map.
** Action: review North Van bike master plan, Antje to set up meeting
# '''North Vancouver JBAC meeting recap''' (Antje)
** Action: Antje/Jay to write letter requesting participation on JBAC, non-voting
#* Antje and Fiona attended Sep 1 JBAC meeting and summarized planned and current cycling improvements in CNV and DNV
* Capilano University access (Antje)
#** CNV Marine Drive between Bewicke and Mackay will have bike lanes
** Action: Antje to read report, draft comments or positive response and send to email list, then send to DNV, JBAC
#** 3rd Street Hill between Kennard and Queensbury will get bike lanes
* SeaBus facilities for bikes (Tamiko)
#** Mackay/Hamilton bike lanes, shared lane and elephant feet crosswalk, new signal at Mackay/1st Street
** Tamiko sent email to Translink, no response yet
#** 1st Street bike lanes with painted buffer to car lanes, between Mackay and Garden
* Second Narrows bridge (John)
#** Widening of bike lanes on Mt Seymour Parkway (completed)
** park issue of one-way vs. two-way travel for now, look at short-term issues first: path maintenance, signage, paint to better designate bike routes
#** Extension of bike lanes on Mt Seymour Road to Indian River Road
** Action: John to develop plan for signage etc., send to email list for review, and communicate with Vancouver and Burnaby VACC committees
#** Capilano Road bike lanes will be painted bright green where cars cross bike lane
** signage at north end of IWMB for nearby local destinations and attractions e.g. Main Street, Seymour Parkway, Dollarton Highway, CapU, Deep Cove, Lynn Canyon, Park & Tilford shopping etc
#** DNV Marine Drive shared lanes, parking removed (completed); will add more signage
** signage at north end of IWMB to nearby designated bike routes such as Mtn Hwy + ?
#** Chesterfield uphill bike lane between Esplanade and 4th Street
** signage along cycling routes
#** Green sharrow lane on 13th Street westbound between Lonsdale and Chesterfield
** street pavement painting where required (routes along Highway 1)
# '''North Vancouver Bicycle Master Plan review''' (Antje)
** crossing pavement painting such as elephant feet (Main St & ??) intersection to east of north end of IWMB)
#* JBAC will have a workshop on Dec 1 for the review
** crossing signal request buttons at suitable locations for cyclists (various in tandem with other local crossings)
#* VACC should do our own review of the current plan and submit comments to JBAC
** sidewalk & shared pathway maintenance including foliage clearing & proper let-ins
#* Action: Antje to set up meeting for a VACC group to review current master plan
** other low budget items that arise
# '''VACC representation on JBAC''' (Antje)
** liaison with other parties
#* It was discussed at the Sep 1 JBAC meeting to formalize VACC communication/representation on JBAC, but no decision was taken and the matter will likely make it to the next JBAC meeting in November
* VACC letter to North Shore Councils on funding from province, costs/benefits of cycling infrastructure (Antje)
#* non-voting seat on JBAC would be good so we can participate in meeting (not just observe) and receive reports from CNV and DNV
** Action: Antje to draft letter
#* no designated person as the VACC committee would like to send person best informed/qualified for the issues on the JBAC agenda
* Wiki improvements/updates (John)
#* Action: Jay to write letter to JBAC explaining our position
** Action: John to set up with North Shore contact details for various issues regarding cycling
# '''Capilano University access''' (Antje)
* Keith Road Greenway Public Workshop
#* DNV/Capilano University will build multi-use paved path up the east side of Lillooet Rd to Lillooet Place, from there path follows current gravel path up to the sportsplex
** Saturday, September 11, 9:30am-noon
#* path will be asphalt, two-way with line in the middle
** Action: Fiona to send out notice to email list about meeting, will attend meeting
#* they are also planning to faciliate crossing of Lillooet Rd at the intersection with Old Lillooet Rd
* Next group ride: Sep 9 at 6pm, Peter will lead a ride at north end of Lions Gate Bridge, meeting point: White Spot parking lot
#* DNV doesn't want to put in crosswalk across Lillooet Rd by Lillooet Place because of short distance to signals at Old Lillooet Rd
* Next meeting: Thursday October 7 at 6pm
#* Action: Antje to draft comments/positive response on plan and get feedback from Yahoo email list; then send them to DNV, JBAC
# '''SeaBus facilities for bikes''' (Tamiko)
#* Tamiko sent email to Translink, no response yet
#* Action: Tamiko to follow up if no response soon
# '''Second Narrows bridge''' (John)
#* park issue of one-way vs. two-way travel for now, look at short-term issues first: path maintenance, signage, paint to better designate bike routes
#* signage at north end of IWMB for nearby local destinations and attractions e.g. Main Street, Seymour Parkway, Dollarton Highway, CapU, Deep Cove, Lynn Canyon, Park & Tilford shopping etc
#* signage at north end of IWMB to nearby designated bike routes such as Mtn Hwy
#* signage along cycling routes
#* street pavement painting where required (routes along Highway 1)
#* crossing pavement painting such as elephant feet (Main St & ??) intersection to east of north end of IWMB)
#* crossing signal request buttons at suitable locations for cyclists (various in tandem with other local crossings)
#* sidewalk & shared pathway maintenance including foliage clearing & proper let-ins
#* other low budget items that arise
#* liaison with other parties
#* Action: John to develop plan for signage etc., send to Yahoo email list for review
#* Action: John to communicate with Vancouver and Burnaby VACC committees
# '''VACC letter to North Shore Mayors & Councils on funding from province, costs/benefits of cycling infrastructure''' (Antje)
#* Action: Antje to draft letter
# '''Wiki improvements/updates''' (John)
#* Action: John to find out North Shore contact details ("cycling hotline") and set up page on wiki
# '''Keith Road Greenway''' (Fiona)
#* Public Workshop on Saturday, September 11, 9:30am-noon
#* Action: Fiona to send out notice to Yahoo email list about meeting
#* Action: Fiona to attend meeting
# '''Next group ride:''' Sep 9 at 6pm, Peter will lead a ride at North Shore end of Lions Gate Bridge, meeting point: eastern end of the Spirit Trail in Park Royal South
#* Action: Peter to send out notice to Yahoo email list
# '''Next meeting:''' Thursday October 7 at 6pm

=== Summary of Action Items ===
* Peter to set up meeting with MoT on site at Lions Gate Bridge, invite DWV and DNV transportation planners (Brent Dozzi, Jeremy Rennie)
*Peter to to find out more about the proposed shared bike/transit lanes on Marine Dr: will they be only transit, no cars at any time? The lanes are labelled shared bike/car lane on MoT map.
* Antje to set up meeting for a VACC group to review current North Vancouver Bicycle Master Plan
* Jay to write letter to JBAC explaining our position regarding VACC representation on JBAC
* Antje to draft comments/positive response on Capilano U access plan and get feedback from Yahoo email list; then send them to DNV, JBAC
* Tamiko to follow up on SeaBus facilities for bikes if no response from Translink soon
* John to develop plan for signage and other improvements at North Van end of Second Narrows bridge, send to Yahoo email list for review
* John to communicate with Vancouver and Burnaby VACC committees regarding Second Narrows bridge
* Antje to draft letter to North Shore Mayors & Councils on funding for cycling infrastructure
* John to find out North Shore contact details ("cycling hotline") and set up page on wiki
* Fiona to send out notice to Yahoo email list about Keith Road Greenway meeting
* Fiona to attend Keith Road Greenway meeting
* Peter to send out notice to Yahoo email list about September Group Ride

Latest revision as of 05:15, 6 October 2010

Attendance: Peter (chairing), John, Antje, Richard, Dianne, Fiona

Highlights

  1. Lions Gate Bridge (LGB) bike route plans (Peter)
    • Peter sent a list of concerns to MoT project manager and received replies, forwarded them to Yahoo email list
    • Issue 1: shared bike/transit lanes on Marine Dr westbound from Capilano Road, eliminating existing bike lane; we want to retain bike lane
    • Issue 2: multi-use path going west from Capilano Bridge to Taylor Way narrows too much; we want a wheelchair accessible ramp down to 6th St
    • Issue 3: shared bike/car/transit lane eastbound on Marine Dr.to Capilan Road, worse than current wide paved shoulder; we want bike lane
    • Issue 4: southbound access to Lions Gate bridge, looks like there is a gap between Capilano Bridge and Lions Gate Bridge; we need a designated multi-use path
    • Issue 5: ramp connection to Lions Gate (west access) is one way; we need two-way designation
    • Issue 6: remove sign at east bound exit path that indicates two-way cycle traffic is possible; we want sign allowing only one-way cycling
    • Issue 7: cycling on cloverleaf and cross West Van car lanes to get to south bound path; we decided to drop this issue
    • Issue 8: water pooling on multi-use path under Lions Gate Bridge (east, on Squamish land); we want this fixed
    • Issue 9: we want more signage for way-finding
    • The meeting was pleased with plans to improve lighting on the multi-use pathway for southbound access to the LGB, improvement to the northbound exit and investigating drainage issues at the southern end.
    • Action: Peter to set up meeting with MoT on site, invite DWV and DNV transportation planners (Brent Dozzi, Jeremy Rennie)
    • Action: Peter to to find out more about the proposed shared bike/transit lanes on Marine Dr: will they be only transit, no cars at any time? The lanes are labelled shared bike/car lane on MoT map.
  2. North Vancouver JBAC meeting recap (Antje)
    • Antje and Fiona attended Sep 1 JBAC meeting and summarized planned and current cycling improvements in CNV and DNV
      • CNV Marine Drive between Bewicke and Mackay will have bike lanes
      • 3rd Street Hill between Kennard and Queensbury will get bike lanes
      • Mackay/Hamilton bike lanes, shared lane and elephant feet crosswalk, new signal at Mackay/1st Street
      • 1st Street bike lanes with painted buffer to car lanes, between Mackay and Garden
      • Widening of bike lanes on Mt Seymour Parkway (completed)
      • Extension of bike lanes on Mt Seymour Road to Indian River Road
      • Capilano Road bike lanes will be painted bright green where cars cross bike lane
      • DNV Marine Drive shared lanes, parking removed (completed); will add more signage
      • Chesterfield uphill bike lane between Esplanade and 4th Street
      • Green sharrow lane on 13th Street westbound between Lonsdale and Chesterfield
  3. North Vancouver Bicycle Master Plan review (Antje)
    • JBAC will have a workshop on Dec 1 for the review
    • VACC should do our own review of the current plan and submit comments to JBAC
    • Action: Antje to set up meeting for a VACC group to review current master plan
  4. VACC representation on JBAC (Antje)
    • It was discussed at the Sep 1 JBAC meeting to formalize VACC communication/representation on JBAC, but no decision was taken and the matter will likely make it to the next JBAC meeting in November
    • non-voting seat on JBAC would be good so we can participate in meeting (not just observe) and receive reports from CNV and DNV
    • no designated person as the VACC committee would like to send person best informed/qualified for the issues on the JBAC agenda
    • Action: Jay to write letter to JBAC explaining our position
  5. Capilano University access (Antje)
    • DNV/Capilano University will build multi-use paved path up the east side of Lillooet Rd to Lillooet Place, from there path follows current gravel path up to the sportsplex
    • path will be asphalt, two-way with line in the middle
    • they are also planning to faciliate crossing of Lillooet Rd at the intersection with Old Lillooet Rd
    • DNV doesn't want to put in crosswalk across Lillooet Rd by Lillooet Place because of short distance to signals at Old Lillooet Rd
    • Action: Antje to draft comments/positive response on plan and get feedback from Yahoo email list; then send them to DNV, JBAC
  6. SeaBus facilities for bikes (Tamiko)
    • Tamiko sent email to Translink, no response yet
    • Action: Tamiko to follow up if no response soon
  7. Second Narrows bridge (John)
    • park issue of one-way vs. two-way travel for now, look at short-term issues first: path maintenance, signage, paint to better designate bike routes
    • signage at north end of IWMB for nearby local destinations and attractions e.g. Main Street, Seymour Parkway, Dollarton Highway, CapU, Deep Cove, Lynn Canyon, Park & Tilford shopping etc
    • signage at north end of IWMB to nearby designated bike routes such as Mtn Hwy
    • signage along cycling routes
    • street pavement painting where required (routes along Highway 1)
    • crossing pavement painting such as elephant feet (Main St & ??) intersection to east of north end of IWMB)
    • crossing signal request buttons at suitable locations for cyclists (various in tandem with other local crossings)
    • sidewalk & shared pathway maintenance including foliage clearing & proper let-ins
    • other low budget items that arise
    • liaison with other parties
    • Action: John to develop plan for signage etc., send to Yahoo email list for review
    • Action: John to communicate with Vancouver and Burnaby VACC committees
  8. VACC letter to North Shore Mayors & Councils on funding from province, costs/benefits of cycling infrastructure (Antje)
    • Action: Antje to draft letter
  9. Wiki improvements/updates (John)
    • Action: John to find out North Shore contact details ("cycling hotline") and set up page on wiki
  10. Keith Road Greenway (Fiona)
    • Public Workshop on Saturday, September 11, 9:30am-noon
    • Action: Fiona to send out notice to Yahoo email list about meeting
    • Action: Fiona to attend meeting
  11. Next group ride: Sep 9 at 6pm, Peter will lead a ride at North Shore end of Lions Gate Bridge, meeting point: eastern end of the Spirit Trail in Park Royal South
    • Action: Peter to send out notice to Yahoo email list
  12. Next meeting: Thursday October 7 at 6pm

Summary of Action Items

  • Peter to set up meeting with MoT on site at Lions Gate Bridge, invite DWV and DNV transportation planners (Brent Dozzi, Jeremy Rennie)
  • Peter to to find out more about the proposed shared bike/transit lanes on Marine Dr: will they be only transit, no cars at any time? The lanes are labelled shared bike/car lane on MoT map.
  • Antje to set up meeting for a VACC group to review current North Vancouver Bicycle Master Plan
  • Jay to write letter to JBAC explaining our position regarding VACC representation on JBAC
  • Antje to draft comments/positive response on Capilano U access plan and get feedback from Yahoo email list; then send them to DNV, JBAC
  • Tamiko to follow up on SeaBus facilities for bikes if no response from Translink soon
  • John to develop plan for signage and other improvements at North Van end of Second Narrows bridge, send to Yahoo email list for review
  • John to communicate with Vancouver and Burnaby VACC committees regarding Second Narrows bridge
  • Antje to draft letter to North Shore Mayors & Councils on funding for cycling infrastructure
  • John to find out North Shore contact details ("cycling hotline") and set up page on wiki
  • Fiona to send out notice to Yahoo email list about Keith Road Greenway meeting
  • Fiona to attend Keith Road Greenway meeting
  • Peter to send out notice to Yahoo email list about September Group Ride