HUB Tri-Cities Assessment Ride Reports: Difference between revisions

From committees
Jump to navigation Jump to search
No edit summary
No edit summary
Line 5: Line 5:
'''Lougheed Highway'''
'''Lougheed Highway'''


'''Lougheed Highway 7-Jan-2014'''
'''Lougheed Highway 7-Jan-2014:'''


Ride covered portion of new PMH1 infrastructure between Colony farm road and ended up at intersection of Brunette and Lougheed (both directions).
Ride covered portion of new PMH1 infrastructure between Colony farm road and ended up at intersection of Brunette and Lougheed (both directions).

Revision as of 03:04, 13 February 2014

2013 Assessment Rides

David Avenue bike lanes

Lougheed Highway

Lougheed Highway 7-Jan-2014:

Ride covered portion of new PMH1 infrastructure between Colony farm road and ended up at intersection of Brunette and Lougheed (both directions).

Main findings:

-several substandard sections of new bike lanes on Lougheed (PMH1 responsibility) More details to follow.

-very dangerous situation at Lougheed and Brunette where bike lane suddenly ends without warning and resumes a block down the road. Coquitlam responsibility.

Video here: http://www.youtube.com/watch?v=nGXd3AuOclc