HUB Tri-Cities Assessment Ride Reports: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 10: | Line 10: | ||
Main findings: |
Main findings: |
||
-several substandard sections of new bike lanes on Lougheed (PMH1 responsibility) More details to follow. |
-several substandard sections of new bike lanes on Lougheed (PMH1 responsibility) More details to follow. |
||
-very dangerous situation at Lougheed and Brunette where bike lane suddenly ends without warning and resumes a block |
-very dangerous situation at Lougheed and Brunette where bike lane suddenly ends without warning and resumes a block down the road. |
||
Video here: http://www.youtube.com/watch?v=nGXd3AuOclc |
Video here: http://www.youtube.com/watch?v=nGXd3AuOclc |
Revision as of 01:44, 20 January 2014
2013 Assessment Rides
David Avenue bike lanes
Lougheed Highway
Lougheed Highway 7-Jan-2014
Ride covered portion of new PMH1 infrastructure between Colony farm road and ended up at intersection of Brunette and Lougheed (both directions).
Main findings:
-several substandard sections of new bike lanes on Lougheed (PMH1 responsibility) More details to follow.
-very dangerous situation at Lougheed and Brunette where bike lane suddenly ends without warning and resumes a block down the road.
Video here: http://www.youtube.com/watch?v=nGXd3AuOclc