Spirit Trail 2023: Difference between revisions
Ruebenschulz (talk | contribs) (→Spirit Trail Photo Project: Add section B) |
Ruebenschulz (talk | contribs) (→Spirit Trail Photo Project: Added section C.) |
||
Line 66: | Line 66: | ||
<td>[[File:B3 IMG 5485.jpg|thumb|left|Three kids biking along the Spirit Trail in Moodyville Park. There are trees (mostly bigleaf maple and some alder) on either side of the trail.]] |
<td>[[File:B3 IMG 5485.jpg|thumb|left|Three kids biking along the Spirit Trail in Moodyville Park. There are trees (mostly bigleaf maple and some alder) on either side of the trail.]] |
||
<td>[[File:B4 IMG 5491.jpg|thumb|none|A cyclist coming down the windy hill near the Moodyville Park playground. This is near Moody Ave and 2nd Street.]] |
<td>[[File:B4 IMG 5491.jpg|thumb|none|A cyclist coming down the windy hill near the Moodyville Park playground. This is near Moody Ave and 2nd Street.]] |
||
</tr> |
|||
</table> |
|||
==2nd Street to St Georges== |
|||
Section C. This portion of the #SpiritTrail is mostly on side streets between Moodyville Park and St David's Ave and there are a few different routes you can take, including a suspension bridge that is only suitable for walking. West of St Davids Ave it is the standard separated MUP. |
|||
Travelling through this area you can hear the hum of the granaries and the noise of new condos being built. A few solitary houses remain from the old Moodyville neighbourhood. |
|||
Between St Patricks and St Georges Avenues the trail passes six brew pubs in the Brewery District. |
|||
<table> |
|||
<tr> |
|||
<td>[[File:C1 IMG 5492.jpg|thumb|Two people biking eastward where 1st and 2nd Streets meet. Here the Spirit Trail is located on the road and is not a proper separated MUP. In the background is a granary and beside the cyclists is a temporary community garden (which will eventually be replaced with condos).]] |
|||
<td>[[File:C2 IMG 5493.jpg|thumb|A short connecting path between 1st Street and Alder Street. This section has some switchback corners, but a desire line indicates most people just prefer to go straight up and down the little hill.]] |
|||
</tr> |
|||
<tr> |
|||
<td>[[File:C3 IMG 5497.jpg|thumb|Two people biking along Alder Street. A granary is in the background on the left side. Most houses along Alder Street were demolished for a future redevelopment. ]] |
|||
<td>[[File:C4 IMG 5508.jpg|thumb|Two young people on electric scooters near the St Patricks Ave section of the trail. This section is a separated MUP. Some housing towers from Esplanade Street are in the far background and farther in the background is Black Mountain (Cypress Bowl) in West Vancouver.]] |
|||
</tr> |
|||
<tr> |
|||
<td>[[File:C5 IMG 5513.jpg|thumb|People starting to cross Esplanade Street at St Andrews Ave. There are a mix of cyclists and walkers. Some of the brew pubs are on the right on the east end of Esplanade Street.]] |
|||
<td>[[File:C6 IMG 5519.jpg|thumb|The Spirit Trail MUP along Esplanade Street between St Andrews and St Georges Avenues. Housing towers from Esplanade and the Shipyard are in the background. A separated eastbound bike lane along Esplanade Street, that connects to the Low Road, is parallel to the MUP on this block.]] |
|||
</tr> |
</tr> |
||
</table> |
</table> |
Revision as of 05:46, 3 March 2024
Spirit Trail Photo Project
Introduction
In September 2023, I did a photo documentary of the North Vancouver Spirit Trail.
North Shore bike infrastructure still has a long way to go before catching up with the Netherlands (or even Downtown Vancouver), but I want to highlight some of the infrastructure we have.
The trail is a multi-use path (MUP) that eventually? will connect Deep Cove to Horseshoe Bay. Currently the trail is mostly complete in the City and parts of District of NorthVan.
Leaving aside issues with MUPs (not so good for fast cycling, mixing people traveling at different speeds, etc), the trail provides a safe, connected, east/west route through the lower North Shore from Park and Tilford Mall to Ambleside Park. I know one person who will only bike on a fully protected lane like the Spirit Trail, and often see parents biking with their kids along it, often transporting them on cargo bikes.
I broke the trail into 11 sections (A to K). Photos are from September 2023 and organized travelling from east to west.
For some more info about the trail see:
Rona to Bridge over 3rd Street
Section A. The East end of the Spirit Trail currently ends/begins behind Park and Tilford Mall and Rona at Gladstone Ave. There is also a short section for the new bridge over Lynn Creek, but I am not counting that since it is not yet connected to the main trail.
The trail winds up a little hill which is fun to bike down.
This section passes Heywood Street, which provides a north/south street connection to East Keith Road.
Moodyville Park
Section B. This section of the #SpiritTrail crosses 3rd Street on a bridge and passes through Moodyville Park. It provides a safer alternative to the 3rd Street Hill or Low Level Road. The bridge provides a view point for the train yard, Burnaby Mountain, and our local coal pile.
2nd Street to St Georges
Section C. This portion of the #SpiritTrail is mostly on side streets between Moodyville Park and St David's Ave and there are a few different routes you can take, including a suspension bridge that is only suitable for walking. West of St Davids Ave it is the standard separated MUP.
Travelling through this area you can hear the hum of the granaries and the noise of new condos being built. A few solitary houses remain from the old Moodyville neighbourhood.
Between St Patricks and St Georges Avenues the trail passes six brew pubs in the Brewery District.