HUB Tri-Cities Successes: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 15: | Line 15: | ||
*Lougheed Highway multi-use pathway, south side, between Barnet Highway and Christmas Way (2023) |
*Lougheed Highway multi-use pathway, south side, between Barnet Highway and Christmas Way (2023) |
||
*Lougheed Highway multi-use pathway, south side, between Christmas Way and Pinetree Way (2022) |
|||
*Prairie Avenue multi-use pathway between Coast Meridian Road and Burns Road (2022) |
*Prairie Avenue multi-use pathway between Coast Meridian Road and Burns Road (2022) |
Revision as of 05:36, 10 February 2024
Return to Tri-Cities Committee Wiki
This list is only partial.
- Maze gate removal, Coquitlam, Belcarra Regional Park, and Port Coquitlam (Ongoing)
- Gatensbury multi-use pathway, Regan Ave to Port Moody (2023)
- Lougheed Highway multi-use pathway, north side, Pinetree Way to Westwood St (2023)
- Guildford Greenway, Phase 1 - Johnson to Port Moody (2023)
- Sumiqwuelu (formerly Riverview) wayfinding signage & chain removal from pathway (2023)
- Lougheed Highway multi-use pathway, south side, between Barnet Highway and Christmas Way (2023)
- Prairie Avenue multi-use pathway between Coast Meridian Road and Burns Road (2022)
- King Albert Greenway multi-use pathway from Blue Mountain Street to Hillcrest Street, extended 2021
- Coquitlam bike parking minimums, 2021
- Lougheed Highway multi-use pathway, south side, between Christmas Way and Westwood St (2020)
- Gatensbury Road multi-use pathway, Coquitlam border to Henry St (2019 Infrastructure Improvement Award)
- Lougheed Greenway multi-use pathway, ~Palm Terrace to Coquitlam Central Station (2019)
- Heritage Mountain extension completed with separated bicycle facilities from Turner Creek Drive to David Avenue (2019)
- Murray Street multi-use pathway extension completed from Electronic Avenue to Hugh Street (2019)
- Sheep Paddocks Trail reopened, connecting Pitt River Road to Colony Farm (2019)
- New access ramp connecting bike facilities on the Moody Street Overpass to the Moody Centre SkyTrain station (2019)
- Dogwood Fairview Citywide Greenway multi-use path built connecting Burquitlam and Lougheed neighbourhoods (2018)
- Murray overpass, Port Moody (Ped/bike overpass to Rocky Point, completed March 2014)
- United Boulevard from New West to King Edward (Sept 2013). MUP plus on road bike lanes.
- Lougheed bike lanes PMH1 (King Edward to Colony farms, completed August 2013)
- Regan Grover temporary MUP in Como Lake park (spring 2013). This is a temporary fix pending the creation the proposed Regan/Grover on-road bike route.
- Guildford extension in Port Moody (fall 2012)
- Murray Avenue bike lane and MUP (fall 2012)
- Broadway bike lanes, Port Coquitlam (2012)
- King Edward overpass bike lanes and MUP, Coquitlam (2012)
- Poirier MUP, Coquitlam (2012)
- David Avenue extension to Port Moody (2012)
- PoCo trail pedestrian signal at Shaughnessy (fall 2012)