[[Media: Belcarra HUB Cycling Assessment Ride 2023.pdf | Belcarra Assessment Ride Report]] |
|||
⚫ | |||
'''Port Moody 9-March-2014:''' |
'''Port Moody 9-March-2014:''' |
||
Ride was initiated in response to meeting with Port Moody staff regarding new proposal bike lane markings on Ungless and Heritage Mountain Blvd. At that meeting proposals were put forth regarding the configuration of on-road lane markings at various intersections. |
Ride was initiated in response to meeting with Port Moody staff regarding new proposal bike lane markings on Ungless and Heritage Mountain Blvd. At that meeting proposals were put forth regarding the configuration of on-road lane markings at various intersections. |
||
Ungless: |
Ungless Avenue: |
||
Roadway is rather narrow. Suggest just using sharrows for the westbound section since route is downhill and space is limited. See video: http://youtu.be/sLKS5hs2pns |
Roadway is rather narrow. Suggest just using sharrows for the westbound section since route is downhill and space is limited. See video: http://youtu.be/sLKS5hs2pns |
||
Line 10: | Line 15: | ||
Heritage Mountain Blvd: |
Heritage Mountain Blvd: |
||
Roadway is very wide and there are no major |
Roadway is very wide and there are no major issues with putting in a marked bike lane. Port Moody sought advice on the treatment at Ravine drive and Turner Creek. After riding this section we believe that the design proposed by Port Moody is probably the best option, i.e. bike lane crosses exit ramp as early as possible. An example of a good treatment that could be modified for Heritage Mtn is northbound on IOCO approaching Guildford: http://youtu.be/543mOU1c3CM. Cyclists have ample opportunity to transition across the exit ramp. Perhaps signage can help here, e.g. remind cyclists to shoulder check before crossing the exit ramp. |
||
Cyclists have ample opportunity to transition across the exit ramp. Perhaps signage can help here, e.g. remind cyclists to shoulder check before crossing the exit ramp. |
|||
Also, we agree with Port Moody that no bike lane is really necessary on the downhill section. Cyclists can easily maintain at least 30 kph and the lanes are very wide. |
Also, we agree with Port Moody that no bike lane is really necessary on the downhill section. Cyclists can easily maintain at least 30 kph and the lanes are very wide. |
||
Line 29: | Line 32: | ||
== 2013 Assessment Rides == |
|||
'''Lougheed Highway''' |
'''Lougheed Highway''' |
Latest revision as of 22:53, 1 August 2023
Return to Tri-Cities Committee Wiki
2023 Assessment Rides
Belcarra Assessment Ride Report
2014 Assessment Rides
Port Moody 9-March-2014: Ride was initiated in response to meeting with Port Moody staff regarding new proposal bike lane markings on Ungless and Heritage Mountain Blvd. At that meeting proposals were put forth regarding the configuration of on-road lane markings at various intersections.
Ungless Avenue: Roadway is rather narrow. Suggest just using sharrows for the westbound section since route is downhill and space is limited. See video: http://youtu.be/sLKS5hs2pns
For eastbound section, marked bike lane would be useful as cyclist speed is much lower. No special treatment needed at intersections here. Note that approach from from IOCO northbound is rather narrow. Sharrows likely needed here. See video: http://youtu.be/SoQkRpqmb0M
Heritage Mountain Blvd: Roadway is very wide and there are no major issues with putting in a marked bike lane. Port Moody sought advice on the treatment at Ravine drive and Turner Creek. After riding this section we believe that the design proposed by Port Moody is probably the best option, i.e. bike lane crosses exit ramp as early as possible. An example of a good treatment that could be modified for Heritage Mtn is northbound on IOCO approaching Guildford: http://youtu.be/543mOU1c3CM. Cyclists have ample opportunity to transition across the exit ramp. Perhaps signage can help here, e.g. remind cyclists to shoulder check before crossing the exit ramp.
Also, we agree with Port Moody that no bike lane is really necessary on the downhill section. Cyclists can easily maintain at least 30 kph and the lanes are very wide.
Lougheed Highway 7-Jan-2014:
Ride covered portion of new PMH1 infrastructure between Colony farm road and ended up at intersection of Brunette and Lougheed (both directions).
Main findings:
-several substandard sections of new bike lanes on Lougheed (PMH1 responsibility) More details to follow.
-very dangerous situation at Lougheed and Brunette where bike lane suddenly ends without warning and resumes a block down the road. Coquitlam responsibility.
Video here: http://www.youtube.com/watch?v=nGXd3AuOclc
2013 Assessment Rides
Lougheed Highway
David Avenue bike lanes