2019-03-14 Agenda: Difference between revisions
Jump to navigation
Jump to search
imported>Dpiercy |
imported>JayJar No edit summary |
||
(8 intermediate revisions by 4 users not shown) | |||
Line 1: | Line 1: | ||
HUB North Shore Committee holds regular meetings at 6:30pm - 8:30pm on the second Thursday of every month. Everybody is welcome. The meetings are at the North Vancouver City Library (14th/Lonsdale) in the Don Preston Boardroom (2nd floor). |
HUB North Shore Committee holds regular meetings at 6:30pm - 8:30pm on the second Thursday of every month. Everybody is welcome. The meetings are at the North Vancouver City Library (14th/Lonsdale) in the Don Preston Boardroom (2nd floor). |
||
Line 7: | Line 8: | ||
* Staff from the 3 municipalities will join us to discuss plans. |
* Staff from the 3 municipalities will join us to discuss plans. |
||
** They hope to have it in place this summer |
** They hope to have it in place this summer |
||
** See here for RFP document to bidders: [[media:CNVLIVE--1759553-v1-RFP_-_Electric-Assist_Bike_Share_Pilot.pdf]] |
|||
===2019 Objectives === |
===2019 Objectives === |
||
Line 15: | Line 16: | ||
** Liaisons to prepare Agenda for meetings with Mayors & Councillors |
** Liaisons to prepare Agenda for meetings with Mayors & Councillors |
||
* How do we measure progress on these goals? |
* How do we measure progress on these goals? |
||
===General=== |
===General=== |
||
* [https://cyclingwithoutage.com Cycling without Age] initiative - Don McPherson |
* [https://cyclingwithoutage.com Cycling without Age] initiative - Don McPherson |
||
*RAC meeting - Jay |
*RAC meeting - Jay |
||
**White papers in progress will be available on committee resources page |
|||
**Committee Action Plan provided to HUB |
|||
**Translink Regional Transportation Strategy update upcoming consultation |
|||
**Committee handbook being updated |
|||
**MOTI meeting with planning department - numerous issues with staff / project continuity impacting progress at closing gaps |
|||
**Potential white paper on business benefits of bike infrastructure |
|||
**State of Cycling - data analysis being finalized, getting pushback on criteria from smaller munis who are concerned about losing bike network classifications, response is the project is not about making munis look good but about safety for users |
|||
**Regional working groups on Central Valley Greenway/Alex Fraser/Pattullo replacement |
|||
**BC Parkway - reviewing feasibility of Langley extension |
|||
**Construction guidelines for bike lanes (Vancouver template) |
|||
**Need new RAC rep from North Shore due to work conflicts |
|||
⚫ | |||
* Infrastructure Funding Tracker - Liaisons to provide updates to HUB HQ |
|||
⚫ | |||
* Guidelines for future "Letter of Support" - Don P |
|||
⚫ | |||
⚫ | |||
⚫ | |||
⚫ | |||
⚫ | |||
⚫ | |||
** MVA act update to Safe Road Act |
** MVA act update to Safe Road Act |
||
** Our goals and how they fit into INSTPP |
** Our goals and how they fit into INSTPP |
||
===Events - Lora === |
===Events - Lora === |
||
Line 39: | Line 40: | ||
** 20 in 20 Infrastructure Award - 2nd Place - West Van |
** 20 in 20 Infrastructure Award - 2nd Place - West Van |
||
* [https://www.eventbrite.ca/e/north-vancouver-b-line-open-house-tickets-57449559178?aff=eemailordconf&utm_campaign=order_confirm&utm_medium=email&ref=eemailordconf&utm_source=eb_email&utm_term=viewevent North Vancouver B-Line Open House] - Mar 18th, 17:00-19:00 |
* [https://www.eventbrite.ca/e/north-vancouver-b-line-open-house-tickets-57449559178?aff=eemailordconf&utm_campaign=order_confirm&utm_medium=email&ref=eemailordconf&utm_source=eb_email&utm_term=viewevent North Vancouver B-Line Open House] - Mar 18th, 17:00-19:00 |
||
* Earth Day at Loutet Farm - Apr 27, 10:00-13:00 - need staff for booth |
|||
* Bike to Work Week - May 27-Jun2 2019 |
* Bike to Work Week - May 27-Jun2 2019 |
||
* [https://www.atsummit.ca/ BC Active Transportation Summit] - June 17 & 18, New Westminister - BC Cycling Coalition. |
* [https://www.atsummit.ca/ BC Active Transportation Summit] - June 17 & 18, New Westminister - BC Cycling Coalition. |
||
* 2019 plan |
* 2019 plan |
||
===City of North Vancouver - Erika/Heather=== |
===City of North Vancouver - Erika/Heather=== |
||
Line 57: | Line 60: | ||
===District of North Vancouver - Antje/Jay/Giacomo === |
===District of North Vancouver - Antje/Jay/Giacomo === |
||
* |
*no February meeting |
||
** new wayfinding signage - receipt of comments acknowledged for LLTC to LVTC proposed routing and wayfinding - no ETA for staff completion |
|||
** 3 priority bikeways provided to staff . |
|||
⚫ | |||
** new wayfinding signage - would like to focus on preferred bikeway routing between Lower Lynn TC / 2nd Narrows and Lynn Valley TC. HUB provided compiled input on what routes we prefer and where improvements are needed for staff assessment. |
|||
⚫ | |||
⚫ | |||
⚫ | |||
⚫ | |||
⚫ | |||
⚫ | |||
⚫ | |||
⚫ | |||
*B-Line impacts / opportunities. |
|||
⚫ | |||
===District of West Vancouver - Paul/Peter=== |
===District of West Vancouver - Paul/Peter=== |
||
*B-Line controversy |
*B-Line controversy |
||
*Proposed Upper Level Multi-use Path |
|||
*2019/20 active transportation budget update |
|||
*13 Feb update from John Calimente, DWV Transportation Planning Analyst |
*13 Feb update from John Calimente, DWV Transportation Planning Analyst |
||
**North Shore e-bike share RFP underway - 1st pilot will be a docking system along Marine Drive corridor, Dundarave to and up Lonsdale, possibly also a dock at Grouse Mountain. |
**North Shore e-bike share RFP underway - 1st pilot will be a docking system along Marine Drive corridor, Dundarave to and up Lonsdale, possibly also a dock at Grouse Mountain. |
||
Line 87: | Line 90: | ||
===MOTI - Giacomo/Antje=== |
===MOTI - Giacomo/Antje=== |
||
* Fencing sidewalks to Lions Gate Bridge (north end) |
Latest revision as of 15:44, 15 March 2019
HUB North Shore Committee holds regular meetings at 6:30pm - 8:30pm on the second Thursday of every month. Everybody is welcome. The meetings are at the North Vancouver City Library (14th/Lonsdale) in the Don Preston Boardroom (2nd floor).
- Agenda additions
- Introductions
- Staff from the 3 municipalities will join us to discuss plans.
- They hope to have it in place this summer
- See here for RFP document to bidders: media:CNVLIVE--1759553-v1-RFP_-_Electric-Assist_Bike_Share_Pilot.pdf
2019 Objectives
- 3 Top Priority Bikeways + Active Transportation Coordinator
- Draft of Presentation to be shared with all North Shore Councils & MLAs - Don
- Liaisons to discuss with municipal staff and get feedback/agreement
- Liaisons to prepare Agenda for meetings with Mayors & Councillors
- How do we measure progress on these goals?
General
- Cycling without Age initiative - Don McPherson
- RAC meeting - Jay
- White papers in progress will be available on committee resources page
- Translink Regional Transportation Strategy update upcoming consultation
- MOTI meeting with planning department - numerous issues with staff / project continuity impacting progress at closing gaps
- State of Cycling - data analysis being finalized, getting pushback on criteria from smaller munis who are concerned about losing bike network classifications, response is the project is not about making munis look good but about safety for users
- BC Parkway - reviewing feasibility of Langley extension
- Need new RAC rep from North Shore due to work conflicts
- HUB Training on NATCO Guidelines - Heather, Paul, Fred & Don attended
- BC Active Transport Strategy - Please provide your comments
- HUB Cycling's Recommendations - a very detailed and well thought out response.
- Meeting with MLA Bowinn Ma - Don, Antje & Erika - Mar 15
- MVA act update to Safe Road Act
- Our goals and how they fit into INSTPP
Events - Lora
- HUB 6th Annual Bike Awards
- Volunteer Appreciation Awards - Peter Scholefield & Tony Valente
- 20 in 20 Infrastructure Award - 2nd Place - West Van
- North Vancouver B-Line Open House - Mar 18th, 17:00-19:00
- Earth Day at Loutet Farm - Apr 27, 10:00-13:00 - need staff for booth
- Bike to Work Week - May 27-Jun2 2019
- BC Active Transportation Summit - June 17 & 18, New Westminister - BC Cycling Coalition.
- 2019 plan
City of North Vancouver - Erika/Heather
- Highlights from Feb 11 meeting
- ITC - Fiona
- Casano – Loutet Overpass - detailed design 60% done, built in late 2019. requesting bike BC funding
- Marine Dr Mosquito Creek Bridge - includes protected bike lanes at the sidewalks in two directions, start in March, finish in Fall
- Next meeting -
- B-Line changes to include 2 sections of off street bikepath: 1) On Third Street along Moodyville Park moving east on the south side 2) from Gladstone to Brooksbank on the southside only. Sent a Letter to Mayor, Council and Staff regarding support for B-Line in general, but also asking for safe bike routes. The route includes Esplanade which really needs fixing.
- Don and Heather responded to a request for comment from CBC regarding the death of the person cycling along Esplanade. When we get the details, we will think about a HUB response.
- We have requested monthly meetings with staff (but have not heard back)
- Attended the INSTPP meeting with TransLink and MLA Bowinn Ma. Many pro-cycling people in the room.
- CNV response re collision on Green Necklace - http://wiki.bikehub.ca/northshore/images/9/93/CNV_response_re_collision_on_Green_Necklace.pdf
District of North Vancouver - Antje/Jay/Giacomo
- no February meeting
- new wayfinding signage - receipt of comments acknowledged for LLTC to LVTC proposed routing and wayfinding - no ETA for staff completion
- Cycling & Work Zones - receipt of comments acknowledged
- NV Bike masterplan update - RFP for consultants released - to follow up
- Provided comments on 1st / Mackay buffered bike lanes - to follow up
- Bike BC funding support request re: 29th Avenue. Letter of support provided - to follow up with conditions for future requests to staff (i.e. must be AAA, preferred on our priority routes).
- Next meeting - April
District of West Vancouver - Paul/Peter
- B-Line controversy
- Proposed Upper Level Multi-use Path
- 2019/20 active transportation budget update
- 13 Feb update from John Calimente, DWV Transportation Planning Analyst
- North Shore e-bike share RFP underway - 1st pilot will be a docking system along Marine Drive corridor, Dundarave to and up Lonsdale, possibly also a dock at Grouse Mountain.
- Hugo Ray connector - Capilano Bridge to 3rd Street on Hwy 1 - waiting for a permit from MoTI.
- 3rd and Mathers ave to Taylor Way - draft design has been sent to MoTI.
- Capilano Pacific Trail improvement up to Keith Road - draft design is with MoTI and Purchasing - TransLink funding - construction will take 3-4 weeks.
- Wayfinding at the north end of Lions Gate Bridge - we will get to comment on the latest iteration.
- Welch Street Bridge sidewalk widening - the plan is with Squamish Nation - Park Royal wants it finished before the busy summer season - widening will be completed before finalizing approach at the east end.
- Royal Avenue Horseshoe Bay - on hold because only enough money for the 1st of 3 phases of the streetscape plan.
- Bike racks for Ambleside and Dundarave - funds are available - design of the racks is being considered whether to adopt a standard or some kind of custom design.
Translink - Fred/Antje
- e-Bikes on Buses - Update on HUB HQ discussions with TransLink
- Bike parking at Exchanges: Space for future at Lonsdale Quay & Phibbs (also space for bike share)
MOTI - Giacomo/Antje
- Fencing sidewalks to Lions Gate Bridge (north end)