Meeting Summary: May 12, 2016: Difference between revisions

From committees
Jump to navigation Jump to search
imported>Peter Scholefield
No edit summary
imported>Peter Scholefield
No edit summary
Line 23: Line 23:
#** Our station will be at the NE exit from the Iron Workers Memorial Brideg from 4 -6 pm on 2 June.
#** Our station will be at the NE exit from the Iron Workers Memorial Brideg from 4 -6 pm on 2 June.
#** Dianne a has arranged to get Obsession Bikes there and will get some refreshments donated.
#** Dianne a has arranged to get Obsession Bikes there and will get some refreshments donated.
#** 529 Garage the community-based bike registration and recovery service may also be there.
#** 529 Garage, the community-based bike registration and recovery service, may also be there.
#** Don will arrange to get some volunteers and our NS-HUB tent along with associated supplies.
#** Don will arrange to get some volunteers and our NS-HUB tent along with associated supplies.
#**Peter has volunteered to be at the DWV sponsored BTWW stations at Lions Gate Bridge 4-6 pm on 1 June and at 14th and Argyle 4:30 - 6:30 pm on 2 June.
#**Peter has volunteered to be at the DWV sponsored BTWW stations at Lions Gate Bridge 4-6 pm on 1 June and at 14th and Argyle 4:30 - 6:30 pm on 2 June.
# HUB presence @ Additional Events: West Van Community Day (4 June), North Van Canada Day (1 July) and Lynn Valley Days (18 June) - Caribbean Days
# HUB presence @ Additional Events: West Van Community Day (4 June), North Van Canada Day (1 July) and Lynn Valley Days (18 June) - Caribbean Days
#** Alex Boston, Chair of the City's Integrated Transportation Committee came to the meeting to discuss promoting cycling at upcoming community event, especially parades.
#** Alex Boston, Chair of the City's Integrated Transportation Committee came to the meeting to discuss promoting cycling at upcoming community events, especially parades.
#** He suggested brainstorming on ways to advance messaging on the need for and use of cycling infrastructure.
#** He suggested brainstorming on ways to advance messaging on the need for and use of cycling infrastructure.
#** It was suggested producing stickers with catchy phrase such as "less cars on the Cut" that could be handed out at community events.
#** It was suggested producing stickers with catchy phrase such as "less cars on the Cut" that could be handed out at community events.
#** James Carter, who is putting together a policy paper on why cycling is important, said he would help prepare the stickers.
#** James Carter, who is putting together a policy paper on why cycling is important, said he would help prepare the stickers.
Line 40: Line 40:
#*** The north side can evolve beyond shared lanes when the property setbacks are reclaimed.
#*** The north side can evolve beyond shared lanes when the property setbacks are reclaimed.
#*** curb bulb-outs and intersections at Jones and Forbes can be hazardous for cyclists.
#*** curb bulb-outs and intersections at Jones and Forbes can be hazardous for cyclists.
#*** Heather suggested that we reposnd to the online survey with our suggestions.r
#*** Heather suggested that we respond to the online survey with our suggestions.
#** East Keith and Grand Boulevard
#** East Keith and Grand Boulevard Plans
#*** Bike lanes on the pavement, up east down west.

#*** green paint would be desirable at intersection crossings.

#*** The multi-use path going east only 3 m wide.
#* DNV Update (5 min Tony / Antje)
#** Spirit Trail bridge and tunnels under boat access then a bridge will cost $5 million
#** Council workshop on AAA bike network / Kay Teschke
#* DNV Update
#** MLA Meetings
#** May 9 Council workshop on AAA bike network / Kay Teschke was successful - we should try to arrange one for the DWV.
The mayor was listening and recognizes 2nd narrows bottleneck.
#*** Discussion included what types of infrastructure to build to attract more cyclists.
#** Tony is arranging a meeting on the Mountain Highway - Hwy 1 exchange with all three MLAs.
#* DWV Update (20 min Peter)
#* DWV Update (20 min Peter)
#** Separating pedestrians from cyclists on the planned extension of Spirit Trail through Ambleside
#** Separating pedestrians from cyclists is being planned for the extension of the nSpirit Trail through Ambleside.
#** The newly paved, one-way east section of Keith Road is not safe for cyclists due to narrow width for eastbound car traffic and two-way cyclist traffic.
#** Status of Keith Road Safety Improvements
#** HUB-NS input to planning Cypress Village has not yet been rescheduled but we should suggest separated bike lanes to and inside the village
#** Meeting with John Calimente on May 4
#** Meeting with John Calimente on May 4
#***
#** HUB-NS input to planning Cypress Village


ACTIONS LIST
# Tactical Contact List (Tony)
#*All bike shops
#*NSMBA, other bike groups
#*Differently abled

#Bike Theft Support Letter

Notes 12 May 16
Giacomo, Heather, Peter S, Alex Boston (guest) Paul, Fred, James Carter, Don P. Tony (Chair), Fiona, Brian



minutes - workshop next monday

1.events
a. Gleneagles paul briefed
more NS bike maps coming perhaps from VNV but now Tranlnik has the rights t
b. MEC cathey form HUB memvbership coming
Nelson Fred Jac don ther all day
11-5 pm
Cnada bike day
BTWW
Dianne Obsession bikes
orgnic energy dringkd
maybey 529
iron worker -Jack and other
Don will get volunteers for other events
c Parades alex
need to advace messaging need and use of infrastucture
brainstorm on message such as less cars on the cut
distibute a one pager
james putting together a policy paper on why cycling is important
discussion about policy
get electic bikes
get sticker with a message congestion managment or health
me to register
d. canad bike day
distribute poster
obsession bikes
500 grant from Canada Bikes
wilkenson's off ic wil come
sign waiver
needs 8 people
invitiation sent
RCMP may come
need tent Don will bring it
taslk will be posted
me to contact john weston

CNV

grand boublevar east Keith up east down west for bike llanes
green paint and sep
multi-use palth going east only 3m wide
Spirit Trail bridge and tunnels under boat acess then a bridge $5 million
Alex would like copies of HU correspondence to ITC

DNV
kay teske workshop last Monday 9 may
what types of infrastruct to build to attrack more cycvlists
shoild get her for West Van
interchanges 7 page letter into a presetation
to John Wilkenson suggest meeting with DNV and MLA
mayor was listening and recognizes 2nd narrows bottleneck
set up meeting with MlS

Revision as of 23:01, 7 June 2016

  1. Attendance: Giacomo, Heather, Peter S, Alex Boston (guest), Paul, Fred, James Carter, Don P. Tony (Chair), Fiona, Brian
  2. Minutes from the April meeting were reviewed
  3. Review and planning for upcoming events
    • Gleneagles Bikefest Saturday, May 28 10am-1pm at the Gleneagles Community Centre
      • Paul and Peter met with organizers who are going to provide two tables to go with our HUB tent.
      • Paul has offered to lead a ride from the community centre.
      • Paul will be there with Anne, Dianne and a couple from the West Van Seniors cycling groups.
      • Peter will try to arrange to bring a TransLink demo bus bike rack.
    • MEC Bikefest Saturday, May 28 11 am - 5 pm
      • Cathy from HUB membership coming
      • Nelson, Fred, Giacomo, and Don plan to be there all day
    • Canada Bike Day Monday, May 30 4 - 6 p.m. at North Van Civic Square
      • Tom Walker will run a bike rodeo.
      • Local politicians will be invited as well as RCMP.
      • Obsession Bikes will be there
      • 5 km and 10 km group rides are planned.
      • Fiona arranged to get a $200 grant from Canada Bikes and used some of it to produce flyers, some of which she distributed at the meeting.
      • A City staff person will be there.
      • Fiona requested and got names from some of us to volunteer to come and help
      • Don will arrange to be there with the HUB tent.
    • Bike to Work Week
      • Our station will be at the NE exit from the Iron Workers Memorial Brideg from 4 -6 pm on 2 June.
      • Dianne a has arranged to get Obsession Bikes there and will get some refreshments donated.
      • 529 Garage, the community-based bike registration and recovery service, may also be there.
      • Don will arrange to get some volunteers and our NS-HUB tent along with associated supplies.
      • Peter has volunteered to be at the DWV sponsored BTWW stations at Lions Gate Bridge 4-6 pm on 1 June and at 14th and Argyle 4:30 - 6:30 pm on 2 June.
  4. HUB presence @ Additional Events: West Van Community Day (4 June), North Van Canada Day (1 July) and Lynn Valley Days (18 June) - Caribbean Days
      • Alex Boston, Chair of the City's Integrated Transportation Committee came to the meeting to discuss promoting cycling at upcoming community events, especially parades.
      • He suggested brainstorming on ways to advance messaging on the need for and use of cycling infrastructure.
      • It was suggested producing stickers with catchy phrase such as "less cars on the Cut" that could be handed out at community events.
      • James Carter, who is putting together a policy paper on why cycling is important, said he would help prepare the stickers.
      • Other phrases could focus on congestion management and the health benefits of cycling.
      • It was suggested that we try to get e-bike demonstations at these events but promoting a business may be problematic.
      • Peter will register HUB-North Shore for entry into the West Van Community Day parade and a place for our tent after the parade in Ambleside Park.
  5. Municipalities
    • CNV Update
      • West Keith Road plans
        • 1.6 m separated uphill lane on the south side, protected up the hill to Jones then buffered from there on is acceptable.
        • The north side can evolve beyond shared lanes when the property setbacks are reclaimed.
        • curb bulb-outs and intersections at Jones and Forbes can be hazardous for cyclists.
        • Heather suggested that we respond to the online survey with our suggestions.
      • East Keith and Grand Boulevard Plans
        • Bike lanes on the pavement, up east down west.
        • green paint would be desirable at intersection crossings.
        • The multi-use path going east only 3 m wide.
      • Spirit Trail bridge and tunnels under boat access then a bridge will cost $5 million
    • DNV Update
      • May 9 Council workshop on AAA bike network / Kay Teschke was successful - we should try to arrange one for the DWV.

The mayor was listening and recognizes 2nd narrows bottleneck.

        • Discussion included what types of infrastructure to build to attract more cyclists.
      • Tony is arranging a meeting on the Mountain Highway - Hwy 1 exchange with all three MLAs.
    • DWV Update (20 min Peter)
      • Separating pedestrians from cyclists is being planned for the extension of the nSpirit Trail through Ambleside.
      • The newly paved, one-way east section of Keith Road is not safe for cyclists due to narrow width for eastbound car traffic and two-way cyclist traffic.
      • HUB-NS input to planning Cypress Village has not yet been rescheduled but we should suggest separated bike lanes to and inside the village
      • Meeting with John Calimente on May 4