"Low hanging fruit" list

From committees
Jump to navigation Jump to search

City of North Vancouver

  • Signage
    • Lynn Valley Road bypass from Sutherland to Lynn Valley Town Centre/Mall via 21st St, Rufus, Kirkstone Park (with DNV)
    • From Westview to MOTI path along Hwy 1/Pemberton Heights
  • Pavement markings
    • Green Necklace bike/walk stencils
    • Green Necklace crossbike at street crossings
    • Queensbury at Keith: bike lane or at least sharrows
    • East Keith Road bike lane, with separators (with DNV)
    • 17th St around Lonsdale: diverter or other means to reduce traffic
    • 13th St east of St Georges: fix bike stencils that are marked too close to parked cars
    • Brooksbank at Cotton: mark bike box to allow cyclists coming from multi-use trail at MEC store to connect with eastbound bike lane on Cotton/Main
  • Separators (to prevent vehicles from entering the bike lane)
    • Low Level Rd
    • 3rd St uphill
  • Curb drops
  • Other improvements

District of North Vancouver

  • Signage
    • Lynn Valley Road bypass from Sutherland to Lynn Valley Town Centre/Mall via 21st St, Rufus, Kirkstone Park (with CNV)
    • Philip Ave connection between Pemberton Heights and Edgemont
    • West Van-North Van connection via Hwy 1 Capilano River bridge (with MOTI, West Van)
  • Pavement markings
    • East Keith Road bike lane, with separator (with CNV)
  • Separators (to prevent vehicles from entering the bike lane)
    • Mount Seymour Parkway
  • Curb drops
    • Spirit Trail at Lloyd: widen curb drop to width of marked crosswalk
  • Other improvements