HUB Tri-Cities Videos
This page shows videos taken during assessment rides and is an attempt to document cycling trouble spots and success stories in the TriCities.
Port Mann Bridge: Connector Lougheed-United Blvd connector
This new bike line takes cyclists eastbound on Lougheed up a dedicated ramp and places them on a shoulder with traffic exiting Highway 1. The bike lane ends at United Blvd.
Como Creek path south of United Blvd
Heading south on multi use path along Como Creek.
http://youtu.be/ZK03Py7_GBQ (January2015)
Maryhill Bypass old train tunnel
Heading north along the eastern perimeter of the PMH1 construction site. This is an old train tunnel that should form part of a new Metro Van watermain trail.
http://youtu.be/ZRwaEqxKWGY (January 2015)
United Blvd sidewalks
Heading eastbound on the north side between King Edward and Brigantine. The question is, can this be used as a temporary gap connector between PM bridge and CVG?
http://youtu.be/q7eH2gaaXGg (November 2014)
Port Mann bridge south bound on ramp
Starting at United and Mary Hill, as of 15 Feb 2015
Bailey Bridge
New Westminster/Coquitlam Bailey Bridge as of 14 Feb 2015
Brunette/Lougheed:
Approaching westbound: http://youtu.be/DpjHFUDxnBM
Approaching eastbound,old lane markings: http://youtu.be/T-ZvPCYe6sAUnitered
Approaching eastbound,updated lane markings (fall 2014): http://youtu.be/1-naLoBLvus
Lougheed/United:
Lougheed highway westbound at United Blvd: http://youtu.be/n25Md3Tw-r4
Lougheed-Pitt River Road
Intersection of Pitt River Road and Lougheed Highway: http://youtu.be/xjufc1qZ2aA
Lougheed-Colony Farms Road
Eastbound on Lougheed, approaching Colony Farms road: http://youtu.be/Ad4be2Qy9fo
Views of new Lougheed bike lanes: (PMH1 jurisdiction)
Lougheed/Coleman,Eastbound: http://youtu.be/y1U-QxlNj_I
Pitt River Bridge:
Switchbacks on bike lane (cycling west): http://youtu.be/IYL3no0eo_A