Meeting Agenda: Oct 11, 2018: Difference between revisions

From committees
Jump to navigation Jump to search
imported>Peter Scholefield
No edit summary
imported>Peter Scholefield
No edit summary
Line 12: Line 12:
'''District of North Vancouver'''
'''District of North Vancouver'''
*Phibbs Exchange Designs
*Phibbs Exchange Designs
*Possible improvements to the east approach to the Hwy1 bridge over the Capilano River (http://wiki.bikehub.ca/northshore/images/7/72/EB_Bikes_on_North_Side_of_Cap_River_Hwy_Bridge.pdf) and http://wiki.bikehub.ca
*Highway 1/Lower Lynn Improvements Project
*Highway 1/Lower Lynn Improvements Project
*Lynn Valley Road improvements
*Lynn Valley Road improvements
Line 19: Line 18:
*Status of proposed safety improvements to the Spirit Trail alongside Welch Street (http://wiki.bikehub.ca/northshore/images/1/1a/Spirit_Trail_Improvements_3-08-18.pdf)
*Status of proposed safety improvements to the Spirit Trail alongside Welch Street (http://wiki.bikehub.ca/northshore/images/1/1a/Spirit_Trail_Improvements_3-08-18.pdf)
*Update on sidewalk widening on the Welch Street bridge over the Capilano River
*Update on sidewalk widening on the Welch Street bridge over the Capilano River
*17 October meeting with District transportation staff **East end of Keith Road to 3rd Street
*17 October meeting with District transportation staff


'''City of North Vancouver'''
'''City of North Vancouver'''

Revision as of 16:32, 5 October 2018

HUB North Shore Committee holds regular meetings at 6:30pm - 8:30pm on the second Thursday of every month. Everybody is welcome. The meetings are at the North Vancouver City Library (14th/Lonsdale) in the Don Preston Boardroom (2nd floor).

District of North Vancouver

  • Phibbs Exchange Designs
  • Highway 1/Lower Lynn Improvements Project
  • Lynn Valley Road improvements

District of West Vancouver

City of North Vancouver

  • Results of meeting between HUB-NS and City of North Vancouver Engineering, Parks and Environment staff.