Difference between revisions of "HUB Delta Great Blue Heron Way sub-committee"

From committees
Jump to navigation Jump to search
Line 4: Line 4:
   
 
[[File:D Grigg L Lebrun Letter To The Honourable Claire Trevena, Minister of Transportation and Infrastructure Rev 01.pdf]]
 
[[File:D Grigg L Lebrun Letter To The Honourable Claire Trevena, Minister of Transportation and Infrastructure Rev 01.pdf]]
  +
  +
'''Photo of alternative route to railway crossing at the Port'''
  +
  +
[[File:Ditch between dike and 34St at Delta TFN boundary sm.jpg]]
   
   

Revision as of 13:47, 1 May 2019

2019

Letter to Minister (MoTI) from Trails BC and Arbutus Greenway Improvements Society (AGIS)

File:D Grigg L Lebrun Letter To The Honourable Claire Trevena, Minister of Transportation and Infrastructure Rev 01.pdf

Photo of alternative route to railway crossing at the Port

Ditch between dike and 34St at Delta TFN boundary sm.jpg


NEW Vision Statement

File:GBHWVision byRuthAdams.pdf


February 5, 2019 Meeting Notes

File:SUBCOMMITTEE NOTES Draft GBHW Feb 5 2019.pdf


2018

Railway barrier

File:24 Oct 2018 Overcoming the railroad tracks at Deltaport TrailsBC.pdf


2017

File:City of Delta Deltaport Way 27B Avenue Pedestrian Overpass.pdf


2016 and 2015


Funded bike infrastructure (The boardwalk connect to breakwater was officially opened Sept 23, 2016)

File:2015TRAN0114-001481 MoTI funds for TFN cycle path.pdf


Vision and project description document (old)

File:April 2015 GBHW Summary.pdf