Difference between revisions of "HUB Delta Great Blue Heron Way sub-committee"

From committees
Jump to navigation Jump to search
(31 intermediate revisions by the same user not shown)
Line 1: Line 1:
  +
'''2019'''
Vision document
 
   
  +
'''Signage artwork for route on TFN'''
[[File:April_2015_GBHW_Summary.pdf]]
 
   
  +
[[File:GBHW_Signage_size_and_placement.pdf]]
  +
  +
  +
'''August 15 follow-up letter to Chief Ken Baird, TFN'''
  +
  +
[[File:Letter_to_Chief_Ken_Baird.pdf]]
  +
  +
  +
'''August 13 Meeting Notes'''
  +
  +
[[File:SUBCOMMITTEE_NOTES_Draft_GBHW_Aug_13_2019.pdf]]
  +
  +
  +
'''August 13 Agenda'''
  +
  +
[[File:August_13_Agenda_HUB_Delta_GBHW_sub-committee_.pdf]]
  +
  +
  +
'''Annotated GBHW route map for Delta'''
  +
  +
[[File:GBHW_Delta_route_map_only.pdf‎]]
  +
  +
  +
'''GBHW Route Map, Léon LeBrun, July 9, 2019'''
  +
  +
https://www.google.com/maps/d/u/0/viewer?hl=en&ll=49.069678544465724%2C-122.74920764257814&z=10&mid=10vAs99rh6D3fM1x39UJEQDS5JfCkOTyp
  +
  +
  +
'''Route Map through Delta'''
  +
  +
[[File:Route Map from GBHW Elder Ruth Adams slide presentation.pdf]]
  +
  +
'''June 18 Presentation by Elder Ruth Adams at the BC Active Transportation Summit'''
  +
  +
[[File:GBHW_Elder_Ruth_Adams_slide_presentation_sm.pdf‎]]
  +
  +
  +
'''Letter to Minister (MoTI) from Trails BC and Arbutus Greenway Improvements Society (AGIS)'''
  +
  +
[[File:D Grigg L Lebrun Letter To The Honourable Claire Trevena, Minister of Transportation and Infrastructure Rev 01.pdf]]
  +
  +
  +
'''Photos of route barriers near railway crossing at the Port'''
  +
  +
[[File:Great Blue Heron Way Delta route photos.pdf]]
  +
  +
  +
'''NEW Vision Statement'''
  +
  +
[[File:GBHWVision_byRuthAdams.pdf]]
  +
  +
  +
'''February 5, 2019 Meeting Notes'''
  +
  +
[[File:SUBCOMMITTEE_NOTES_Draft_GBHW_Feb_5_2019.pdf‎]]
  +
  +
  +
'''2018'''
   
 
Railway barrier
 
Railway barrier
   
 
[[File:24_Oct_2018_Overcoming_the_railroad_tracks_at_Deltaport_TrailsBC.pdf]]
 
[[File:24_Oct_2018_Overcoming_the_railroad_tracks_at_Deltaport_TrailsBC.pdf]]
  +
  +
  +
'''2017'''
   
 
[[File:City_of_Delta_Deltaport_Way_27B_Avenue_Pedestrian_Overpass.pdf‎]]
 
[[File:City_of_Delta_Deltaport_Way_27B_Avenue_Pedestrian_Overpass.pdf‎]]
  +
  +
  +
  +
'''2016 and 2015'''
   
   
 
Funded bike infrastructure (The boardwalk connect to breakwater was officially opened Sept 23, 2016)
 
Funded bike infrastructure (The boardwalk connect to breakwater was officially opened Sept 23, 2016)
   
[[2015TRAN0114-001481_MoTI_funds_for_TFN_cycle_path.pdf]]
+
[[File:2015TRAN0114-001481_MoTI_funds_for_TFN_cycle_path.pdf]]
  +
  +
  +
Vision and project description document (old)
  +
 
[[File:April_2015_GBHW_Summary.pdf]]

Revision as of 18:57, 13 November 2019

2019

Signage artwork for route on TFN

File:GBHW Signage size and placement.pdf


August 15 follow-up letter to Chief Ken Baird, TFN

File:Letter to Chief Ken Baird.pdf


August 13 Meeting Notes

File:SUBCOMMITTEE NOTES Draft GBHW Aug 13 2019.pdf


August 13 Agenda

File:August 13 Agenda HUB Delta GBHW sub-committee .pdf


Annotated GBHW route map for Delta

File:GBHW Delta route map only.pdf


GBHW Route Map, Léon LeBrun, July 9, 2019

https://www.google.com/maps/d/u/0/viewer?hl=en&ll=49.069678544465724%2C-122.74920764257814&z=10&mid=10vAs99rh6D3fM1x39UJEQDS5JfCkOTyp


Route Map through Delta

File:Route Map from GBHW Elder Ruth Adams slide presentation.pdf

June 18 Presentation by Elder Ruth Adams at the BC Active Transportation Summit

File:GBHW Elder Ruth Adams slide presentation sm.pdf


Letter to Minister (MoTI) from Trails BC and Arbutus Greenway Improvements Society (AGIS)

File:D Grigg L Lebrun Letter To The Honourable Claire Trevena, Minister of Transportation and Infrastructure Rev 01.pdf


Photos of route barriers near railway crossing at the Port

File:Great Blue Heron Way Delta route photos.pdf


NEW Vision Statement

File:GBHWVision byRuthAdams.pdf


February 5, 2019 Meeting Notes

File:SUBCOMMITTEE NOTES Draft GBHW Feb 5 2019.pdf


2018

Railway barrier

File:24 Oct 2018 Overcoming the railroad tracks at Deltaport TrailsBC.pdf


2017

File:City of Delta Deltaport Way 27B Avenue Pedestrian Overpass.pdf


2016 and 2015


Funded bike infrastructure (The boardwalk connect to breakwater was officially opened Sept 23, 2016)

File:2015TRAN0114-001481 MoTI funds for TFN cycle path.pdf


Vision and project description document (old)

File:April 2015 GBHW Summary.pdf