Difference between revisions of "United Boulevard, King Edward to Fawcett"

From committees
Jump to navigation Jump to search
 
(One intermediate revision by the same user not shown)
Line 7: Line 7:
 
'''Problem'''
 
'''Problem'''
   
Last remaining gap in CVG from down town Vancouver to Port Mann Bridge
+
Last remaining gap in the Central Valley Greenway from downtown Vancouver to north Surrey
   
 
Map of challenges in United Blvd corridor as of March 2014: [[Media:Cvg-extension-update-2014.jpeg.jpeg]]
 
Map of challenges in United Blvd corridor as of March 2014: [[Media:Cvg-extension-update-2014.jpeg.jpeg]]
Line 13: Line 13:
 
'''Recommendations'''
 
'''Recommendations'''
   
Temporary solution is to widen sidewalks in front of big box retail outlets. Coquitlam should also consider gravel MUP on south side of United. Total distance is 980m.
+
Coquitlam and MOTI should build a route behind the big box stores to prevent as many vehicle collisions as possible. Barring this, a multi-use path on the north side of United Boulevard may work.

Latest revision as of 23:58, 7 June 2021

Location

United Blvd section between King Edward and Brigantine

Length: 1.0km

Problem

Last remaining gap in the Central Valley Greenway from downtown Vancouver to north Surrey

Map of challenges in United Blvd corridor as of March 2014: Media:Cvg-extension-update-2014.jpeg.jpeg

Recommendations

Coquitlam and MOTI should build a route behind the big box stores to prevent as many vehicle collisions as possible. Barring this, a multi-use path on the north side of United Boulevard may work.