Difference between revisions of "September 2015"

From committees
Jump to navigation Jump to search
(Created page with "'''TriCities HUB Committee Meeting Minutes''' '''Date/Time:''' Sept 1, 2015, 7:00-8:50PM. '''Location:''' Coquitlam Public Library, 1169 Pinetree Way, Coquitlam '''Atten...")
 
 
(One intermediate revision by the same user not shown)
Line 19: Line 19:
 
Claude Theriault
 
Claude Theriault
   
Chad Hooper (blindmanchad@gmail.com)
+
Chad Hooper
   
 
David Dowdell
 
David Dowdell
Line 29: Line 29:
 
-Signage requests: Signage is currently being installed on the Port Mann Routes. Unless one is familiar with the area it is not obvious how to get to/from the bridge.
 
-Signage requests: Signage is currently being installed on the Port Mann Routes. Unless one is familiar with the area it is not obvious how to get to/from the bridge.
   
  +
-MOTI has agreed to provide a short gravel MUP at the corner of Maryhill/United which will provide access from the PM bridge to Macquabeak park and points east.
-Metro Van water line updates: A new water main is being installed in a tunnel that goes under the Fraser River near the Port Mann at Macquabeak Park.
 
   
 
-Metro Van water line updates: A new water main is being installed in a tunnel that goes under the Fraser River near the Port Mann at Macquabeak Park. Some work near the river has potential to impact trail access. MetroVan has assured us that access will be maintained during the three weeks of work.
-MUP from Maryhill/United to Macquabeak: From the corner of the Marry hill bypass with United, a gravel trail connects Macquabeak Park to a trail along the Mary Hill Bypass across a 2m wide bridge over the Pitt River. The Sheep Paddock trail is being built and will soon connect with the Macquabeak Park and the PoCo Trail.
 
   
 
-MUP from Macquabeak to Coquitlam River bridge: From the corner of the Mary Hill bypass/United, an old gravel trail connects Macquabeak Park to a trail along the Mary Hill Bypass across a sidewalk on the bridge over the Coquitlam river. We are working on formalizing this trail. It is encouraging that the recent significant wind damage was cleaned up by some undetermined government agency.
Hub remains committed to the trail connecting the Port Mann to Braid Station and the Central Valley Greenway along the north side of the big box retailers along United Blvd. This is politically difficult, but the best long-term option.
 
  +
 
-HUB remains committed to the trail connecting the Port Mann to Braid Station and the Central Valley Greenway along the north side of the big box retailers along United Blvd. This is politically difficult, but the best long-term option.
   
 
2. Bike-to-work stations coming up.
 
2. Bike-to-work stations coming up.

Latest revision as of 10:29, 13 September 2015

TriCities HUB Committee Meeting Minutes

Date/Time: Sept 1, 2015, 7:00-8:50PM.

Location: Coquitlam Public Library, 1169 Pinetree Way, Coquitlam

Attendees:

Jack Trumley (chair)

Andrew Hartline

Peter Jongbloed (part time)

Eric Cheng

George Snow

Claude Theriault

Chad Hooper

David Dowdell

Minutes:

1. Updates regarding Port Mann Bridge and related issues

-Signage requests: Signage is currently being installed on the Port Mann Routes. Unless one is familiar with the area it is not obvious how to get to/from the bridge.

-MOTI has agreed to provide a short gravel MUP at the corner of Maryhill/United which will provide access from the PM bridge to Macquabeak park and points east.

-Metro Van water line updates: A new water main is being installed in a tunnel that goes under the Fraser River near the Port Mann at Macquabeak Park. Some work near the river has potential to impact trail access. MetroVan has assured us that access will be maintained during the three weeks of work.

-MUP from Macquabeak to Coquitlam River bridge: From the corner of the Mary Hill bypass/United, an old gravel trail connects Macquabeak Park to a trail along the Mary Hill Bypass across a sidewalk on the bridge over the Coquitlam river. We are working on formalizing this trail. It is encouraging that the recent significant wind damage was cleaned up by some undetermined government agency.

-HUB remains committed to the trail connecting the Port Mann to Braid Station and the Central Valley Greenway along the north side of the big box retailers along United Blvd. This is politically difficult, but the best long-term option.

2. Bike-to-work stations coming up.

The following stations are planned:

• -Ioco and Murray on Mon Oct 26th afternoon in Port Moody.

• -Landsdowne and Guilford on Wed Oct 28th 6:30am-9am in Coquitlam

Local committee support is requested.

3. Event requests

Hub Tricities has been requested to attend the following events:

• -Rivers and Trails Festival, Sept 27, Port Coquitlam

Request: Info table. Confirmed. (Volunteeers: Simon,Dave D, +?)

• -Burrard Inlet Fish Festival, Sept 26th, from noon to 6pm, at Rock Point Park. Request: Info table/tent, workshop on benefits of cycling

• -Coquitlam Crunch Challenge, Sept 12. (Jack has details)

4. Tent purchase: It was suggested that it would be a good idea to purchase a tent which could be used at events such as those listed in Item 3.

5. Brunette-Lougheed intersection. How are the new markings working? Just fine.

6. AOB

Andrew reported that on Saturday Sept 12 from 11:00 AM TO 3:00 PM, The City of Port Moody will be having a transportation safety fair. Andrew would like volunteers to help run a HUB information table. Volunteers should contact Andrew.

Eric asked if there is a system to report cycling related issues to HUB and to local municipalities. It was suggested that an online form would help to make it easy. This was thought to be a good idea. Jack to take up the suggestion with Simon.

Dates of next two meetings:

• October 6

• November 3