Difference between revisions of "Meeting Summary: March 9, 2017"
Jump to navigation
Jump to search
imported>Peter Scholefield |
imported>Tony |
||
(13 intermediate revisions by 2 users not shown) | |||
Line 1: | Line 1: | ||
+ | *Introductions:Stephanie, Morgan, Lyle, Riane, (all four from Lynn Valley) Fred, Tony (chair), Peter S, Peter T, Don P, Fiona, Erika |
||
− | *Introductions: |
||
+ | *Events - Don explained why we should talk to people who are interested but not active in cycling and then led a discussion on the following upcoming events for 2017: |
||
− | *Review of prior meeting minutes |
||
+ | **MEC Bike Day - April 29th – we have an invite and there is an excellent audience. |
||
− | |||
+ | **Bike Day in Canada on Thursday 1 June – Fiona will organize it. |
||
− | *Events |
||
+ | **Bike to Work Week - May 29th to June 4th 2017 - propose a BTWW station on 29 May at the east side of IWMB in the afternoon - other possibilities are a morning station at Barrow St connector and the south of MEC |
||
− | **MEC Bike Day - April 29th |
||
+ | **Bike to School Week - we need HUB poster at least two weeks before the event - get police on bikes to visit schools - contact Carol Sartor from Haste - Could HUB provide a kit with info that we could send to school PACs and DPAC? |
||
− | **Bike to Work Week - May 29th to June 4th 2017 - proposal for BTWW station date, morning station at Barrow St connector |
||
+ | **West Vancouver Community Day on Saturday, June 3 - debatable whether we should participate. |
||
− | **Gleneagles Bike fest 27 May 2017 |
||
+ | **Blueridge Good Neighbor Day (BGND) is an annual community celebration that starts with a parade - we participated last year and this year it is on 4 June. |
||
− | ** West Van Bike to Shop Days July 21-23 |
||
+ | **Lynn Valley Day on 17 June - We will do with a booth - Lynn Valley won the bike to school award. |
||
− | **Events List http://wiki.bikehub.ca/northshore/images/b/ba/Possible_Events_2017.docx |
||
+ | **Gleneagles Bike Fest - 27 May 2017 - we have been invited - We should participate and perhaps can share our tent with the WV seniors cycle group as we did last year. |
||
− | |||
+ | **West Van Bike to Shop Days July 21-23 - Peter S and Paul have volunteered to lead a ride from Vancouver. |
||
− | *Sunrise Bike Ride next steps |
||
+ | **Harmony Arts Festival in August - it was suggested that we could partner with BEST for bike valley service (Dianne is a contact as she sometimes helps with bike valet). |
||
− | **Proposal for routes and day for timing - coordination with DWV / CNV / DNV |
||
+ | **Car Free day aka Happy City Day - costly but worthwhile. |
||
− | http://wiki.bikehub.ca/northshore/images/4/46/Sunrise_Bike.docx |
||
+ | **Deep Cove Day - Don will try to get a lower entry price. |
||
− | http://wiki.bikehub.ca/northshore/images/c/c9/SUNRISEBIKE_-_CampagnaTour2015.pdf |
||
+ | **Coho Festival was great last year with lots of action at our tent but there is may be an entry price. |
||
− | http://wiki.bikehub.ca/northshore/images/b/b8/SUNRISEBIKE_-_ReasonWhy_2016_ITA_%281%29.pdf |
||
+ | **Sunrise Bike Ride next steps - Tony will coordinate routes and day for timing with DWV / CNV / DNV - might have it on Canada Day? |
||
− | http://wiki.bikehub.ca/northshore/images/0/05/SUNRISEBIKE_-_Sposorship_2016.pdf |
||
+ | ***http://wiki.bikehub.ca/northshore/images/4/46/Sunrise_Bike.docx |
||
− | |||
+ | ***http://wiki.bikehub.ca/northshore/images/c/c9/SUNRISEBIKE_-_CampagnaTour2015.pdf |
||
− | *UnGapTheMap |
||
+ | ***http://wiki.bikehub.ca/northshore/images/b/b8/SUNRISEBIKE_-_ReasonWhy_2016_ITA_%281%29.pdf |
||
− | |||
+ | ***http://wiki.bikehub.ca/northshore/images/0/05/SUNRISEBIKE_-_Sposorship_2016.pdf |
||
− | *Province |
||
+ | ** Other possible events could be the summer shipyard events and the – night market event every week during the summer. |
||
− | **Hwy 1 - Lower Lynn Improvements open house recap |
||
+ | **Events List is at: http://wiki.bikehub.ca/northshore/images/b/ba/Possible_Events_2017.docx |
||
− | **Bike Highway Concept and MLA Meeting (Friday March 3, 2017) |
||
+ | *Hwy 1 - Lower Lynn Improvements open house recap |
||
− | http://wiki.bikehub.ca/northshore/images/2/26/BikeHighway2017-ER.pdf |
||
+ | **Bike Highway Concept and MLA Meeting (Friday March 3, 2017) - MLA said to meet with Jay Porter and next meeting with him will be on 10 April. |
||
− | |||
+ | **Morgan says the major gap is a connection from the interchange into Lynn Valley which is a DNV responsibility. |
||
− | *City of North Vancouver |
||
+ | **Riane is concerned about the plans for coming off the interchange - no bike lane on the north off-ramp up to Mountain Highway. |
||
+ | **Public comments are open until this weekend. |
||
+ | **phase 4 could occur before phase 3, so DNV needs to get involved and we need to follow up with them. |
||
+ | **There is problem with cleaning separated bike lanes - special equipment is needed and could be shared. |
||
+ | **We are encouraging green paint and flashing lights in conflict areas. |
||
+ | **Metro Van has a sewer facilities nearby. |
||
+ | **Jay Porter said there is 17 million for bike infrastructure. |
||
+ | **It would be good to get Jay Porter out on a bike – possibly include him on a a group ride. |
||
+ | **Antje could elaborate more on the project. |
||
+ | **see Tony's cycle highway presentation slides at:http://wiki.bikehub.ca/northshore/images/2/26/BikeHighway2017-ER.pdf |
||
+ | *City of North Vancouver |
||
**Loutet-Casano Overpass open house Mar 2 |
**Loutet-Casano Overpass open house Mar 2 |
||
+ | *** Fiona was there and it won't be done for 2 years out. |
||
− | **Moodyville Park open house Mar 8 |
||
+ | ***Adam from DNV is the public consultation rep and Lisa Parker will be project manager. |
||
− | **Green Necklace Jones to Lonsdale open house Mar 9 |
||
+ | **100m bridge with a max 7% grade but level at intersections and has a gentle curve. |
||
− | |||
+ | ***5.5 million cost - 4 m wide – will be lighting – is a catchment area for Sutherland school. |
||
− | *District of North Vancouver |
||
+ | ***Not yet decided whether there will be packed gravel at the approaches or pavement. |
||
− | **Council workshop on bike network end of March |
||
+ | ***There was discussion about routes into Lynn Valley from the south which would be desirable. |
||
− | **Mountain Highway Interchange cycling wayfinding plan |
||
+ | **Moodyville Park open house was on March 8 - bike infrastructure will be included. |
||
− | |||
+ | **Green Necklace Jones to Lonsdale open house Mar 9 - Peter S and Fiona attended - like separated bike lane option from Jones to Mahon but 3m width for the remainder is too narrow. |
||
− | *West Vancouver |
||
+ | *District of North Vancouver |
||
− | **Results of 31 Jan meeting with DWV Engineering staff |
||
+ | **Council workshop on bike network end of March - lets get as many out as possible – will talk about bike master plan and protected bike lanes. |
||
− | **Review Lions Gate Bridge Area Signage Plan |
||
+ | **Mountain Highway Interchange cycling wayfinding plan - complicated but antje has been the lead in providing comments. |
||
− | **Status of the plans to extend the Spirit Trail down into Horseshoe Bay Village (consider new development in Horseshoe Bay) |
||
+ | **We will meet regularly with MoTI re: interchanges and cycle highway. |
||
− | **Traffic calming project around Eagle Harbour School |
||
+ | *West Vancouver |
||
− | **HUB delegation topic |
||
+ | **Peter reviewed and commented on the Lions Gate Bridge Area Wayfinding Signage Plan which has not yet been widely distributed. |
||
− | |||
+ | **Work will start soon on a switchback path from Nelson Creek up to the Seaview Walk (accessed from Cranley Drive). |
||
− | |||
+ | **HUB delegation to council request has been submitted to talk about successful project, UnGapTheMap and AAA cycle infrastructure. |
||
− | Introductions: |
||
− | Review of prior meeting minutes stephanie morgan lyle fred tony (chair),Riane Peter S, Peter Trunouth, Don P, Fiona, Erika |
||
− | Events |
||
− | Don explained why to talk to peo[le who are interested but not active in cycling |
||
− | MEC Bike Day - April 29th – we have an invite excellent audience |
||
− | bike day in Canada on Thursday 1 June – fiona will organize |
||
− | Bike to Work Week - May 29th to June 4th 2017 - proposal for BTWW station date, morning station at Barrow St connector – lets book it – think about south of MEC decide east side of IWMB afternoon |
||
− | could HUB provide a kit with bike tom school week info – send it to School PACs DPAC |
||
− | west van community day debatable |
||
− | blueridge on 4 June |
||
− | Lynn Vally day on 17 June will do with a booth |
||
− | LynnValley wond the HUB award bike to school |
||
− | get polce on bikes to vist schools |
||
− | contact Carol S or artor from Haste |
||
− | we need HUB poster at least two weeks before the event |
||
− | Gleneagles Bike fest 27 May 2017 |
||
− | West Van Bike to Shop Days July 21-23 |
||
− | summer shipyard events – nightmarket every week |
||
− | partner with BEST for bike valley service during Harmony Arts festival |
||
− | Car Free day costly but worthwhile |
||
− | Bike to shop in West Van paul and i offer to do the ride |
||
− | Deep Cove Day i will try to lower |
||
− | Coho was great entry price |
||
− | Events List http://wiki.bikehub.ca/northshore/images/b/ba/Possible_Events_2017.docx |
||
− | Sunrise Bike Ride next steps |
||
− | Proposal for routes and day for timing - coordination with DWV / CNV / DNV |
||
− | have it on Canada Day? |
||
− | http://wiki.bikehub.ca/northshore/images/4/46/Sunrise_Bike.docx http://wiki.bikehub.ca/northshore/images/c/c9/SUNRISEBIKE_-_CampagnaTour2015.pdf http://wiki.bikehub.ca/northshore/images/b/b8/SUNRISEBIKE_-_ReasonWhy_2016_ITA_%281%29.pdf http://wiki.bikehub.ca/northshore/images/0/05/SUNRISEBIKE_-_Sposorship_2016.pdf |
||
− | UnGapTheMap |
||
− | Province |
||
− | Hwy 1 - Lower Lynn Improvements open house recap |
||
− | Bike Highway Concept and MLA Meeting (Friday March 3, 2017) MLA sais meetiet with jay porter |
||
− | next mtg on 10 April |
||
− | morgan says gap notth connecting to Lynn Valley |
||
− | Riane concerned about coming off interchange |
||
− | public comments open until this weekend |
||
− | phase 4 before pahse 3DNV needs to get involved so we need to follow up with them |
||
− | problem withcleaning separated bike lanes |
||
− | we are encouraging green paint and flahsing lights in conflict areas |
||
− | Metro Van has a sewer facilities nearby |
||
− | Jay said 17 illion for bike infrastructure |
||
− | Antje could provide more comments |
||
− | no bike lane north off ram up Mountain Highway |
||
− | lets get jay porter out on a bike – possibly a group ride |
||
− | http://wiki.bikehub.ca/northshore/images/2/26/BikeHighway2017-ER.pdf |
||
− | City of North Vancouver |
||
− | Loutet-Casano Overpass open house Mar 2 |
||
− | Fiona was there 2 years out Adam public consultation rep and lisa parker will be projecg manger |
||
− | 100m bridge 7% grade level at intersections gentle curve |
||
− | discussion about routes into Lynn Valley from the south |
||
− | packe gravel at en or paved not decided |
||
− | 5.5 million cost 4 m wide – will be lighting – catchment foer sutherland school |
||
− | Moodyville Park open house Mar 8 |
||
− | Green Necklace Jones to Lonsdale open house Mar 9 |
||
− | city wnated our support because of 3m wide |
||
− | District of North Vancouver |
||
− | Council workshop on bike network end of March as many out as possible – talk about bike master pland abd protected bike lanes |
||
− | get |
||
− | Mountain Highway Interchange cycling wayfinding plan |
||
− | Antje providing input |
||
− | will meet rgualry with MoT re interchange and cycle highway |
||
− | West Vancouver |
||
− | Results of 31 Jan meeting with DWV Engineering staff |
||
− | Review Lions Gate Bridge Area Signage Plan |
||
− | Status of the plans to extend the Spirit Trail down into Horseshoe Bay Village (consider new development in Horseshoe Bay) |
||
− | Traffic calming project around Eagle Harbour School |
||
− | HUB delegation topic |
Latest revision as of 22:22, 18 March 2017
- Introductions:Stephanie, Morgan, Lyle, Riane, (all four from Lynn Valley) Fred, Tony (chair), Peter S, Peter T, Don P, Fiona, Erika
- Events - Don explained why we should talk to people who are interested but not active in cycling and then led a discussion on the following upcoming events for 2017:
- MEC Bike Day - April 29th – we have an invite and there is an excellent audience.
- Bike Day in Canada on Thursday 1 June – Fiona will organize it.
- Bike to Work Week - May 29th to June 4th 2017 - propose a BTWW station on 29 May at the east side of IWMB in the afternoon - other possibilities are a morning station at Barrow St connector and the south of MEC
- Bike to School Week - we need HUB poster at least two weeks before the event - get police on bikes to visit schools - contact Carol Sartor from Haste - Could HUB provide a kit with info that we could send to school PACs and DPAC?
- West Vancouver Community Day on Saturday, June 3 - debatable whether we should participate.
- Blueridge Good Neighbor Day (BGND) is an annual community celebration that starts with a parade - we participated last year and this year it is on 4 June.
- Lynn Valley Day on 17 June - We will do with a booth - Lynn Valley won the bike to school award.
- Gleneagles Bike Fest - 27 May 2017 - we have been invited - We should participate and perhaps can share our tent with the WV seniors cycle group as we did last year.
- West Van Bike to Shop Days July 21-23 - Peter S and Paul have volunteered to lead a ride from Vancouver.
- Harmony Arts Festival in August - it was suggested that we could partner with BEST for bike valley service (Dianne is a contact as she sometimes helps with bike valet).
- Car Free day aka Happy City Day - costly but worthwhile.
- Deep Cove Day - Don will try to get a lower entry price.
- Coho Festival was great last year with lots of action at our tent but there is may be an entry price.
- Sunrise Bike Ride next steps - Tony will coordinate routes and day for timing with DWV / CNV / DNV - might have it on Canada Day?
- http://wiki.bikehub.ca/northshore/images/4/46/Sunrise_Bike.docx
- http://wiki.bikehub.ca/northshore/images/c/c9/SUNRISEBIKE_-_CampagnaTour2015.pdf
- http://wiki.bikehub.ca/northshore/images/b/b8/SUNRISEBIKE_-_ReasonWhy_2016_ITA_%281%29.pdf
- http://wiki.bikehub.ca/northshore/images/0/05/SUNRISEBIKE_-_Sposorship_2016.pdf
- Other possible events could be the summer shipyard events and the – night market event every week during the summer.
- Events List is at: http://wiki.bikehub.ca/northshore/images/b/ba/Possible_Events_2017.docx
- Hwy 1 - Lower Lynn Improvements open house recap
- Bike Highway Concept and MLA Meeting (Friday March 3, 2017) - MLA said to meet with Jay Porter and next meeting with him will be on 10 April.
- Morgan says the major gap is a connection from the interchange into Lynn Valley which is a DNV responsibility.
- Riane is concerned about the plans for coming off the interchange - no bike lane on the north off-ramp up to Mountain Highway.
- Public comments are open until this weekend.
- phase 4 could occur before phase 3, so DNV needs to get involved and we need to follow up with them.
- There is problem with cleaning separated bike lanes - special equipment is needed and could be shared.
- We are encouraging green paint and flashing lights in conflict areas.
- Metro Van has a sewer facilities nearby.
- Jay Porter said there is 17 million for bike infrastructure.
- It would be good to get Jay Porter out on a bike – possibly include him on a a group ride.
- Antje could elaborate more on the project.
- see Tony's cycle highway presentation slides at:http://wiki.bikehub.ca/northshore/images/2/26/BikeHighway2017-ER.pdf
- City of North Vancouver
- Loutet-Casano Overpass open house Mar 2
- Fiona was there and it won't be done for 2 years out.
- Adam from DNV is the public consultation rep and Lisa Parker will be project manager.
- 100m bridge with a max 7% grade but level at intersections and has a gentle curve.
- 5.5 million cost - 4 m wide – will be lighting – is a catchment area for Sutherland school.
- Not yet decided whether there will be packed gravel at the approaches or pavement.
- There was discussion about routes into Lynn Valley from the south which would be desirable.
- Moodyville Park open house was on March 8 - bike infrastructure will be included.
- Green Necklace Jones to Lonsdale open house Mar 9 - Peter S and Fiona attended - like separated bike lane option from Jones to Mahon but 3m width for the remainder is too narrow.
- Loutet-Casano Overpass open house Mar 2
- District of North Vancouver
- Council workshop on bike network end of March - lets get as many out as possible – will talk about bike master plan and protected bike lanes.
- Mountain Highway Interchange cycling wayfinding plan - complicated but antje has been the lead in providing comments.
- We will meet regularly with MoTI re: interchanges and cycle highway.
- West Vancouver
- Peter reviewed and commented on the Lions Gate Bridge Area Wayfinding Signage Plan which has not yet been widely distributed.
- Work will start soon on a switchback path from Nelson Creek up to the Seaview Walk (accessed from Cranley Drive).
- HUB delegation to council request has been submitted to talk about successful project, UnGapTheMap and AAA cycle infrastructure.