Difference between revisions of "Meeting Summary: July 9, 2015"

From committees
Jump to navigation Jump to search
imported>Peter Scholefield
imported>Peter Scholefield
Line 5: Line 5:
 
#* will consider a contribution after finding our more info - Peter will check with Amanada
 
#* will consider a contribution after finding our more info - Peter will check with Amanada
 
# Mountain Highway exchange update (Devan 15 min)
 
# Mountain Highway exchange update (Devan 15 min)
C Heather will circulate the draft HUB response
+
#* Devan and Antje who worked on a HUB letter were not preset to discuss this item m- Heather will circulate the draft HUB response letter to MoT for comment
letter to MoT for comment
 
 
# Car Free day August 22 (Heather 5 min)
 
# Car Free day August 22 (Heather 5 min)
 
#* on Lonsdale
 
#* on Lonsdale
Line 19: Line 18:
 
# HUB-NS outreach package (Dennis 10 min)
 
# HUB-NS outreach package (Dennis 10 min)
 
#* deferred to next meeting
 
#* deferred to next meeting
# West Keith Road, North Van Open House (Rob 10 min)
+
# West Keith Road/13th Street, North Van Open House
  +
#* Rob and Heather attended the open house held on 24 June
  +
#* A lengthy discussion ensued looking at the various options for pedestrians and cyclists on the web site(http://www.cnv.org/~/media/C63F9745879945FFB6204465B7EF4B9D.PDF)as well as paper copies
  +
#* There was overall agreement that there should be AAA facilities for cyclists in both the east and west directions.
  +
#* The option that came closest to this for the section from Marine Drive to Jones was Concept B1 - it was suggested however the configuation going west on the north side should be the same as on the south side.
  +
#* The option that came closest to this for the section from Mahon Ave. to chesterfield Ave. was Concept
 
# West Van cycling infrastructure update
 
# West Van cycling infrastructure update
 
#* Spirit Trail
 
#* Spirit Trail

Revision as of 14:44, 15 July 2015

  1. Attendance: Peter, Dianne, Devan, Nelson, Don M., Rob, Erika, Fiona, Amanda, Don P.
  2. Agenda approval/changes additions
  3. Minutes Review (Peter 2 min)
  4. North Shore Safe Routes Advocates (NSSRA) request for HUB funding (10 min)
    • will consider a contribution after finding our more info - Peter will check with Amanada
  5. Mountain Highway exchange update (Devan 15 min)
    • Devan and Antje who worked on a HUB letter were not preset to discuss this item m- Heather will circulate the draft HUB response letter to MoT for comment
  6. Car Free day August 22 (Heather 5 min)
    • on Lonsdale
    • lead a ride over back and forth over IWMB from points in Vancouver
    • we will set up a booth
    • we need to check with Colin about insurance
    • Dianne has the box of materials - get more supplies from HUB HQ
    • could survey people at booth about favourite routes or problems
    • laminate a enlarged version of the NS bike map - get pdf version of the map from the city of NV (from their website and get them to print it.
    • Don will coordinate with the city
  1. HUB-NS outreach package (Dennis 10 min)
    • deferred to next meeting
  2. West Keith Road/13th Street, North Van Open House
    • Rob and Heather attended the open house held on 24 June
    • A lengthy discussion ensued looking at the various options for pedestrians and cyclists on the web site(http://www.cnv.org/~/media/C63F9745879945FFB6204465B7EF4B9D.PDF)as well as paper copies
    • There was overall agreement that there should be AAA facilities for cyclists in both the east and west directions.
    • The option that came closest to this for the section from Marine Drive to Jones was Concept B1 - it was suggested however the configuation going west on the north side should be the same as on the south side.
    • The option that came closest to this for the section from Mahon Ave. to chesterfield Ave. was Concept
  3. West Van cycling infrastructure update
    • Spirit Trail
      • Eagleridge Community Centre, west side of Marine Drive past Eagleridge school to Exit 0 by the end of August.
      • improvement to Orchill Road section as well.
      • Consultant to propose a route from Exit 0, to top of Royal Avenue then to Horseshoe Bay followed by public consultation in September.
      • Plan being developed to extend Spirit Trail in Ambleside from 13th to 19th along Argyle - part of a waterfront plan to go to Council.
      • meeting later this month with Park Royal to see what their plans are for the Wardance Bridge.
      • Looking for possibilities to install sections of the Spirit Trail near or on Marine Drive between 25th St and Cranley Drive.
    • North end of the Lions Gate Bridge
      • Wayfinding signage still in planning and negotiating stage - could be installed in 3-4 weeks.
      • Trees have been cleared in a section of walkway on the south side of Marine Drive between Taylor Way and the Capilano Pacific Trail - could be improved for cyclists.
    • North side of highway 1 from Capilano River Bridge to 3rd Street may be done at the end of this fiscal year if funds are available if not, then in 2016.
    • Grosvenor Ambleside 1300 block redevelopment - no cycling facilities shown on Grosvenor website (http://grosvenorambleside.com/homes/architecture)despite surrounded by designated bike routes.
    • 1100 block Keith Road - sidewalk to be installed on south side this summer - may paint a bike lane on the north side if there is enough room.
    • John Calimente would like names and contact info of cyclists in West Van who may wish to comment on cycling infrastructure plans.
  4. Ironworkers Memorial Bridge - suggested improvements to exit onto Dollarton (10 min)
  5. Possible response to Transportation Plebiscite results (Peter 10 min)
  6. Plans for a group assessment ride along the Spirit Trail (Peter 10 min)
  7. Upcoming events including HUB picnic on 12 July (10 min)