Difference between revisions of "Meeting Summary: December 11, 2014"

From committees
Jump to navigation Jump to search
imported>Peter Scholefield
imported>Antje Wahl
 
(19 intermediate revisions by 2 users not shown)
Line 1: Line 1:
# Attendance: Peter, Fiona, Don (McPherson), Antje, Nelson, Heather, Devan, Don
+
# Attendance: Peter, Fiona, Don M., Antje, Nelson, Heather, Devan, Don P.
 
# Announcements:
 
# Announcements:
#* Antje on DNV transportation consultation committee
+
#* Antje on DNV transportation consultation committee for 2015-16; Nelson already on committee
#* Bike day in Canada 25 May (Fiona)
+
#* Bike Day in Canada 25 May (Fiona)
 
# HUB-Ministry of Transportation & Infrastructure meeting update (Antje)
 
# HUB-Ministry of Transportation & Infrastructure meeting update (Antje)
#* A 1 Dec meeting in Coquitlam recommended improved consultation with HUB and want a priority list from each Committee
+
#* A 1 Dec meeting at MoTI office in Coquitlam recommended improved consultation with HUB and want a priority list from each local committee
 
# North Shore priority improvement list for Ministry
 
# North Shore priority improvement list for Ministry
#* Based on the criteria of heavy usage by cyclists and safety concerns, it was decided the following projects should be given a higher priority:
+
#* priority criteria were discussed, decided to use safety concerns and cyclist usage (current and potential)
  +
#* Antje to send following list to yahoo group to ask for more input
 
#** Ironworkers Memorial Bridge access improvements, north side such as the following:
 
#** Ironworkers Memorial Bridge access improvements, north side such as the following:
#*** Widen & fence about 10m of Main on-ramp sidewalk east of croshttp://wiki.bikehub.ca/northshore/skins/common/images/button_bold.pngswalk to new path to Barrow St
+
#*** Widen & fence about 10m of Main on-ramp sidewalk east of crosswalk to new path to Barrow St
 
#*** Widen & fence Main on-ramp sidewalk to bridge
 
#*** Widen & fence Main on-ramp sidewalk to bridge
 
#*** Barrow St extension path underneath bridge to Dollarton Hwy
 
#*** Barrow St extension path underneath bridge to Dollarton Hwy
#** improve eastbound approach to the Lions Gate Bridge from Marine Drive and Taylor Way including fencing of the southbound sidewalk approach to Lions Gate Bridge, to prevent cyclists from falling into traffic
+
#** improve eastbound approach to the Lions Gate Bridge from Marine Drive at Taylor Way, including fencing of the southbound sidewalk approach to Lions Gate Bridge, to prevent cyclists from falling into traffic
#** Redesign Lillooet Rd/Mt Seymour Parkway intersection to include bike path crossings and shorten cyclist/pedestrian crossing times
+
#** redesign Lillooet Rd/Mt Seymour Parkway intersection to include bike path crossings and shorten cyclist/pedestrian crossing times
#** Bike lane on Fern St overpass between Keith extension and Mt Seymour Parkway
+
#** bike lane on Fern St overpass between Keith extension and Mt Seymour Parkway
#** safety improvements for cyclists on the Sea to Sky Highway as per report
+
#** safety improvements for cyclists on the Sea to Sky Highway as per cycling hazards report by SFU
 
#** Taylor Way bike lanes
 
#** Taylor Way bike lanes
#** Widen sidewalks on the Upper Levels Highway bridge over the Capilano River
+
#** widen sidewalks on the Upper Levels Highway bridge over the Capilano River
#* Other projects considered important but of a lesser priority are as follows:
 
 
#** Exit 0 in Horseshoe Bay for West Vancouver Spirit Trail
 
#** Exit 0 in Horseshoe Bay for West Vancouver Spirit Trail
 
#** West Vancouver Highway 1 Capilano River to 3rd Street, changes on north side shoulder to accommodate West Vancouver bike route
 
#** West Vancouver Highway 1 Capilano River to 3rd Street, changes on north side shoulder to accommodate West Vancouver bike route
 
#** construct a multi-purpose switch-back path from Keith Road to the south sidewalk on the Upper Levels Highway bridge over the Capilano River
 
#** construct a multi-purpose switch-back path from Keith Road to the south sidewalk on the Upper Levels Highway bridge over the Capilano River
 
#** improve bike route and wayfinding signage
 
#** improve bike route and wayfinding signage
 
#** improve eastbound off-ramp to Westview Drive
#** redesign cyclist use of the seabus with designated section
 
 
#** cyclist/pedestrian overpasses over Hwy 1 north of Mountain Highway at 14th St and at Casano-Loutet - municipal responsibility?
#** eastbound off-ramp to Westview Drive
 
 
# Lower Mountain Highway update (Devan)
#** cycling pedestrian overpasses over Hwy 1 north of Mountain Highway at 14th St and at Casano - Loutet further south
 
  +
#* west curb at Seylynn development is temporary
 
  +
#* widening on east side will be done piece by piece with redevelopment
# Lower mMuntain highway (Devan)
 
  +
#* bike route planned down Orwell
west side is temperaory
 
widening on east side will be done piece by piece
+
#* there will be a council vote on a piece by piece basis and opportunity for public input
 
# DNV OCP monitoring indicators for transportation targets (Antje)
bike route down Orwell with public input and vote on each piece basis
 
  +
#* need a breakdown specifically for cycling
-
 
  +
#* some factors to consider in measuring how the goals are met are as follows:
# DNV OCP monitoring indicators for transportation targets (all – 15min)#
 
  +
#** mode share;
how to mearure to meet the goals
 
mode share km of bike lanes and greenways and tranportation spending
+
#** km of bike lanes and greenways;
  +
#** transportation spending;
need a breakdown for cycling – how many gaps have been closed
+
#** how many gaps have been closed
counters are needed – none in DNV
 
% of bike network completed separated, signed bike lanes sharrows
+
#** % of bike network completed separated, signed bike lanes and sharrow lanes
safe route to schools including connections to bike outes
+
#** safe route to schools including connections to bike routes
 
#* counters are needed – none in DNV
would be good for all municipalities
+
#* these indicators would be good for all municipalities
New Mountain Highway interchange Devan
 
  +
#* Antje will send indicator suggestions to DNV
showed map of interchange with propsed bike routes in green
 
  +
# New Mountain Highway interchange (Devan)
briefed MLA thornthwaite on propoed cycling connections
 
 
#* showed map of interchange with proposed bike routes in green
Cindy Kurlach school trustee
 
  +
#* Devan and Antje met with MLA Thornthwaite who was briefed on the proposed cycling connections
matthew Bond was there
 
  +
#* Thornthwaite invited DNV mayor, councillors and school trustees to meeting; councillor Mathew Bond and school trustee Cyndi Gerlach attended
we asked to be involved in the planning
 
 
#* Antje will follow-up with MoTI/DNV
sign off on the plans
 
  +
# 3rd St Highway 1 access in West Van
we would like to MoT staff but not yet sent to DNV
 
 
#* Joel got an email from Ray Fung saying that DWV had a meeting with residents and decided not to proceed
we need to get DNV to arrange this
 
Antje will follow-up with Bond
+
#* Peter will follow up with John Calimente
 
# Chesterfield Avenue update (Heather)
 
  +
#* a letter has been sent about bike lane design at the traffic circle at Keith Road intersection
3rd st highway access
 
 
#* the City will bring a plan to us in the new year
DWV had a mtg with residents and decided not to proceed
 
  +
# Stanley Park Causeway
joel
 
  +
#* compromise plan well received
me to follow up with ray
 
  +
#* this planning process should be used as a model for future infrastructure plans
Chesterfield - Heather
 
letter about traffic circle at keith
 
they will bring a plan to us in the new year
 
 
Causeway
 
use the design as a model for future dent
 
 
 
 
 
 
 
 
 
# DNV OCP monitoring indicators for transportation targets (all - 15min)
 

Latest revision as of 00:36, 6 January 2015

  1. Attendance: Peter, Fiona, Don M., Antje, Nelson, Heather, Devan, Don P.
  2. Announcements:
    • Antje on DNV transportation consultation committee for 2015-16; Nelson already on committee
    • Bike Day in Canada 25 May (Fiona)
  3. HUB-Ministry of Transportation & Infrastructure meeting update (Antje)
    • A 1 Dec meeting at MoTI office in Coquitlam recommended improved consultation with HUB and want a priority list from each local committee
  4. North Shore priority improvement list for Ministry
    • priority criteria were discussed, decided to use safety concerns and cyclist usage (current and potential)
    • Antje to send following list to yahoo group to ask for more input
      • Ironworkers Memorial Bridge access improvements, north side such as the following:
        • Widen & fence about 10m of Main on-ramp sidewalk east of crosswalk to new path to Barrow St
        • Widen & fence Main on-ramp sidewalk to bridge
        • Barrow St extension path underneath bridge to Dollarton Hwy
      • improve eastbound approach to the Lions Gate Bridge from Marine Drive at Taylor Way, including fencing of the southbound sidewalk approach to Lions Gate Bridge, to prevent cyclists from falling into traffic
      • redesign Lillooet Rd/Mt Seymour Parkway intersection to include bike path crossings and shorten cyclist/pedestrian crossing times
      • bike lane on Fern St overpass between Keith extension and Mt Seymour Parkway
      • safety improvements for cyclists on the Sea to Sky Highway as per cycling hazards report by SFU
      • Taylor Way bike lanes
      • widen sidewalks on the Upper Levels Highway bridge over the Capilano River
      • Exit 0 in Horseshoe Bay for West Vancouver Spirit Trail
      • West Vancouver Highway 1 Capilano River to 3rd Street, changes on north side shoulder to accommodate West Vancouver bike route
      • construct a multi-purpose switch-back path from Keith Road to the south sidewalk on the Upper Levels Highway bridge over the Capilano River
      • improve bike route and wayfinding signage
      • improve eastbound off-ramp to Westview Drive
      • cyclist/pedestrian overpasses over Hwy 1 north of Mountain Highway at 14th St and at Casano-Loutet - municipal responsibility?
  5. Lower Mountain Highway update (Devan)
    • west curb at Seylynn development is temporary
    • widening on east side will be done piece by piece with redevelopment
    • bike route planned down Orwell
    • there will be a council vote on a piece by piece basis and opportunity for public input
  6. DNV OCP monitoring indicators for transportation targets (Antje)
    • need a breakdown specifically for cycling
    • some factors to consider in measuring how the goals are met are as follows:
      • mode share;
      • km of bike lanes and greenways;
      • transportation spending;
      • how many gaps have been closed
      • % of bike network completed separated, signed bike lanes and sharrow lanes
      • safe route to schools including connections to bike routes
    • counters are needed – none in DNV
    • these indicators would be good for all municipalities
    • Antje will send indicator suggestions to DNV
  7. New Mountain Highway interchange (Devan)
    • showed map of interchange with proposed bike routes in green
    • Devan and Antje met with MLA Thornthwaite who was briefed on the proposed cycling connections
    • Thornthwaite invited DNV mayor, councillors and school trustees to meeting; councillor Mathew Bond and school trustee Cyndi Gerlach attended
    • Antje will follow-up with MoTI/DNV
  8. 3rd St Highway 1 access in West Van
    • Joel got an email from Ray Fung saying that DWV had a meeting with residents and decided not to proceed
    • Peter will follow up with John Calimente
  9. Chesterfield Avenue update (Heather)
    • a letter has been sent about bike lane design at the traffic circle at Keith Road intersection
    • the City will bring a plan to us in the new year
  10. Stanley Park Causeway
    • compromise plan well received
    • this planning process should be used as a model for future infrastructure plans