Difference between revisions of "Meeting Agenda: Sep 14, 2017"

From committees
Jump to navigation Jump to search
imported>Antje Wahl
imported>Antje Wahl
Line 7: Line 7:
   
 
'''City of North Vancouver'''
 
'''City of North Vancouver'''
*300 block West Esplanade Bike Lane
+
*300 block West Esplanade bike lane
 
*2nd Street - Developments and bike space follow up
 
*2nd Street - Developments and bike space follow up
 
*Construction is under way on Keith Road west and the 21st St section of the Green Necklace – Tony will enquire about the status of cycling facilities for these two projects.
 
*Construction is under way on Keith Road west and the 21st St section of the Green Necklace – Tony will enquire about the status of cycling facilities for these two projects.
Line 17: Line 17:
 
'''District of North Vancouver'''
 
'''District of North Vancouver'''
 
*Pilot bike lane on Highland Blvd
 
*Pilot bike lane on Highland Blvd
*Lynn Valley Road - follow Up
+
*Lynn Valley Road - follow up
 
*Series of Letters:
 
*Series of Letters:
 
**1. Spirit trail / MUP designs (baffle at Pemberton/Spirit Trail, bollards and shared crossings. We can start with the DNV and perhaps later send similar letters to CNV and DWV)
 
**1. Spirit trail / MUP designs (baffle at Pemberton/Spirit Trail, bollards and shared crossings. We can start with the DNV and perhaps later send similar letters to CNV and DWV)

Revision as of 11:56, 30 August 2017

The HUB North Shore Committee holds regular meetings at 6:30pm - 8:30pm on the second Thursday of every month. Everybody is welcome. The meetings are at the North Vancouver City Library (14th/Lonsdale) in the Don Preston Boardroom (2nd floor).

City of North Vancouver

  • 300 block West Esplanade bike lane
  • 2nd Street - Developments and bike space follow up
  • Construction is under way on Keith Road west and the 21st St section of the Green Necklace – Tony will enquire about the status of cycling facilities for these two projects.

Ministry of Transportation and Infrastructure

  • Lower Lynn Interchanges project update
  • Meeting with MLA Bowinn Ma

District of North Vancouver

  • Pilot bike lane on Highland Blvd
  • Lynn Valley Road - follow up
  • Series of Letters:
    • 1. Spirit trail / MUP designs (baffle at Pemberton/Spirit Trail, bollards and shared crossings. We can start with the DNV and perhaps later send similar letters to CNV and DWV)
    • 2. Proposed new DNV Policy - new construction = new infrastructure (Examples: Queens Rd new Rec Centre / Dollarton Hwy new condo development / Pemberton Ave repaving)
    • 3. Maplewood Plan

District of West Vancouver

  • Wardance Bridge Work
  • Eagle Harbour Dropoff Area

Other Letters or Actions Required

  • Spirit Trail baffles at Pemberton and Welch – need a video of a family with a bike trailer.