Difference between revisions of "Meeting Agenda: December 11, 2014"

From committees
Jump to navigation Jump to search
imported>Heather Drugge
imported>Heather Drugge
Line 20: Line 20:
 
#* safety improvements for cyclists on the Sea to Sky Highway
 
#* safety improvements for cyclists on the Sea to Sky Highway
 
#* improve bike route and wayfinding signage
 
#* improve bike route and wayfinding signage
#* cycling pedestrian overpasses over hwy 1 north of Mountain Highway at 14th St and at Casano -Loutet further south
+
#* cycling pedestrian overpasses over hwy 1 north of Mountain Highway at 14th St and at either Casano or Loutet further south
 
#* redesign cyclist use of the seabus with designated section
 
#* redesign cyclist use of the seabus with designated section
   

Revision as of 18:53, 11 December 2014

The HUB North Shore Committee holds regular meetings at 6:30pm - 8:30pm on the second Thursday of every month. Everybody is welcome. The meetings are at the North Vancouver City Library (14th/Lonsdale) in the Don Preston Boardroom (2nd floor).

  1. Attendance and introductions
  2. Agenda approval/changes additions
  3. HUB-Ministry of Transportation & Infrastructure meeting update (Antje - 5min)
  4. North Shore priority improvement list for Ministry (all - 45min)
    • Ironworkers Memorial Bridge access improvements, north side
      • Widen & fence about 10m of Main on-ramp sidewalk east of crosswalk to new path to Barrow St
      • Widen & fence Main on-ramp sidewalk to bridge
      • Barrow St extension path underneath bridge to Dollarton Hwy
    • Redesign Lillooet Rd/Mt Seymour Parkway intersection to include bike path crossings and shorten cyclist/pedestrian crossing times
    • Bike lane on Fern St overpass between Keith extension and Mt Seymour Parkway
    • Taylor Way bike lanes
    • Exit 0 in Horseshoe Bay for West Vancouver Spirit Trail
    • West Vancouver Highway 1 Capilano River to 3rd Street, changes on north side shoulder to accommodate West Vancouver bike route
    • Fencing of southbound sidewalk approach to Lions Gate Bridge, to prevent cyclists from falling into traffic
    • improve eastbound approach to the Lions Gate Bridge from Marine Drive and Taylor Way
    • widen sidewalks on the Upper Levels Highway bridge over the Capilano River
    • construct a multi-purpose switch-back path from Keith Road to the south sidewalk on the Upper Levels Highway bridge over the Capilano River
    • safety improvements for cyclists on the Sea to Sky Highway
    • improve bike route and wayfinding signage
    • cycling pedestrian overpasses over hwy 1 north of Mountain Highway at 14th St and at either Casano or Loutet further south
    • redesign cyclist use of the seabus with designated section
  1. DNV OCP monitoring indicators for transportation targets (all - 15min)
  1. Lower Mountain Highway streetscape (Devan - 10min)
  2. New Mountain Highway Interchange update (Devan, Antje - 5min)
  3. 3rd Street highway access (Peter/Antje - 5min)
  4. Chesterfield NB protected bike lane update (Heather - 5min)
  5. Stanley Park Causeway (5min)
  6. BikeMaps mapping of cycling trouble spots (all - 5min)
  7. New municipal councils (all - 5min)