Difference between revisions of "Meeting Agenda: December 11, 2014"

From committees
Jump to navigation Jump to search
imported>Antje Wahl
imported>Peter Scholefield
Line 15: Line 15:
 
#* West Vancouver Highway 1 Capilano River to 3rd Street, changes on north side shoulder to accommodate West Vancouver bike route
 
#* West Vancouver Highway 1 Capilano River to 3rd Street, changes on north side shoulder to accommodate West Vancouver bike route
 
#* Fencing of southbound sidewalk approach to Lions Gate Bridge, to prevent cyclists from falling into traffic
 
#* Fencing of southbound sidewalk approach to Lions Gate Bridge, to prevent cyclists from falling into traffic
  +
#* improve eastbound approach to the Lions Gate Bridge from Marine Drive and Taylor Way
#* ...
 
  +
#* widen sidewalks on the Upper Levels Highway bridge over the Capilano River
  +
#* construct a multi-purpose switch-back path from Keith Road to the south sidewalk on the Upper Levels Highway bridge over the Capilano River
  +
#* safety improvements for cyclists on the Sea to Sky Highway
  +
#* improved bike route and wayfinding signage
 
#*...
 
# Stanley Park Causeway (5min)
 
# Stanley Park Causeway (5min)
 
# New Mountain Highway Interchange update (Devan, Antje - 10min)
 
# New Mountain Highway Interchange update (Devan, Antje - 10min)

Revision as of 13:18, 7 December 2014

The HUB North Shore Committee holds regular meetings at 6:30pm - 8:30pm on the second Thursday of every month. Everybody is welcome. The meetings are at the North Vancouver City Library (14th/Lonsdale) in the Don Preston Boardroom (2nd floor).

  1. Attendance and introductions
  2. Agenda approval/changes additions
  3. HUB-Ministry of Transportation & Infrastructure meeting update (Antje - 5min)
  4. North Shore priority improvement list for Ministry (all - 45min)
    • Ironworkers Memorial Bridge access improvements, north side
      • Widen & fence about 10m of Main on-ramp sidewalk east of crosswalk to new path to Barrow St
      • Widen & fence Main on-ramp sidewalk to bridge
      • Barrow St extension path underneath bridge to Dollarton Hwy
    • Redesign Lillooet Rd/Mt Seymour Parkway intersection to include bike path crossings and shorten cyclist/pedestrian crossing times
    • Bike lane on Fern St overpass between Keith extension and Mt Seymour Parkway
    • Taylor Way bike lanes
    • Exit 0 in Horseshoe Bay for West Vancouver Spirit Trail
    • West Vancouver Highway 1 Capilano River to 3rd Street, changes on north side shoulder to accommodate West Vancouver bike route
    • Fencing of southbound sidewalk approach to Lions Gate Bridge, to prevent cyclists from falling into traffic
    • improve eastbound approach to the Lions Gate Bridge from Marine Drive and Taylor Way
    • widen sidewalks on the Upper Levels Highway bridge over the Capilano River
    • construct a multi-purpose switch-back path from Keith Road to the south sidewalk on the Upper Levels Highway bridge over the Capilano River
    • safety improvements for cyclists on the Sea to Sky Highway
    • improved bike route and wayfinding signage
    • ...
  5. Stanley Park Causeway (5min)
  6. New Mountain Highway Interchange update (Devan, Antje - 10min)
  7. Chesterfield NB protected bike lane update (Heather - 5min)
  8. BikeMaps mapping of cycling trouble spots (all - 5min)
  9. New municipal councils (all - 5min)