Difference between revisions of "HUB Tri-Cities Successes"
Jump to navigation
Jump to search
Line 4: | Line 4: | ||
This list is only partial. |
This list is only partial. |
||
− | King Albert Greenway from Porter Street to Hillcrest Street, connecting to the existing greenway from Porter Street to Blue Mountain Street, 2020 |
+ | *King Albert Greenway from Porter Street to Hillcrest Street, connecting to the existing greenway from Porter Street to Blue Mountain Street, 2020 |
− | Multi-use path built on Gatensbury Road linking Port Moody and Coquitlam and connecting schools, downtown Port Moody, a Skytrain station and the West Coast Express (2019 Infrastructure Improvement Award) |
+ | *Multi-use path built on Gatensbury Road linking Port Moody and Coquitlam and connecting schools, downtown Port Moody, a Skytrain station and the West Coast Express (2019 Infrastructure Improvement Award) |
− | Riverview multi-use path connects Colony Farm in the south with Coquitlam Centre in the north (2019) |
+ | *Riverview multi-use path connects Colony Farm in the south with Coquitlam Centre in the north (2019) |
− | Heritage Mountain extension completed with separated bicycle facilities from Turner Creek Drive to David Avenue (2019) |
+ | *Heritage Mountain extension completed with separated bicycle facilities from Turner Creek Drive to David Avenue (2019) |
− | Murray Street multi-use path extension completed from Electronic Avenue to Hugh Street (2019) |
+ | *Murray Street multi-use path extension completed from Electronic Avenue to Hugh Street (2019) |
− | Sheep Paddocks Trail reopened, connecting Pitt River Road to Colony Farm (2019) |
+ | *Sheep Paddocks Trail reopened, connecting Pitt River Road to Colony Farm (2019) |
− | New access ramp connecting bike facilities on the Moody Street Overpass to the Moody Centre SkyTrain station (2019) |
+ | *New access ramp connecting bike facilities on the Moody Street Overpass to the Moody Centre SkyTrain station (2019) |
− | Dogwood Fairview Citywide Greenway multi-use path built connecting Burquitlam and Lougheed neighbourhoods (2018) |
+ | *Dogwood Fairview Citywide Greenway multi-use path built connecting Burquitlam and Lougheed neighbourhoods (2018) |
− | Murray overpass, Port Moody (Ped/bike overpass to Rocky Point, completed March 2014) |
+ | *Murray overpass, Port Moody (Ped/bike overpass to Rocky Point, completed March 2014) |
− | United Boulevard from New West to King Edward (Sept 2013). MUP plus on road bike lanes. |
+ | *United Boulevard from New West to King Edward (Sept 2013). MUP plus on road bike lanes. |
− | Lougheed bike lanes PMH1 (King Edward to Colony farms, completed August 2013) |
+ | *Lougheed bike lanes PMH1 (King Edward to Colony farms, completed August 2013) |
− | Regan Grover temporary MUP in Como Lake park (spring 2013). This is a temporary fix pending the creation the proposed Regan/Grover on-road bike route. |
+ | *Regan Grover temporary MUP in Como Lake park (spring 2013). This is a temporary fix pending the creation the proposed Regan/Grover on-road bike route. |
− | Guildford extension in Port Moody (fall 2012) |
+ | *Guildford extension in Port Moody (fall 2012) |
− | Murray Avenue bike lane and MUP (fall 2012) |
+ | *Murray Avenue bike lane and MUP (fall 2012) |
− | Broadway bike lanes, Port Coquitlam (2012) |
+ | *Broadway bike lanes, Port Coquitlam (2012) |
− | King Edward overpass bike lanes and MUP, Coquitlam (2012) |
+ | *King Edward overpass bike lanes and MUP, Coquitlam (2012) |
− | Poirier MUP, Coquitlam (2012) |
+ | *Poirier MUP, Coquitlam (2012) |
− | David Avenue extension to Port Moody (2012) |
+ | *David Avenue extension to Port Moody (2012) |
− | PoCo trail pedestrian signal at Shaughnessy (fall 2012) |
+ | *PoCo trail pedestrian signal at Shaughnessy (fall 2012) |
Revision as of 23:08, 7 June 2021
Return to Tri-Cities Committee Wiki
This list is only partial.
- King Albert Greenway from Porter Street to Hillcrest Street, connecting to the existing greenway from Porter Street to Blue Mountain Street, 2020
- Multi-use path built on Gatensbury Road linking Port Moody and Coquitlam and connecting schools, downtown Port Moody, a Skytrain station and the West Coast Express (2019 Infrastructure Improvement Award)
- Riverview multi-use path connects Colony Farm in the south with Coquitlam Centre in the north (2019)
- Heritage Mountain extension completed with separated bicycle facilities from Turner Creek Drive to David Avenue (2019)
- Murray Street multi-use path extension completed from Electronic Avenue to Hugh Street (2019)
- Sheep Paddocks Trail reopened, connecting Pitt River Road to Colony Farm (2019)
- New access ramp connecting bike facilities on the Moody Street Overpass to the Moody Centre SkyTrain station (2019)
- Dogwood Fairview Citywide Greenway multi-use path built connecting Burquitlam and Lougheed neighbourhoods (2018)
- Murray overpass, Port Moody (Ped/bike overpass to Rocky Point, completed March 2014)
- United Boulevard from New West to King Edward (Sept 2013). MUP plus on road bike lanes.
- Lougheed bike lanes PMH1 (King Edward to Colony farms, completed August 2013)
- Regan Grover temporary MUP in Como Lake park (spring 2013). This is a temporary fix pending the creation the proposed Regan/Grover on-road bike route.
- Guildford extension in Port Moody (fall 2012)
- Murray Avenue bike lane and MUP (fall 2012)
- Broadway bike lanes, Port Coquitlam (2012)
- King Edward overpass bike lanes and MUP, Coquitlam (2012)
- Poirier MUP, Coquitlam (2012)
- David Avenue extension to Port Moody (2012)
- PoCo trail pedestrian signal at Shaughnessy (fall 2012)