Difference between revisions of "HUB Tri-Cities Successes"

From committees
Jump to navigation Jump to search
Line 48: Line 48:
 
*Regan Grover interim improvement at Como Lake park, Coquitlam (spring 2013)
 
*Regan Grover interim improvement at Como Lake park, Coquitlam (spring 2013)
   
*Guildford Way Protected Bike Lanes, Ioco Road to Coquitlam Border, Port Moody (2012)
+
*Guildford Way Bike Lanes, Ioco Road to Coquitlam Border, Port Moody (2012)
   
 
*Murray Avenue bike lane and MUP, Ioco Road to Electronic Avenue, Port Moody (fall 2012)
 
*Murray Avenue bike lane and MUP, Ioco Road to Electronic Avenue, Port Moody (fall 2012)

Revision as of 23:49, 9 February 2024

Return to Tri-Cities Committee Wiki


This list is only partial.

  • Maze gate removal, Coquitlam, Belcarra Regional Park, and Port Coquitlam (Ongoing)
  • Gatensbury multi-use pathway, Regan Ave to Port Moody, Coquitlam (2023)
  • Lougheed Highway multi-use pathway, north side, Pinetree Way to Westwood St, Coquitlam (2023)
  • Guildford Greenway, Phase 1 - Johnson to Port Moody, Coquitlam (2023)
  • Sumiqwuelu (formerly Riverview) wayfinding signage & chain removal from pathway, Coquitlam (2023)
  • Lougheed Highway multi-use pathway, south side, between Barnet Highway and Christmas Way, Coquitlam (2023)
  • United Boulevard multi-use pathway, King Edward St intersection to 15 King Edward St, Coquitlam (2023)
  • Prairie Avenue multi-use pathway between Coast Meridian Road and Burns Road, Port Coquitlam (2022)
  • King Albert Greenway multi-use pathway from Blue Mountain Street to Hillcrest Street, Coquitlam (2021)
  • Bike parking minimums, Coquitlam (2021)
  • Lougheed Highway multi-use pathway, south side, between Christmas Way and Westwood St, Coquitlam (2020)
  • Gatensbury Road multi-use pathway, Coquitlam border to Henry St, Port Moody (2019 Infrastructure Improvement Award)
  • Lougheed Greenway multi-use pathway, ~Palm Terrace to Coquitlam Central Station, Coquitlam (2019)
  • Heritage Mountain painted bike lanes from Turner Creek Drive to Ioco Road, Port Moody (2019)
  • Murray Street protected bike lane extension from Electronic Avenue to Moody St, Port Moody (2019)
  • Sheep Paddocks Trail reopened, connecting Pitt River Road to Colony Farm, Coquitlam (2019)
  • New access ramp connecting bike facilities on the Moody Street Overpass to the Moody Centre SkyTrain station, Port Moody (2019)
  • Dogwood-Fairview on-street bikeway, Morrison Avenue to Brookmere Avenue, Coquitlam (2018)
  • Murray overpass multi-use pathway, Port Moody (March 2014)
  • United Boulevard multi-use pathway from 15D United Blvd to King Edward, Coquitlam (Sept 2013).
  • Lougheed bike lanes, King Edward to Colony farms, Coquitlam (August 2013)
  • Regan Grover interim improvement at Como Lake park, Coquitlam (spring 2013)
  • Guildford Way Bike Lanes, Ioco Road to Coquitlam Border, Port Moody (2012)
  • Murray Avenue bike lane and MUP, Ioco Road to Electronic Avenue, Port Moody (fall 2012)
  • Broadway bike lanes, Kingsway Avenue to Mary Hill Bypass, Port Coquitlam (2012)
  • King Edward overpass bike lanes and MUP, Coquitlam (2012)
  • Poirier Street multi-use pathway, Regan Avenue to King Albert Avenue, Coquitlam (2012)
  • David Avenue extension, Noons Creek Drive to Pinetree Way, Coquitlam(2012)
  • PoCo trail pedestrian signal at Shaughnessy (fall 2012)