===General===
 
* Change meeting time to 1st of the Month
 
* Change meeting time to 1st of the Month
* HUB 2020 Infrastructure award
+
* HUB 2020 Infrastructure award submission
 
** West 1st/2nd
 
** West 1st/2nd
  +
** East 29th
 
   
 
<!--
 
<!--
Line 28: Line 28:
 
** We will attend a future meeting once things calm down.
 
** We will attend a future meeting once things calm down.
 
-->
 
-->
 
   
 
===Goals & Objectives ===
 
===Goals & Objectives ===
Line 38: Line 37:
 
*** Set-up meeting with West Van Chamber of Commerce & Ambleside Dundarave BIA - On Hold
 
*** Set-up meeting with West Van Chamber of Commerce & Ambleside Dundarave BIA - On Hold
 
*** "Create a "hot spot" tracking list encompassing the North Shore municipalities "
 
*** "Create a "hot spot" tracking list encompassing the North Shore municipalities "
  +
*** Focus on HUB NS priorities list.
  +
*** https://docs.google.com/spreadsheets/d/1DEiIGg9CasQ2-vH9Ak0NME2cBMs3ltTvpWZbNnN4q0o/htmlview#gid=0
   
   
Line 56: Line 57:
   
 
===City of North Vancouver - Erika/Heather===
 
===City of North Vancouver - Erika/Heather===
*'''Esplanade Update'''
 
[[File:Esplanade Planter Boxes.png]]
 
**New planters between Esplanade and Rogers better define bike path from pedestrian path
 
**Community engagement has ended. Detailed design in winter and more engagement winter-spring 2021 Construction to begin in summer/fall 2021
 
 
 
  +
*'''Staff Bike Around'''
  +
**We had a bike around with 2 members of staff on Dec 17th: Chesterfield, East 4th/3rd, Queensbury, East and West Keith, 2nd/1st St, Mackay MUP, Larson and Jones.
  +
**Showed the good, the bad and the ugly! Praised them re: 1st St.
  +
 
*'''1st Street'''
 
*'''1st Street'''
  +
**Staff ride-around on Dec 17 included this segment. Paint and stencils are forthcoming (spring).
**This project is almost complete
 
**Spoke to staff about the need for improved traffic management during construction
 
 
**Let us know how this project is working for you
 
**Let us know how this project is working for you
   
 
*'''East Keith'''
 
*'''East Keith'''
 
** Staff are conducting a safety study on [East Keith from Sutherland down to Brooksbank]https://letstalk.cnv.org/cloverley-neighbourhood-traffic-safety-improvements
 
** Staff are conducting a safety study on [East Keith from Sutherland down to Brooksbank]https://letstalk.cnv.org/cloverley-neighbourhood-traffic-safety-improvements
  +
**Sent letter to CNV staff re: pinch point at Heywood and the downhill bike lane. Response: consultant providing a review of delineator installations. They'll get back to us. They're actively installing delineators in the city.
**This would be worth participating in given the pinch point at Heywood and the downhill bike lane. We spoke with staff about this prior to the opening of the new left-turn lane access to HWY 1, asking them to implement separators where the dotted line invites cars into the bike lane. At that time they said lets wait until we see what happens with the new turn lanes. Since the opening we have observed no difference in behavior. I have inquired again, but no answer - could be they are waiting for the survey results. We have an official HUB letter ready to go, but not sure that is the best way to approach.
 
   
  +
*'''Grand Blvd'''
  +
**Posts installed at intersections to make the previously north-bound car lane on W Grand a bicycle lane
   
*'''Staff Bike Around'''
+
*'''Ridgeway'''
  +
**As part of schoolchildren safety measure, 30 km/h zone has been extended, with signs installed.
**We have a scheduled bike around with staff on Dec 17th
 
  +
 
*'''Esplanade Update'''
 
**Community engagement has ended. Detailed design in winter and more engagement winter-spring 2021 Construction to begin in summer/fall 2021
   
 
*'''City Priority Routes'''
 
*'''City Priority Routes'''
Line 102: Line 107:
 
** Upper LV Road (Phase I) from TC to Peters Road in 2021. Peters to Dempsey planned for 2022 but may be included in Phase I.
 
** Upper LV Road (Phase I) from TC to Peters Road in 2021. Peters to Dempsey planned for 2022 but may be included in Phase I.
 
** Upper LVR improvements contingent on obtaining third party infrastructure funding. Assuming funding is successful it means the "DNV will be spending 50% of the transportation budget on active transportation according to Mayor Little."
 
** Upper LVR improvements contingent on obtaining third party infrastructure funding. Assuming funding is successful it means the "DNV will be spending 50% of the transportation budget on active transportation according to Mayor Little."
  +
** Meeting with Ingrid on January 19 to go over HUB priorities.
* also budget for missing Wayfinding signage
 
  +
** Meeting with Ingrid January 26 on upper Lynn Valley Rd. uphill protected bike path currently in the design stage.
 
* also ask about budget for missing Wayfinding signage
   
 
*Other
 
*Other
Line 110: Line 117:
   
 
===District of West Vancouver - Paul/Peter/Mike===
 
===District of West Vancouver - Paul/Peter/Mike===
* Royal Avenue in Horseshoe Bay - https://westvancouver.ca/sites/default/files/dwv/assets/transport-raods/docs/major-projects/horseshoe-bay-streetscape/190819HSBStreetscapeDisplayBoards.pdf
+
* Separated bike lane on Royal Avenue in Horseshoe Bay - https://westvancouver.ca/sites/default/files/dwv/assets/transport-raods/docs/major-projects/horseshoe-bay-streetscape/190819HSBStreetscapeDisplayBoards.pdf
* Meeting with the new director of Transportation and Engineering Services on 30 November - http://wiki.bikehub.ca/northshore/images/c/ca/2020-12-08_email_to_Ms_Jenn_Moller_re_30_November_meeting.pdf
+
**http://wiki.bikehub.ca/northshore/images/c/c6/Message_from_a_concerned_citizen_2020-12-08.pdf
* Painted bike lane at 23rd and Bellevue- http://wiki.bikehub.ca/northshore/images/8/8a/2020-12-04_23rd_and_Bellevue_looking_east_IMG_3158.JPG
+
**http://wiki.bikehub.ca/northshore/images/2/26/Uni-directional_bike_lane_guidelines.pdf
  +
**http://wiki.bikehub.ca/northshore/images/f/f6/Royal_Ave_-_2_cars_parked_on_roll_curb_with_measurements_2021-01-13_IMG_3268.jpg
* Parking at the new Grosvenor development and nearby - http://wiki.bikehub.ca/northshore/images/4/42/2020-12-08_parking_places_at_Grosvenor_and_vicinity.pdf.pdf - http://wiki.bikehub.ca/northshore/images/7/71/2004-03-20_parking_in_the_vicinity_of_1300_block_Bellevue.jpg
 
  +
**http://wiki.bikehub.ca/northshore/images/e/e9/Royal_Ave_-_wider_bike_lane_with_measurerments_2021-01-13_IMG_3270.jpg
* Possible Ciclovia in 2021
 
  +
* Meeting with West Vancouver police department on 7 January.
* 20 in 20 challenge results.
 
  +
* Meeting with DWV councillors.
* Proposed meeting with West Vancouver Police Department.
 
* Capilano Pacific Trail through Klee Wyck to Keith Road.
 
* Snow clearing on bike routes: West Vancouver Snow Clearing Policy. Two agencies responsible for clearing bike network: (1) roads are responsibility of DWV Engineering: call Dustin Bergstrom (604 925 7200 – service requests). Clearing follows a 3-stage prioritized program, see: https://westvancouver.ca/home-building-property/emergency-preparedness/what-to-do/winter . Roads are ploughed curb to curb as frequently as necessary subject to crew and equipment availability. (2) MUPs such as Spirit Trail and Hugo Ray Connector are responsibility of Parks Dept; call Dan Heninger (604 925 7137). Clearing of MUPs (usually within 24h) follows priorities given to car parks, and municipal buildings. Multiple clearings as necessary.
 
   
 
=== MOTI - Antje/Don===
 
=== MOTI - Antje/Don===
 
*Lower Lynn - Monthly meeting
 
*Lower Lynn - Monthly meeting
  +
** Mountain Hwy Interchange
** Phase 3 - Construction around Main St and the Ironworkers bridgehead
 
  +
*** HUB feedback to action items from active transportation safety audit - most items are good, but the consultant missed a few issues
*** Main south side path closed for Oct into Nov - most detour improvements that we requested have been done
 
  +
*** 4m MUP along westbound Mtn Hwy offramp problematic as shown in design - to discuss in our next meeting
***Bridge west sidewalk closed all winter into spring
 
*** Phibbs Exchange work to start in spring
 
   
 
* BC Economic Recovery funding - for MoTI
 
* BC Economic Recovery funding - for MoTI
 
** started in Nov, must be spend by March!
 
** started in Nov, must be spend by March!
  +
** HUB provided feedback to design team (Parsons) on early design of Lynn Valley Rd underpass and Capilano Rd interchange
 
** 3 North Shore Projects:
 
** 3 North Shore Projects:
 
*** ''Lynn Valley Rd Underpass'' - Design only (ready to put out to tender) - currently early draft
 
*** ''Lynn Valley Rd Underpass'' - Design only (ready to put out to tender) - currently early draft
Line 145: Line 150:
 
*Hwy 1 North Shore Corridor Study Lynn Valley to Horseshoe Bay
 
*Hwy 1 North Shore Corridor Study Lynn Valley to Horseshoe Bay
 
** Still waiting for draft report
 
** Still waiting for draft report
 
*Taylor Way interchange
 
**Several issues raised by West Van resident
 
   
 
===Communications & Outreach - Heather/Antje/Giacomo/Paul===
 
===Communications & Outreach - Heather/Antje/Giacomo/Paul===
  +
*We are working on a communications plan
*Go by Bike Campaign Update
 
*Instagram account
 
**We may use HUB HQ's account instead to post North Shore images
 
**On hold since we need a collection of images first
 
*Build photo library of utility cycling on the North Shore that can be used for social media, communications and provided to the media (e.g. North Shore News)
 
 
   
   
Line 195: Line 192:
 
<!--
 
<!--
 
===Translink - Antje/Erika===
 
===Translink - Antje/Erika===
  +
* no updates
* Phibbs Exchange design:
 
** TransLink& MoTI agreed to removed bollards and cyclist must dismount signage.
 
** The pathway will be tight though the exchange
 
** Brave cyclists have option to use 1.5m unprotected bike lane on WB on Main between traffic and bus pull-outs.
 
** They will have some bike boxes and are looking into how to do per-use payments (vs monthly)
 
** Asked them to talk to DNV about space for future bike-share
 
 
-->
 
-->

Latest revision as of 19:27, 14 January 2021

Starting in February 2021 HUB North Shore Committee regular meetings will change to the first Thursday of every month, still at at 6:30pm - 8:30pm. Everybody is welcome. Online conference call at https://join.me/HUBCyclingLC You can also phone in (audio only) at +1.778.654.8779,,859-185-641 #

  • Agenda additions
  • Introductions

General

  • Change meeting time to 1st of the Month
  • HUB 2020 Infrastructure award submission
    • West 1st/2nd


Goals & Objectives



City of North Vancouver - Erika/Heather

  • Staff Bike Around
    • We had a bike around with 2 members of staff on Dec 17th: Chesterfield, East 4th/3rd, Queensbury, East and West Keith, 2nd/1st St, Mackay MUP, Larson and Jones.
    • Showed the good, the bad and the ugly! Praised them re: 1st St.
  • 1st Street
    • Staff ride-around on Dec 17 included this segment. Paint and stencils are forthcoming (spring).
    • Let us know how this project is working for you
  • East Keith
    • Staff are conducting a safety study on [East Keith from Sutherland down to Brooksbank]https://letstalk.cnv.org/cloverley-neighbourhood-traffic-safety-improvements
    • Sent letter to CNV staff re: pinch point at Heywood and the downhill bike lane. Response: consultant providing a review of delineator installations. They'll get back to us. They're actively installing delineators in the city.
  • Grand Blvd
    • Posts installed at intersections to make the previously north-bound car lane on W Grand a bicycle lane
  • Ridgeway
    • As part of schoolchildren safety measure, 30 km/h zone has been extended, with signs installed.
  • Esplanade Update
    • Community engagement has ended. Detailed design in winter and more engagement winter-spring 2021 Construction to begin in summer/fall 2021
  • City Priority Routes
    • Phase 1
      • 1st Street (almost complete)
      • Casano-Loutet overpass (construction starts in Jan)
      • Jones
    • Phase 2
      • Esplanade (public consultation)
      • Midtown Connector to Casano Loutet bridge - 13th to Boulevard then up to 17th?
      • Upper Levels Greenway East
    • Phase 3
      • St. Davids
      • Chesterfield 13th down
      • Upper Levels Greenway West
  • ITC - Dana & Jonathan

District of North Vancouver - Sibylle/Fred

  • 2021 Plan:
    • Tatlow+W15th
    • Ruffus/Kirkstone and Brooksbank to connect to Casano/Loutet overpass
    • Hunter street bridge in Lynn Creek TC
      • design has started, construction start in summer.
    • Steep MUP from Deep Cove to Parkgate via Indian River neighbourhood
    • Upper LV Road (Phase I) from TC to Peters Road in 2021. Peters to Dempsey planned for 2022 but may be included in Phase I.
    • Upper LVR improvements contingent on obtaining third party infrastructure funding. Assuming funding is successful it means the "DNV will be spending 50% of the transportation budget on active transportation according to Mayor Little."
    • Meeting with Ingrid on January 19 to go over HUB priorities.
    • Meeting with Ingrid January 26 on upper Lynn Valley Rd. uphill protected bike path currently in the design stage.
  • also ask about budget for missing Wayfinding signage
  • Other
    • DNV did not buy bike path sweeper in 2020 due to Covid, but not sure if it is in the 2021 budget request.
    • Started discussion of adding protection to bike lanes on Mountain south of the Hwy Overpass
    • Draft designs for a MUP on east and west side of Mountian Hwy north of the overpass.

District of West Vancouver - Paul/Peter/Mike

MOTI - Antje/Don

  • Lower Lynn - Monthly meeting
    • Mountain Hwy Interchange
      • HUB feedback to action items from active transportation safety audit - most items are good, but the consultant missed a few issues
      • 4m MUP along westbound Mtn Hwy offramp problematic as shown in design - to discuss in our next meeting
  • BC Economic Recovery funding - for MoTI
    • started in Nov, must be spend by March!
    • HUB provided feedback to design team (Parsons) on early design of Lynn Valley Rd underpass and Capilano Rd interchange
    • 3 North Shore Projects:
      • Lynn Valley Rd Underpass - Design only (ready to put out to tender) - currently early draft
        • 2m bikeway next to 2m pedestrian path, less thought underpass
        • Congested section N of underpass due to property line and future crossing of new greenway
        • Requested removal of slip lanes, or making them more orthogonal to improve sightlines & safety.
      • Capilano Road interchange - Design only (ready to put out to tender) - currently early draft
        • 4m MUP from EB Hwy to Cap Road
        • 4m bi-directional bikelane + sidewalk from Cap rd to Keith
        • Improved South intersection crossings & islands (NB)
        • 2m Bikelane next to 2m sidewalk NB on Capilano Rd (1.8+1.8 north of bridge)
        • 2M Bikelane next to existing sidewalk SB on Capilano Rd
      • Lion Gate Bridge improvements - (Not just a design)
        • No details yet
  • Hwy 1 North Shore Corridor Study Lynn Valley to Horseshoe Bay
    • Still waiting for draft report

Communications & Outreach - Heather/Antje/Giacomo/Paul

  • We are working on a communications plan